LRBa0797/1
EVM:amn/kjf/jld
2017 - 2018 LEGISLATURE
ASSEMBLY AMENDMENT 2,
TO ASSEMBLY BILL 307
July 11, 2017 - Offered by Representative R. Brooks.
AB307-AA2,1,11 At the locations indicated, amend the bill as follows:
AB307-AA2,1,3 21. Page 2, line 21: delete the material beginning with that line and ending with
3page 3, line 15.
AB307-AA2,1,4 42. Page 3, line 20: delete lines 20 to 24.
AB307-AA2,1,7 53. Page 4, line 2: delete “repair, or maintenance" and substitute
6“reconstruction, as defined in s. 84.013 (1) (c), resurfacing, as defined in s. 84.013 (1)
7(d), or reconditioning, as defined in s. 84.013 (1) (b),".
AB307-AA2,1,10 84. Page 6, line 20: delete “repair, or maintenance" and substitute
9“reconstruction, as defined in s. 84.013 (1) (c), resurfacing, as defined in s. 84.013 (1)
10(d), or reconditioning, as defined in s. 84.013 (1) (b),".
AB307-AA2,1,11 115. Page 8, line 6: after that line insert:
AB307-AA2,1,12 12 Section 19m. 66.1333 (5) (a) 2. of the statutes is amended to read:
AB307-AA2,2,10
166.1333 (5) (a) 2. Enter into any contracts determined by the authority to be
2necessary to effectuate the purposes of this section. All contracts, other than those
3for personal or professional services, in excess of $25,000 $75,000 are subject to bid
4and shall be awarded to the lowest qualified and competent bidder. The authority
5may reject any bid required under this paragraph. The authority shall advertise for
6bids by a class 2 notice, under ch. 985, published in the city in which the project is
7to be developed. If the estimated cost of a contract, other than a contract for personal
8or professional services, is between $3,000 and $25,000 $75,000, the authority shall
9give a class 2 notice, under ch. 985, of the proposed work before the contract is entered
10into.”.
AB307-AA2,2,11 116. Page 10, line 5: after that line insert:
AB307-AA2,2,12 12 Section 22m. 200.47 (2) (a) of the statutes is amended to read:
AB307-AA2,2,2113 200.47 (2) (a) Except as provided in par. (b), all work done and all purchases
14of supplies and materials by the commission shall be by contract awarded to the
15lowest responsible bidder complying with the invitation to bid, if the work or
16purchase involves an expenditure of $20,000 $75,000 or more. If the commission
17decides to proceed with construction of any sewer after plans and specifications for
18the sewer are completed and approved by the commission and by the department of
19natural resources under ch. 281, the commission shall advertise by a class 2 notice
20under ch. 985 for construction bids. All contracts and the awarding of contracts are
21subject to s. 66.0901.”.
AB307-AA2,2,23 227. Page 10, line 8: delete “and 120.12 (5m) (b)" and substitute “120.12 (5m) (b),
23and 200.47 (2) (a)".
Loading...
Loading...