AB734-ASA2,2,62
30.12
(3) (a) 2m. Place riprap on the bed or bank of a navigable water adjacent
3an owner's property if the property is subject to significant erosion by the navigable
4water, the erosion is verified by a registered professional engineer, and the riprap is
5designed by and installed under the supervision of a registered professional
6engineer.