SPS 320.07(76)
(76) "Vent" means a vertical flue or passageway to vent fuel-burning appliances.
SPS 320.07(77)
(77) A "vent connector" is a connector between a fuel-burning appliance and the chimney or vent.
SPS 320.07(77f)
(77f) "Water-resistive barrier" means a material, including flashing, behind an exterior wall covering that is intended to resist liquid water that has penetrated behind the permanent weather-resistant finish from further intruding into the exterior wall assembly.
SPS 320.07(77m)
(77m) "Waters of the state" includes those portions of Lake Michigan and Lake Superior within the boundaries of Wisconsin, and all lakes, bays, rivers, streams, springs, ponds, wells, impounding reservoirs, marshes, watercourses, drainage systems and other surface waters or groundwaters, natural or artificial, public or private, within the state or its jurisdiction.
SPS 320.07(78)
(78) "Window" means a glazed opening in an exterior wall, including glazed portions of doors, within a conditioned space.
SPS 320.07(78m)
(78m) "Wisconsin Administrative Permit" means a permit issued by a municipality that does not conduct inspections or plan reviews under this code.
SPS 320.07(79)
(79) "Wisconsin insignia" means a device or seal approved by the department to certify compliance with this code.
SPS 320.07 History
History: Cr.
Register, November, 1979, No. 287, eff. 6-1-80; cr. (34m) and (36m),
Register, February, 1985, No. 350, eff. 3-1-85; am. (8), (22), (36m), (50), (58), (62) and (74), r. (18) and (53), renum. (26) to (29m) and am., cr. (34r), (38m), (40m), (59m) and (65m), r. and recr. (38),
Register, January, 1989, No. 397, eff. 2-1-89; am. (16), (34m), (40), (52) (a) (intro.) and (b), cr. (21m),
Register, March, 1992, No. 435, eff. 4-1-92; am. (16), cr. (intro), (8m), (28t), (28v), (63m), (65r) and (77m),
Register, September, 1992, No. 441, eff. 12-1-92; am. (4) and (65r), renum. (62) to be (73r), cr. (26), (62), (78m),
Register, November, 1995, No. 479, eff. 12-1-95; emerg. cr. (7m), (34L) and (40f), eff. 5-8-96; correction in (23) made under s. 13.93 (2m) (b) 7., Stats.,
Register, October, 1996, No. 490; emerg. cr. (7m), (34L) and (40f), eff. 5-8-96; cr. (7m), (15m), (34g), (34h) and (34i), renum. (34k) to be (34e),
Register, February, 1997, No. 494, eff. 3-1-97; r. (22), (27m), (39), (73r) and (74),
Register, January, 1999, No. 517, eff. 2-1-99; cr. (19m), (40t) and (59t),
Register, April, 2000, No. 532, eff. 7-1-00; r. (4m), (28), (28r), (41m), (45), (56m), (60) and (73m), cr. (10m), (15g), (24m), (24r), (33m), (34f), (53), (53m), and (55m), r. and recr. (17) and (36) and am. (47) and (61),
Register, March, 2001, No. 543, eff. 4-1-01;
CR 00-159: cr. (60m) and (75m),
Register September 2001 No. 549 eff. 12-1-01;
CR 02-077: cr. (10t), r. and recr. (29) and (35)
Register May 2003 No. 569, eff. 8-1-03;
CR 05-113: cr. (19r), (46m) and (67m), r. (28v) and (63m), r. and recr. (65r)
Register December 2006 No. 612, eff. 4-1-07;
CR 06-071: am. (52) (b), cr. (52m)
Register December 2006 No. 612, eff. 4-1-07;
CR 08-043: cr. (5m), (18), (34s), (53f) and (77f), r. (29m) and (52)
Register March 2009 No. 639, eff. 4-1-09; correction in (intro.), (16), (23), (50), (75m) made under s. 13.92 (4) (b) 6., 7., Stats.,
Register December 2011 No. 672.
SPS 320.08
SPS 320.08
Wisconsin uniform building permit. SPS 320.08(1)(1)
Where required. Except as provided under
s. SPS 320.09 (9) (b), a Wisconsin uniform building permit shall be obtained from the municipality administering and enforcing this code or from a registered UDC inspection agency administering and enforcing this code in a municipality where the department has jurisdiction pursuant to s.
101.651 (3) (b), Stats., before any on–site construction, including excavation for a structure, may begin.
SPS 320.08(2)
(2) Inspections. A person who obtains a Wisconsin uniform building permit from a registered UDC inspection agency shall retain the same agency to conduct the inspections for the project under
s. SPS 320.10.
