SPS 382.20(4) (4)Plans and specifications.
SPS 382.20(4)(a)(a) At least 2 sets of plans and one copy of specifications which are clear, legible and permanent copies shall be submitted for examination and approval.
SPS 382.20(4)(b) (b) All plans submitted for approval shall be accompanied by sufficient data and information for the department to determine if the installation and its performance will meet the requirements of chs. SPS 381 to 384.
SPS 382.20(4)(b)1. 1. Information to accompany the plans shall include the location or address of the installation and the name of the owner.
SPS 382.20(4)(b)2. 2. Plans proposing the installation, creation or extension of a sanitary private interceptor main sewer which is to discharge to a municipal treatment facility shall:
SPS 382.20(4)(b)2.a. a. Be accompanied by a letter from the appropriate designated planning or management agency indicating conformance with an approved areawide water quality management plan under ch. NR 121; and
SPS 382.20(4)(b)2.b. b. Not be approved, if the municipality is ineligible for sanitary sewer extension approvals under s. NR 110.05.
SPS 382.20 Note Note: For plans proposing the installation, creation or extension of a private interceptor main sewer which is to discharge to a municipal treatment facility, see also ch. NR 121.
SPS 382.20(4)(b)3. 3. Except as provided in subd. 4., plans proposing the installation of a building sewer for new construction which is to discharge to a municipal treatment facility shall:
SPS 382.20(4)(b)3.a. a. Be accompanied by a letter from either the appropriate designated management agency or sanitary district indicating conformance with an approved areawide water quality management plan; and
SPS 382.20(4)(b)3.b. b. Not be approved, if the municipality is ineligible for sanitary sewer extension approvals under s. NR 110.05.
SPS 382.20(4)(b)4. 4. Plans proposing the installation of a building sewer for new construction which is to discharge to a municipal treatment facility shall not be required to comply with subd. 3., if:
SPS 382.20(4)(b)4.a. a. The proposed installation is served by an existing building sewer which extends from the lot line to the public sewer and the proposed installation does not exceed the capacity of the existing building sewer or sewers; or
SPS 382.20(4)(b)4.b. b. The plans indicate that a drainage load of not more than 54 drainage fixture units will be discharged through the building sewer.
SPS 382.20 Note Note: See ch. SPS 382 Appendix for listing of water quality management agencies.
SPS 382.20(4)(c) (c) Plumbing plans, index sheets and specifications for a plumbing system submitted for review and approval shall be signed in accordance with any of the following methods:
SPS 382.20(4)(c)1. 1. A Wisconsin registered architect, engineer or plumbing designer shall sign and seal or stamp all plans and accompanying specifications in accordance with ch. A-E 2.
SPS 382.20(4)(c)2. 2. A master plumber, master plumber-restricted service, master plumber-restricted appliance or a utility contractor shall sign and date all plumbing plans and accompanying specifications as provided under s. 145.06, Stats. Each sheet of plans and specifications submitted shall be signed and dated and shall include the valid Wisconsin license number of the individual responsible for the installation. Where more than one sheet is bound together into one volume, only the title sheet or index sheet shall be signed and dated by the individual responsible for the installation. The signed title or index sheet shall clearly identify all of the other sheets in the volume.
SPS 382.20(4)(c)3. 3. A pump installer shall sign and date all plumbing plans and accompanying specifications for which the individual is responsible for the installation. Each sheet of plans and specifications submitted shall be signed and dated and shall include the valid Wisconsin license number of the individual responsible for the installation. Where more than one sheet is bound together into one volume, only the title sheet or index sheet shall be signed and dated by the individual responsible for the installation. The signed title or index sheet shall clearly identify all of the other sheets in the volume.
SPS 382.20(4)(d)1.1. When requesting approval of an experimental plumbing system, all of the following shall be submitted:
SPS 382.20(4)(d)1.a. a. At least 2 sets of plans signed in accordance with par. (d) and detailing the system installation for each site.
SPS 382.20(4)(d)1.b. b. A letter of consent from the site or system owner of the installation. The letter shall acknowledge that the owner has received and read a copy of the experimental plumbing system submittal and is in agreement with all requirements listed within this subdivision.
SPS 382.20(4)(d)1.c. c. Any additional information as requested by the department.
SPS 382.20(4)(d)2. 2. The registered architect, engineer, designer or master plumber responsible for the design of the experimental plumbing system shall, upon completion, certify in writing to the department that the installation is in compliance with the approved plans, specifications and data.
SPS 382.20(4)(d)3. 3. Onsite inspections shall be performed by the department at time intervals as specified by the department, but not less than once a year. Time intervals shall be included as conditions of approval. An inspection report shall be written. The department may assess a fee for each inspection.
SPS 382.20 Note Note: Refer to ch. SPS 302 for applicable fees.
SPS 382.20(4)(d)4. 4. No later than five years after the date of the completed installation the department may perform one of the following:
SPS 382.20(4)(d)4.a. a. Order the removal of the experimental plumbing system.
SPS 382.20(4)(d)4.b. b. Issue an alternate approval as specified in sub. (12) (a).
SPS 382.20(4)(d)4.c. c. Provide an extension of the experiment with conditions.
SPS 382.20(4)(d)5. 5. If an experimental plumbing system is subsequently codified in chs. SPS 382 and 384, or ch. 145, Stats., the requirements as specified in subds. 3. and 4. do not apply.