AB378-ASA1-AA1,1,10
4"2. If a baseload electric generating facility as described in subd. 1. is located
5on a site that is contiguous to a municipality in which the facility is not located, the
6contiguous municipality shall receive annually from the public utility account a
7payment in an amount that is equal to the number of megawatts that represents the
8production plant's name-plate capacity, multiplied by $100. A municipality that
9receives a payment under this subdivision may not receive a mitigation payment as
10defined in s. 196.20 (7) (a).".