SPS 320.08 Note
Note: Section
SPS 320.09 (9) (b) permits the issuance of a footing and foundation permit prior to the issuance of the Wisconsin uniform building permit.
SPS 320.08 History
History: Cr.
Register, November, 1979, No. 287, eff. 6-1-80; am.
Register, September, 1992, No. 441, eff. 12-1-92;
CR 00-159: r. and recr.,
Register September 2001 No. 549 eff. 12-1-01;
CR 03-097: am. (1)
Register November 2004 No. 587, eff. 1-1-05; correction in (1) made under s. 13.93 (2m) (b) 7., Stats.,
Register August 2007 No. 620; correction in (1) made under s. 13.92 (4) (b) 7., Stats.,
Register March 2009 No. 639; correction in (1), (2) made under s. 13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 320.085
SPS 320.085
Notices of intent and termination. SPS 320.085(1)(a)(a) A notice of intent shall be filed by the owner or owner's agent when land disturbing construction activity involves one or more acres.
SPS 320.085(1)(b)
(b) For the purposes of
par. (a), the application for the UDC permit and the submission of plans under
s. SPS 320.09 shall constitute the notice of intent process.
SPS 320.085(1)(c)
(c) The submittal of a notice of intent to the department for a construction site with one or more acres of land disturbing construction activity constitutes an application for coverage under a storm water construction site general permit issued by the Department of Natural Resources pursuant to s.
283.33, Stats., and
ch. NR 216, which contains erosion control standards established by the Department of Safety and Professional Services pursuant to s.
101.653, Stats.
SPS 320.085 Note
Note: Although construction site notices of intent are submitted to the Department of Safety and Professional Services, coverage under the Department Natural Resources' storm water construction site general permit is required by the United States Environmental Protection Agency in accordance with its delegation of Clean Water Act permit authority to the Department of Natural Resources.
SPS 320.085 Note
Note: Department of Natural Resources rules under s.
NR 216.42 (9) state: "Storm water discharges from construction sites of one- and two-family dwellings regulated by the department of safety and professional services pursuant to s.
101.653, Stats., in a manner which is equivalent to the requirements of this subchapter as determined by the department in writing, shall be deemed to hold a WPDES permit issued pursuant to this subchapter." Sites deemed to hold a WPDES permit are subject to DNR enforcement for violations of permit conditions.
SPS 320.085(2)(a)(a) The owner or owner's agent shall submit a notice of termination in a format prescribed by the department for a site where a notice of intent is required under this section.
SPS 320.085(2)(b)
(b) The notice of termination shall be submitted when all of the following have occurred:
SPS 320.085(2)(b)2.
2. All disturbed areas have been stabilized. A disturbed area shall be considered stabilized by vegetation when a perennial cover has been established with a density of at least 70 percent.
SPS 320.085 History
History: CR 05-113: cr.
Register December 2006 No. 612, eff. 4-1-07; correction in (1) (b), (c) made under s.
13.92 (4) (b) 6.,
7., Stats.,
Register December 2011 No. 672.
SPS 320.09
SPS 320.09
Procedure for obtaining uniform building permit. SPS 320.09(1)(1)
Application. Application for a Wisconsin uniform building permit shall be on forms obtained from the department, the municipality or the authorized UDC inspection agency administering and enforcing this code. No application shall be accepted that does not contain all the information requested on the form.
SPS 320.09 Note
Note: See appendix for a copy of the Wisconsin uniform building permit and application.
SPS 320.09 Note
Note: Any municipality exercising jurisdiction may require reasonable supplementary information not contained on the Wisconsin building permit application.
SPS 320.09(2)(a)1.1. A Wisconsin uniform building permit application for the construction or installation of a dwelling shall be filed with the municipality or the authorized UDC inspection agency administering and enforcing this code.
SPS 320.09(2)(a)2.
2. The municipality or authorized UDC inspection agency shall forward a copy of all applications for new dwellings to the department within 30 business days after permit issuance.
SPS 320.09 Note
Note: The department requires copies of permits that are issued for new dwelling construction or installation, only. Permits issued for additions, alterations, garage construction, etc., should not be filed with the department.
SPS 320.09(2)(b)1.1. When required by local ordinance, permit applications for additions, alterations and repairs shall be filed with municipalities and counties in accordance with their adopted ordinances.
SPS 320.09 Note
Note: The Department of Safety and Professional Services requires copies of permits that are issued for new dwelling construction only. Any permits issued for additions, alterations, repairs, garage construction, etc. are not required to be filed with the department.
SPS 320.09(2)(b)3.
