AB378-AA5,1,11 At the locations indicated, amend the bill as follows:
AB378-AA5,1,3 21. Page 3, line 6: after "60%" insert ", as determined by the public service
3commission".
AB378-AA5,1,4 42. Page 3, line 8: delete lines 8 to 12 and substitute:
AB378-AA5,1,9 5"79.005 (1f) "Capacity factor" means the anticipated actual annual output of
6an electric generating facility expressed as a percentage of the facility's potential
7output as indicated in a certificate of public convenience and necessity or a certificate
8of authority. For purposes of this subchapter, the public service commission may
9review the capacity factor of an electric generating facility at any time.".