AB495,1,3 1An Act to amend 101.16 (5); and to create 101.16 (2m) of the statutes; relating
2to:
requiring the publication of a class 1 notice before approval of the
3construction of certain liquefied petroleum gas installations.
Analysis by the Legislative Reference Bureau
Under current law, the Department of Commerce (Commerce) regulates the
design, construction, location, installation, operation, repair, and maintenance of
equipment for storing, handling, using, and transporting liquefied petroleum gases
for certain uses. Under rules promulgated by Commerce, a person proposing the
construction of a liquefied petroleum gas installation that uses containers of 2,000
gallons or larger water capacity or that has an aggregate water capacity of at least
4,000 gallons must obtain approval from Commerce before beginning construction
of the installation.
This bill prohibits Commerce from approving the proposed construction of a
liquefied petroleum gas installation that uses containers of 15,000 gallons or larger
water capacity unless Commerce has published a class 1 notice of the proposed
construction at least 90 days before the date on which construction is proposed to
begin or at least 90 days before the date on which Commerce receives a request for
approval of the proposed construction, whichever is longer. A class 1 notice requires
one insertion in a newspaper likely to give notice in the area or to the persons
affected.

For further information see the state fiscal estimate, which will be printed as
an appendix to this bill.
The people of the state of Wisconsin, represented in senate and assembly, do
enact as follows:
AB495, s. 1 1Section 1. 101.16 (2m) of the statutes is created to read:
AB495,2,72 101.16 (2m) The department may not approve the proposed construction of a
3liquefied petroleum gas installation that uses containers of 15,000 gallons or larger
4water capacity unless the department has published a class 1 notice, under ch. 985,
5of the proposed construction at least 90 days before the date on which construction
6is proposed to begin or at least 90 days before the date on which the department
7receives a request for approval of the proposed construction, whichever is longer.
AB495, s. 2 8Section 2. 101.16 (5) of the statutes is amended to read:
AB495,2,139 101.16 (5) Any person, firm, association or corporation violating this section
10sub. (3) or (4), or any standard, rule, or regulation adopted by the department
11pursuant to this section, or issuing a false statement under sub. (4), shall be fined
12not less than $25 nor more than $100, or imprisoned not less than 30 days nor more
13than 6 months.
AB495, s. 3 14Section 3. Initial applicability.
AB495,2,1715 (1) This act first applies to a request to the department of commerce for
16approval of the construction of a liquefied petroleum gas installation made on the
17effective date of this subsection.
AB495,2,1818 (End)