LRBa1024/1
ALL:all
August 2017 Special Session
2017 - 2018 LEGISLATURE
ASSEMBLY AMENDMENT 23,
TO ASSEMBLY SUBSTITUTE AMENDMENT 1,
TO ASSEMBLY BILL 1
August 14, 2017 - Offered by Representatives Ohnstad, Stuck, Crowley and
Sinicki.
AB1-ASA1-AA23,1,11 At the locations indicated, amend the substitute amendment as follows:
AB1-ASA1-AA23,1,3 21. Page 2, line 6: after “program;" insert “creating a levy limits exception for
3a city or village containing such a zone;".
AB1-ASA1-AA23,1,4 42. Page 11, line 4: substitute “30,000,000" for “10,000,000".
AB1-ASA1-AA23,1,5 53. Page 14, line 8: after that line insert:
AB1-ASA1-AA23,1,6 6“(c) Storm water management facilities.”.
AB1-ASA1-AA23,1,7 74. Page 14, line 22: after that line insert:
AB1-ASA1-AA23,1,8 8“(c) Storm water management facilities.”.
AB1-ASA1-AA23,1,9 95. Page 15, line 24: after that line insert:
AB1-ASA1-AA23,1,10 10 Section 18k. 66.0217 (16) of the statutes is created to read:
AB1-ASA1-AA23,2,7
166.0217 (16) Expedited procedures. If a city or village acts under this section
2to annex territory that is located in a county that contains an electronics and
3information technology manufacturing zone that is designated under s. 238.396
4(1m), the time periods specified in this section relating to public notice and
5publication requirements are reduced by 50 percent. If a time period to which this
6subsection applies is an odd number, and the reduced time period calculation results
7in a fraction, the result shall be rounded up to the next whole number.
AB1-ASA1-AA23,18m 8Section 18m. 66.0219 (11) of the statutes is created to read:
AB1-ASA1-AA23,2,159 66.0219 (11) Expedited procedures. If a city or village acts under this section
10to annex territory that is located in a county that contains an electronics and
11information technology manufacturing zone that is designated under s. 238.396
12(1m), the time periods specified in this section relating to public notice and
13publication requirements are reduced by 50 percent. If a time period to which this
14subsection applies is an odd number, and the reduced time period calculation results
15in a fraction, the result shall be rounded up to the next whole number.
AB1-ASA1-AA23,18r 16Section 18r. 66.0307 (4) (b) of the statutes is amended to read:
AB1-ASA1-AA23,2,2217 66.0307 (4) (b) Public hearing. At least 60 days after adoption under par. (a)
18of the last resolution by a participating municipality and, except as provided in par.
19(bm),
at least 60 days before submitting a cooperative plan to the department for
20review and approval under sub. (5), the participating municipalities shall hold a joint
21hearing on the proposed plan. Notice of the hearing shall be given by each
22participating municipality by class 3 notice under ch. 985.
AB1-ASA1-AA23,18s 23Section 18s. 66.0307 (4) (bm) of the statutes is created to read:
AB1-ASA1-AA23,3,424 66.0307 (4) (bm) Exception, electronics and information technology
25manufacturing zone.
With regard to a municipality that is located in a county in

1which there exists an electronics and information technology manufacturing zone
2that is designated under s. 238.396 (1m), the time limit in par. (b) that relates to
3submitting a cooperative plan to the department for review and approval does not
4apply.
AB1-ASA1-AA23,18t 5Section 18t. 66.0602 (3) (m) of the statutes is created to read:
AB1-ASA1-AA23,3,96 66.0602 (3) (m) 1. Except as provided in subd. 2., the limit otherwise applicable
7under this section does not apply to a city or village that contains an electronics and
8information technology manufacturing zone that is designated under s. 238.396
9(1m).
AB1-ASA1-AA23,3,1110 2. Subdivision 1. does not apply after the first day of the 204th month beginning
11after the creation of an electronics and information technology manufacturing zone.
AB1-ASA1-AA23,18v 12Section 18v. 66.1105 (2) (bs) of the statutes is created to read:
AB1-ASA1-AA23,3,1513 66.1105 (2) (bs) “Industrial use” includes creating, expanding, remodeling, or
14maintaining facilities used for warehousing, storage, distribution, research, and
15data processing, which are related to an industrial project.”.
AB1-ASA1-AA23,3,16 166. Page 16, line 18: after that line insert:
AB1-ASA1-AA23,3,17 17 Section 19e. 66.1105 (2) (f) 2. a. of the statutes is amended to read:
AB1-ASA1-AA23,3,2418 66.1105 (2) (f) 2. a. The cost of constructing or expanding administrative
19buildings, police and fire buildings, libraries, community and recreational buildings
20and school buildings, unless the administrative buildings, police and fire buildings,
21libraries and community and recreational buildings were damaged or destroyed
22before January 1, 1997, by a natural disaster, or are being constructed or expanded
23under a project plan for a district that is created in an electronics and information
24technology manufacturing zone that is designated under s. 238.396 (1m)
.
AB1-ASA1-AA23,19f
1Section 19f. 66.1105 (2) (f) 2. b. of the statutes is amended to read:
AB1-ASA1-AA23,4,72 66.1105 (2) (f) 2. b. The cost of constructing or expanding any facility, except
3a parking structure that supports redevelopment activities or a facility that is being
4constructed or expanded under a project plan for a district that is created in an
5electronics and information technology manufacturing zone that is designated under
6s. 238.396 (1m)
, if the city generally finances similar facilities only with utility user
7fees.
AB1-ASA1-AA23,19g 8Section 19g. 66.1105 (2) (f) 2. c. of the statutes is amended to read:
AB1-ASA1-AA23,4,129 66.1105 (2) (f) 2. c. General government operating expenses, unrelated to the
10planning or development of a tax incremental district, unless such general
11government operating expenses are incurred in connection with a district created
12under sub. (20)
.
AB1-ASA1-AA23,19t 13Section 19t. 66.1105 (4) (f) of the statutes is amended to read:
AB1-ASA1-AA23,5,414 66.1105 (4) (f) Adoption by the planning commission of a project plan for each
15tax incremental district and submission of the plan to the local legislative body. The
16plan shall include a statement listing the kind, number, and location of all proposed
17public works or improvements within the district or, to the extent provided in sub.
18subs. (2) (f) 1. k. and 1. n. and (20) (c), outside the district, an economic feasibility
19study, a detailed list of estimated project costs, and a description of the methods of
20financing all estimated project costs and the time when the related costs or monetary
21obligations are to be incurred. The plan shall also include a map showing existing
22uses and conditions of real property in the district; a map showing proposed
23improvements and uses in the district; proposed changes of zoning ordinances,
24master plan, if any, map, building codes and city ordinances; a list of estimated
25nonproject costs; and a statement of the proposed method for the relocation of any

