ATCP 50.81(2) (2)Cost-share eligibility. A cost-share grant under s. ATCP 50.40 may reimburse costs incurred for the permanent relocation or abandonment of an animal feeding operation if all of the following conditions are met:
ATCP 50.81(2)(a) (a) The department or the county land conservation committee finds that relocation or abandonment is the most practical and cost-effective way to achieve compliance with state or local regulations.
ATCP 50.81(2)(b) (b) The department approves the relocation or abandonment plan.
ATCP 50.81(2)(c) (c) The landowner agrees, in a covenant that runs with the land, that no person may reestablish an animal feeding operation at that site unless the department determines that the reestablished operation complies with s. ATCP 50.04. The department may waive this requirement if the department finds that the covenant is unnecessary.
ATCP 50.81(2)(d) (d) The covenant under par. (c) is recorded in the office of the register of deeds for each county in which the property is located.
ATCP 50.81(3) (3)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse any of the following costs to relocate or abandon an animal feeding operation:
ATCP 50.81(3)(a) (a) Costs to install manure management systems and other conservation practices under this subchapter at a new site, as authorized under this chapter.
ATCP 50.81(3)(b) (b) Costs to abandon and rehabilitate the current site, including costs for any of the following:
ATCP 50.81(3)(b)1. 1. Removing concrete paving, fencing, bunks, livestock housing structures, livestock feeding structures and other obstructions.
ATCP 50.81(3)(b)2. 2. Grading and establishing vegetation on the site.
ATCP 50.81(3)(b)3. 3. Excluding livestock from the site.
ATCP 50.81(3)(b)4. 4. Abandoning wells on the site.
ATCP 50.81(3)(c) (c) Costs to move buildings and other structures.
ATCP 50.81(3)(d) (d) Costs to transport animals to a site in this state that is not on the same farm, up to a maximum of $5,000.
ATCP 50.81(3)(e) (e) Costs for livestock buildings and associated facilities needed to maintain the transferred livestock at the new site if all of the following apply:
ATCP 50.81(3)(e)1. 1. The department determines that the relocation is necessary to comply with s. ATCP 50.04 and is cost-effective.
ATCP 50.81(3)(e)2. 2. The cost-share grant does not exceed the appraised value of the buildings and associated facilities at the current site, or 70% of the costs of the replacement buildings and associated facilities, whichever is less.
ATCP 50.81(3)(e)3. 3. The relocation will not cause a violation of s. ATCP 50.04.
ATCP 50.81 Note Note: Cost-share grants under this section are subject to the limitations specified in s. ATCP 50.42.
ATCP 50.81(4) (4)Ineligible costs. A cost-share grant under s. ATCP 50.40 may not reimburse any costs to reestablish an animal feeding operation that has been abandoned under this section.
ATCP 50.81(5) (5)Design, construction and maintenance. A cost-share grant may not reimburse the cost of relocating or abandoning an animal feeding operation unless all of the following apply:
ATCP 50.81(5)(a) (a) The relocation or abandonment complies with the NRCS technical guide standards for the conservation practices in this subchapter.
ATCP 50.81(5)(b) (b) The landowner agrees to maintain the relocated operation, if any, for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.81 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02.
ATCP 50.82 ATCP 50.82 Residue management.
ATCP 50.82(1)(1)Definition. In this section, "residue management" means any of the following:
ATCP 50.82(1)(a) (a) Preparing land surfaces for the planting and growing of crop plants using methods that result in a rough land surface which is covered in varying degrees by vegetative residues of a previous crop, and which provides a significant degree of resistance to soil erosion by raindrop impact, surface water runoff or wind.
ATCP 50.82(1)(b) (b) Planting crop seeds in a narrow slot or a narrow strip of tilled soil, in order to maintain residue cover and avoid disturbing the entire soil surface.
ATCP 50.82(2) (2)Eligible costs.
ATCP 50.82(2)(a)(a) A cost-share grant under s. ATCP 50.40 may reimburse costs for any of the following residue management practices:
ATCP 50.82(2)(a)1. 1. No-till practices.
ATCP 50.82(2)(a)2. 2. Chisel plowing.
ATCP 50.82(2)(a)3. 3. Disking.
