subch. VIII of ch. SPS 341 Subchapter VIII — Pressure Vessels in Petroleum Refineries
SPS 341.80 SPS 341.80General requirements. Pressure vessels in petroleum refineries shall comply with the standards specified in API 510.
SPS 341.80 History History: Cr. Register, February, 2000, No. 530, eff. 3-1-00.
subch. IX of ch. SPS 341 Subchapter IX - Historical Boilers
SPS 341.90 SPS 341.90Application. This subchapter applies to all historical boilers in operation for demonstration purposes at fairs, museums, steam shows, historical attractions or any other locations frequented by the public.
SPS 341.90 History History: CR 05-025: cr. Register October 2005 No. 598, eff. 11-1-05; correction made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 11-047: am. Register May 2012 No. 677, eff. 6-1-12.
SPS 341.91 SPS 341.91General requirements.
SPS 341.91(1) (1) Historical boilers shall be inspected in accordance with NBIC part 2 section 6-supplement 2, Historical Boilers.
SPS 341.91(2) (2) The owner or user shall obtain and maintain a valid permit to operate in accordance with s. SPS 341.24.
SPS 341.91(3) (3) The permit to operate shall be displayed on the historical boiler near the controls during operation at any public location.
SPS 341.91(4) (4) Welded repairs or alterations shall comply with subch. VI.
SPS 341.91 History History: CR 05-025: cr. Register October 2005 No. 598, eff. 11-1-05; CR 08-028: am. (title) and (1), r. (2) and (3), renum. (4) to (6) to be (2) to (4) Register November 2008 No. 635, eff. 12-1-08; correction in (2) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 11-047: am. (title), (1) Register May 2012 No. 677, eff. 6-1-12.
SPS 341.92 SPS 341.92Testing, maintenance and out-of-state boilers.
SPS 341.92(1)(1)Testing.
SPS 341.92(1)(a)1.1. Except as specified in subd. 2., historical boilers complying with any of the following are exempt from the required ultrasonic testing and calculation requirements:
SPS 341.92(1)(a)1.a. a. Historical boilers bearing an ASME “S" stamp.
SPS 341.92(1)(a)1.b. b. Historical boilers complying with the Wisconsin special vessel requirements specified under s. SPS 341.43.
SPS 341.92(1)(a)2. 2. A certified inspector may require ultrasonic testing and calculations for any historical boiler based on conditions observed during visual or hydrostatic examination.
SPS 341.92(1)(b) (b) The owner or user of a historical boiler shall maintain the initial and subsequent ultrasonic thickness test grid map and pressure calculations in the permanent boiler records to verify fitness for service and to be used as a reference for future repair analysis.
SPS 341.92(1)(c) (c) Historical boilers shall comply with s. SPS 341.30 (1) (c).
SPS 341.92 Note Note: The owner or user may use the NBIC form C-1: Initial Boiler Certification Report. The form is available for a nominal fee at telephone 800-DOC-SALE or 411 (Telecommunications Relay), or at docsales@doa.state.wi.us, or at no charge at the Department's Web site at www.dsps.wi.gov through links to Division of Industry Services forms.
SPS 341.92(2) (2)Reciprocity with other states.
SPS 341.92(2)(a)(a) The owner or user of an out-of-state historical boiler shall provide ultrasonic thickness test and pressure-calculation documentation in accordance with NBIC part 2 section 6-supplement 2, Historical Boilers.
SPS 341.92(2)(b) (b) The owner or user of an out-of-state historical boiler shall provide copies of welded repair or alteration documentation as required in s. SPS 341.38 (2).
SPS 341.92(2)(c) (c) The owner or user of an out-of-state historical boiler shall provide a copy of the valid jurisdictional certificate of operation or permit to operate from another state.
SPS 341.92(2)(d) (d) The owner or user of an out-of-state historical boiler shall arrange for an inspection after the certified inspector receives, reviews and accepts the documentation as required in pars. (a) and (b). Inspectors shall be given at least 5 business days advance notice to arrange for the inspection.
SPS 341.92(2)(e) (e) Upon satisfactory inspection, the owner or user of the out-of-state historical boiler shall obtain a valid permit to operate and post the permit as required in s. SPS 341.91 (3) prior to operation.
SPS 341.92 History History: CR 05-025: cr. Register October 2005 No. 598, eff. 11-1-05; CR 08-028: r. and recr. (title) and (1), r. (2) and (3), renum. (4) to be (2) and am. (2) (a) and (e) Register November 2008 No. 635, eff. 12-1-08; correction in (1) (a) 1. b., (c), (2) (b), (e) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 11-047: am. (title), (2) (a) Register May 2012 No. 677, eff. 6-1-12.
SPS 341.93 SPS 341.93Interruption of inspection cycle. If an inspection cycle under NBIC part 2 section 6 S2.7.3.2 is interrupted by delaying a required inspection for more than 1 year, the subsequent inspection cycle shall restart from the beginning of the sequence in NBIC part 2 section 6 S2.7.3., which is the initial inspection under NBIC part 2 section 6 S2.7.3.1.
SPS 341.93 History History: CR 11-047: cr. Register May 2012 No. 677, eff. 6-1-12.