3. Building permits for additions, alterations and repairs are not required in municipalities where the department has jurisdiction under s.
101.651 (3) (b), Stats.
SPS 320.09(2)(c)1.1. The permit application shall be reviewed by a certified UDC inspector.
SPS 320.09(2)(c)2.
2. A permit may be issued only after approval of the requirements under this section by a certified UDC inspector.
SPS 320.09(3)(a)1.1. The municipality shall, by ordinance, determine fees to cover expenses of plan examination, inspection and the issuance of the Wisconsin uniform building permit.
SPS 320.09(3)(a)2.
2. The municipality shall purchase a Wisconsin uniform building permit seal from the department for each new dwelling in accordance with
s. SPS 302.34.
SPS 320.09(3)(b)1.1. UDC inspection agency fees shall be determined by contract between the municipality and the agency or between the department and the agency, where the agency has been authorized to conduct inspections on behalf of the department.
SPS 320.09(3)(b)2.
2. A UDC inspection agency shall purchase a Wisconsin uniform building permit seal from the department in accordance with
s. SPS 302.34.
SPS 320.09(4)
(4) Plan submittals. At least 2 sets of plans for all one- and 2-family dwellings shall be submitted to the municipality or authorized UDC inspection agency administering and enforcing this code, for examination and approval at the time the Wisconsin uniform building permit application is filed.
SPS 320.09(5)
(5) Required plans. The required building plans shall be legible and drawn to scale or dimensioned and shall include all of the following:
SPS 320.09(5)(a)1.
1. The location of the dwelling and any other buildings, wells, surface waters and dispersal systems on the site with respect to property lines and surface waters adjacent to the site.
SPS 320.09(5)(a)2.
2. The areas of land-disturbing construction activity and the location of all erosion and sediment control measures to be employed in order to comply with
s. SPS 321.125.
SPS 320.09(5)(a)3.
3. The pre-construction ground surface slope and direction of runoff flow within the proposed areas of land disturbance.
SPS 320.09(5)(b)2.a.
a. The size and location of all rooms, doors, windows, structural features, exit passageways and stairs.
SPS 320.09(5)(b)2.c.
c. The location of plumbing fixtures, chimneys, heating and cooling appliances, and a heating distribution layout.
SPS 320.09(5)(c)
(c)
Elevations. The elevations shall show all of the following:
SPS 320.09(5)(c)1.
1. The exterior appearance of the building, including the type of exterior materials.
SPS 320.09(5)(c)2.
2. The location, size and configuration of doors, windows, roof, chimneys, exterior grade, footings and foundation walls.
SPS 320.09(5)(d)1.1. A storm water management plan shall be prepared for a site where one acre or more of land will be disturbed.
SPS 320.09(5)(d)2.
2. The storm water management plan shall delineate and describe the post-construction storm water management practices to be employed to comply with
s. SPS 321.126.
SPS 320.09(6)(a)(a) All plans submitted for approval shall be accompanied by sufficient data, calculations and information to determine if the dwelling will meet the requirements of this code.
SPS 320.09(6)(b)
(b) The data and information for determining compliance with the energy conservation standards shall be submitted in a format approved by the department.
SPS 320.09(6)(c)
(c) Except as required under
s. SPS 321.33, a municipality exercising jurisdiction may not require plans or calculations to be stamped or sealed by an architect or engineer.
SPS 320.09(6)(d)
(d) The name of the initial downstream receiving water of the state from the dwelling shall be identified, regarding erosion and sediment control and storm water management.
SPS 320.09(7)(a)(a) Where a dwelling is intended to be identically and repetitively constructed at different locations, a master plan may be submitted for approval.
SPS 320.09(7)(c)
(c) If the plans conform to the provisions of the code, an approval and a master plan number shall be issued.
SPS 320.09(7)(d)
(d) The number issued may be used in lieu of submitting building plans for each location.
SPS 320.09(7)(e)
(e) A plot plan shall be submitted for each location at the time of application for the Wisconsin uniform building permit.
SPS 320.09(8)(a)(a) If the municipality or authorized UDC inspection agency administering and enforcing the code determines that the plans submitted for a one- or 2-family dwelling substantially conform to the provisions of this code and other legal requirements, an approval shall be issued.
SPS 320.09(8)(b)
(b) The plans shall be stamped "conditionally approved" by a certified inspector who holds the respective credential for the plans reviewed.
SPS 320.09(8)(c)
(c) One copy shall be returned to the applicant and one copy shall be retained by the municipality or authorized UDC inspection agency administering and enforcing this code.
SPS 320.09(8)(d)
(d) The conditions of approval shall be indicated by a letter or on the permit.