ATCP 50.82(2)(a)4. 4. Till-planting practices.
ATCP 50.82(2)(a)5. 5. Other, similar practices.
ATCP 50.82(2)(b) (b) For cost-sharing purposes, the cost of residue management practices shall be based on prevailing prices charged by providers of custom residue management services in the surrounding area.
ATCP 50.82(3) (3)Ineligible costs. A cost-share grant may not reimburse costs for both this practice and the cover and green manure crop practice for the same acreage in the same year, without department approval.
ATCP 50.82(4) (4)Design, construction and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse residue management costs unless all of the following conditions are met:
ATCP 50.82(4)(a) (a) Land subject to residue management is protected from erosion from the time of harvest until after the next planting. Protection may be provided by a cover crop residue, temporary cover or another approved practice. The residue, temporary cover or other approved practice shall cover at least 30% of the land.
ATCP 50.82(4)(b) (b) On lands with slopes greater than 6%, all tillage and planting operations are performed as nearly as practicable on the contour or parallel to terraces.
ATCP 50.82(4)(c) (c) The residue management complies with all of the following applicable standards:
ATCP 50.82(4)(c)1. 1. NRCS technical guide residue and tillage management-no till/strip till/direct seed standard 329 (October, 2006).
ATCP 50.82(4)(c)2. 2. NRCS technical guide residue and tillage management-mulch till standard 345 (October, 2006).
ATCP 50.82(4)(c)3. 3. NRCS technical guide residue management-seasonal standard 344 (October, 2006).
ATCP 50.82 Note Note: For information on how to obtain NRCS technical guide standards, including any secondary standards incorporated by reference in those standards, see Appendix G.
ATCP 50.82(4)(d) (d) The landowner agrees to maintain the residue management practice for each cropping season for which cost-sharing is provided.
ATCP 50.82 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (4) (c) 1. to 3. Register April 2009 No. 640, eff. 5-1-09.
ATCP 50.83 ATCP 50.83 Riparian buffers.
ATCP 50.83(1)(1)Definition. In this section, "riparian buffer" means an area in which vegetation is enhanced or established to reduce or eliminate the movement of sediment, nutrients and other nonpoint source pollutants to an adjacent surface water resource or groundwater recharge area, to protect the banks of streams and lakes from erosion, and to protect fish habitat.
ATCP 50.83(2) (2)Eligible costs. A cost-share grant may reimburse any of the following costs:
ATCP 50.83(2)(a) (a) Permanent fencing to protect a riparian buffer.
ATCP 50.83(2)(b) (b) Costs to establish or enhance permanent vegetative cover in a riparian buffer, or to provide temporary cover until permanent cover is established. This may include costs for mulch, fertilizer, seed, seedling trees and other necessary materials.
ATCP 50.83(2)(c) (c) Costs to shape, smooth or prepare the riparian buffer before establishing a permanent vegetative cover.
ATCP 50.83(2)(d) (d) Costs for land removed from agricultural production to install a riparian buffer.
ATCP 50.83(3) (3)Design, construction and maintenance standards. A cost-share grant may not reimburse riparian buffer costs unless all of the following conditions are met:
ATCP 50.83(3)(a) (a) The riparian buffer system complies with all of the following that apply:
ATCP 50.83(3)(a)1. 1. NRCS technical guide critical area planting standard 342 (June, 2002).
ATCP 50.83(3)(a)2. 2. NRCS technical guide fence standard 382 (November, 1999).
ATCP 50.83(3)(a)3. 3. NRCS technical guide field border standard 386 (May, 2002).
ATCP 50.83(3)(a)4. 4. NRCS technical guide filter strip standard 393 (January, 2001).
ATCP 50.83(3)(a)5. 5. NRCS technical guide use exclusion standard 472 (June, 2002).
ATCP 50.83(3)(a)6. 6. NRCS technical guide mulching standard 484 (June, 2002).
ATCP 50.83(3)(a)7. 7. NRCS technical guide riparian forest buffer standard 391 (January, 2001).
ATCP 50.83(3)(a)8. 8. NRCS technical guide shoreland habitat standard 643A (July, 2001).
ATCP 50.83(3)(a)9. 9. NRCS technical guide wildlife upland habitat management standard 645 (July, 2000).