1persons to be displaced. The plan shall indicate how creation of the tax incremental
2district promotes the orderly development of the city. The city shall include in the
3plan an opinion of the city attorney or of an attorney retained by the city advising
4whether the plan is complete and complies with this section.”.
AB1-ASA1-AA23,5,5 57. Page 19, line 21: after that line insert:
AB1-ASA1-AA23,5,10 6“(f) Expedited procedures. If a city creates a tax incremental district under this
7subsection, the time periods specified in this section relating to public notice and
8publication requirements are reduced by 50 percent. If a time period to which this
9paragraph applies is an odd number, and the reduced time period calculation results
10in a fraction, the result shall be rounded up to the next whole number.”.
AB1-ASA1-AA23,5,12 118. Page 29, line 15: after “Corporation." insert “Notwithstanding s. 77.79, this
12subsection does not apply to the taxes imposed by a county under subch. V.".
AB1-ASA1-AA23,5,13 139. Page 37, line 16: after that line insert:
AB1-ASA1-AA23,5,18 14(6) Site abandonment. If a business certified by the corporation under sub.
15(3) abandons a manufacturing facility in an electronics and information technology
16manufacturing zone, the business shall demolish all buildings and other structures
17located on the land occupied by the facility and shall plant grass and perform other
18necessary site remediation.
AB1-ASA1-AA23,5,20 19(7) Partial reimbursement of local governments. (a) In this subsection,
20“local governmental unit” has the meaning given in s. 16.297 (1).
AB1-ASA1-AA23,6,221 (b) If a business certified by the corporation under sub. (3) substantially ceases
22operations, as determined by the corporation, in an electronics and information
23technology manufacturing zone while the zone is in effect under sub. (2), the business
24shall pay 30 percent of the principal and interest of a local governmental unit's

1obligation if the obligation was issued to finance costs related to development
2occurring in or for the benefit of the zone.”.
AB1-ASA1-AA23,6,3 310. Page 38, line 19: after that line insert:
AB1-ASA1-AA23,6,4 4 Section 55L. 281.346 (1) (pm) of the statutes is amended to read:
AB1-ASA1-AA23,6,95 281.346 (1) (pm) “Public water supply" means water distributed to the public
6through a physically connected system of treatment, storage, and distribution
7facilities that serve a group of largely residential customers and that may also serve
8industrial, commercial, and other institutional customers and includes water
9withdrawn directly from the Great Lakes basin and through such a system
.
AB1-ASA1-AA23,55m 10Section 55m. 281.346 (2) (c) of the statutes is renumbered 281.346 (2) (c) 1.
AB1-ASA1-AA23,55n 11Section 55n. 281.346 (2) (c) 2. of the statutes is created to read:
AB1-ASA1-AA23,6,1612 281.346 (2) (c) 2. If a person operating a public water supply system also
13operates a public wastewater system, the water loss from consumptive use of a
14person operating a public water supply system equals the difference between the
15volume of water the public water supply system withdraws from the basin minus the
16volume of water returned to the basin by the public wastewater system.
AB1-ASA1-AA23,55o 17Section 55o. 281.346 (4) (bg) 2. of the statutes is amended to read:
AB1-ASA1-AA23,7,218 281.346 (4) (bg) 2. For the purposes of applying the requirements in pars. (c),
19(e), and (f) to a proposal under par. (b), the department shall use, as appropriate, the
20current or planned service area of the public water supply system receiving water
21under the proposal. The Unless the proposal is to provide water to a straddling
22community that includes an electronics and information technology manufacturing
23zone designated under s. 238.396 (1m), the
planned service area is the service area
24of the system at the end of any planning period authorized by the department in the

1approved water supply service area plan under s. 281.348 that covers the public
2water supply system.”.
AB1-ASA1-AA23,7,3 311. Page 38, line 25: after that line insert:
Loading...
Loading...