AB437-AA1,1,6
5"196.491
(3e) Conveyance of property to an electric utility. (ag) In this
6subsection, "electric utility" has the meaning given in s. 196.485 (1) (bs).
AB437-AA1,2,3
17. Page 2, line 11: delete "public utility, the public utility" and substitute
2"electric utility within 90 days after issuance of the certificate of public convenience
3and necessity, the electric utility".