ATCP 50.83 Note Note: For information on how to obtain NRCS technical guide standards, including any secondary standards incorporated by reference in those standards, see Appendix G.
ATCP 50.83(3)(b) (b) The landowner agrees to maintain the riparian buffer for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.83 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (3) (a) 1., 2., 5. and 6. Register April 2009 No. 640, eff. 5-1-09.
ATCP 50.84 ATCP 50.84 Roofs.
ATCP 50.84(1)(1)Definitions. In this section:
ATCP 50.84(1)(a) (a) "Roof" means a weather-proof covering that shields an animal lot or manure storage structure from precipitation, and includes the structure supporting that weather-proof covering. "Roof" does not include, except in the case of a manure storage structure, a covering over an enclosed structure if the sum of the length of the walls of the structure exceeds 50% of the perimeter of the covering. If a structure includes 2 or more square or rectangular areas, the ratio of wall length to covering perimeter shall be separately calculated for each square or rectangular area, excluding common sides.
ATCP 50.84(1)(b) (b) "Wall" means a vertical expanse in which more than 50% of the opening from eave to floor or ground is composed of a solid building material. The building material need not be rigid.
ATCP 50.84(2) (2)Cost-share eligibility. A cost-share grant under s. ATCP 50.40 may reimburse the cost of constructing a roof if the county land conservation committee finds that the roof construction is the most practical and cost-effective way to achieve compliance with state or local regulations.
ATCP 50.84(3) (3)Eligible costs. A cost-share grant under s. ATCP 50.40 may reimburse the cost of designing and constructing a roof, over an existing or relocated animal lot or manure storage structure, that is necessary to prevent barnyard runoff or discharges from a manure storage structure.
ATCP 50.84(4) (4)Ineligible costs. A cost-share grant under s. ATCP 50.40 may not reimburse any of the following:
ATCP 50.84(4)(a) (a) Costs to install walls or to enclose a roofed area.
ATCP 50.84(4)(b) (b) Costs to design or construct a building or structure other than a roof.
ATCP 50.84(4)(c) (c) Costs to install a roof over feed storage, machinery storage or animal housing areas, except as provided in sub. (3).
ATCP 50.84(5) (5)Design, construction and maintenance. A cost-share grant under s. ATCP 50.40 may not reimburse the cost of installing a roof unless all of the following conditions are met:
ATCP 50.84(5)(a) (a) The roof complies with the american society of civil engineers, "Minimum Design Loads for Buildings and Other Structures," ASCE/SEI 7-05 (2006).
ATCP 50.84 Note Note: Copies of ASCE/SEI 7-05 (2006) are on file with the department and the legislative reference bureau. Copies may be obtained from ASCE Publications, 1801 Alexander Bell Drive, Reston, VA 20191. Phone: (800) 548-asce (2723) or the following web address: www.asce.org/asce.cfm.
ATCP 50.84(5)(b) (b) The roof structure has sufficient ventilation to protect farm operators, livestock and the roof.
ATCP 50.84(5)(c) (c) The roof and supporting structure are constructed of materials with a life expectancy of 10 years or more.
ATCP 50.84(5)(d) (d) The landowner agrees not to establish additional outdoor animal lots on the site for the duration of the cost-share agreement maintenance period, except with adequate runoff control practices approved by the department.
ATCP 50.84(5)(e) (e) The landowner agrees not to convert a roofed animal lot structure, cost-shared under this chapter, for use other than as an animal lot.
ATCP 50.84(5)(f) (f) The landowner agrees to maintain the roof for 10 years unless farming operations on the affected land are discontinued.
ATCP 50.84 History History: CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: r. and recr. (5) (a) Register April 2009 No. 640, eff. 5-1-09.
ATCP 50.85 ATCP 50.85 Roof runoff systems.
ATCP 50.85(1)(1)Definition. In this section, "roof runoff system" means facilities for collecting, controlling, diverting, and disposing of precipitation from roofs. A "roof runoff system" may include gutters, downspouts, erosion-resistant channels, subsurface drains and trenches.
Loading...
Loading...
The Wisconsin Administrative Code on this web site is updated on the 1st day of each month, current as of that date. See also Are the Codes on this Website Official?