LRBa0085/2
RCT/RNK/MGG:all:rs
2013 - 2014 LEGISLATURE
SENATE AMENDMENT 10,
TO SENATE BILL 1
February 5, 2013 - Offered by Senator Tiffany.
SB1-SA10,1,11 At the locations indicated, amend the bill as follows:
SB1-SA10,1,3 21. Page 30, line 1: delete the material beginning with that line and ending with
3page 32, line 20.
SB1-SA10,1,4 42. Page 37, line 18: after that line insert:
SB1-SA10,1,5 5" Section 41m. 77.105 of the statutes is created to read:
SB1-SA10,1,8 677.105 Ferrous mining. (1) The department may not issue an order of
7withdrawal under s. 77.10 (1) based on the cutting of timber or other forest crops or
8other activities on forest cropland if all of the following requirements are met:
SB1-SA10,1,109 (a) The cutting or activity is necessary to engage in bulk sampling, as defined
10in s. 295.41 (7).
SB1-SA10,1,1211 (b) The area that will be affected by the cutting or the activity does not exceed
125 acres.
SB1-SA10,2,3
1(c) A bulk sampling plan has been filed with the department under s. 295.45
2and all approvals that are required for bulk sampling have been issued by the
3department.
SB1-SA10,2,74 (d) The revegetation plan that is part of the bulk sampling plan described under
5par. (c) includes forestry practices that will ensure that the timber, forest crops, and
6other vegetation that will be cut or otherwise affected will be restored to the greatest
7extent possible.
SB1-SA10,2,10 8(2) The requirement under sub. (1) (d) does not apply to forest cropland that
9is within a mining site described in a preapplication notification under s. 295.465 or
10in an application for a ferrous mining permit under s. 295.58.
SB1-SA10,41q 11Section 41q. 77.883 of the statutes is created to read:
SB1-SA10,2,14 1277.883 Ferrous mining. (1) The department may not issue an order of
13withdrawal under s. 77.88 (1) based on the cutting of timber or other activities on
14managed forest land if all of the following requirements are met:
SB1-SA10,2,1615 (a) The cutting or activity is necessary to engage in bulk sampling, as defined
16in s. 295.41 (7).
SB1-SA10,2,1817 (b) The area that will be affected by the cutting or the activity does not exceed
185 acres.
SB1-SA10,2,2119 (c) A bulk sampling plan has been filed with the department under s. 295.45
20and all approvals that are required for bulk sampling have been issued by the
21department.
SB1-SA10,2,2522 (d) The revegetation plan that is part of the bulk sampling plan described under
23par. (c) includes forestry practices that will ensure that the merchantable timber and
24other vegetation that will be cut or otherwise affected will be restored to the greatest
25extent possible.
SB1-SA10,3,3
1(2) The requirement under sub. (1) (d) does not apply to managed forest land
2that is within a mining site described in a preapplication notification under s.
3295.465 or in an application for a mining permit under s. 295.58.
SB1-SA10,3,6 4(3) Section 77.86 (1) (c) and (d) do not apply to cutting of timber or another
5activity on managed forest land if all of the requirements in sub. (1) (a) to (d) are
6met.".
SB1-SA10,3,8 73. Page 47, line 4: delete ", or leased by the generator" and substitute "or leased
8by the generator or on which the generator holds an easement".
SB1-SA10,3,10 94. Page 56, line 9: delete ""Approval" means" and substitute "(a) "Approval"
10means, except as provided in par. (b),".
SB1-SA10,3,11 115. Page 56, line 14: delete "(a)" and substitute "1.".
SB1-SA10,3,12 126. Page 56, line 17: delete "(b)" and substitute "2.".
SB1-SA10,3,13 137. Page 56, line 18: delete "(c)" and substitute "3.".
SB1-SA10,3,14 148. Page 56, line 20: after that line insert:
SB1-SA10,3,18 15"(b) "Approval" does not include a permit, license, certification, contract, or
16other authorization related to the construction of any new plant, equipment,
17property, or facility for the production, transmission, delivery, or furnishing of
18power.".
SB1-SA10,3,19 199. Page 119, line 1: delete "no less than 20".
SB1-SA10,3,20 2010. Page 119, line 2: delete "percent and".
SB1-SA10,3,21 2111. Page 123, line 16: after that line insert:
SB1-SA10,3,22 22"7. Archaeological sites.".
SB1-SA10,4,3
112. Page 131, line 25: after "approval." insert "The department shall publish
2the notice on its Internet site not more than 10 days after the application is
3considered to be complete under sub. (8) (b) 1.".
SB1-SA10,4,6 413. Page 133, line 20: after "sub. (2)" insert "or more than 60 days after that
5day but in time to allow the application to be considered at the public informational
6hearing for the mining permit under sub. (5)".
SB1-SA10,4,8 714. Page 133, line 23: delete the material beginning with that line and ending
8with page 134, line 4, and substitute:
SB1-SA10,4,20 9"(b) 1. If an applicant files an application for an approval other than a mining
10permit too late to allow the application to be considered at the public informational
11hearing for the mining permit under sub. (5) but before the department issues the
12decision to grant or deny the application for the mining permit, the application for
13the approval is considered to be complete on the 30th day after the department
14receives the application, unless, before that day, the department provides the
15applicant with written notification that the application is not complete, stating the
16reason for the determination and describing the specific information necessary to
17make the application complete. If the department provides such a notice, the
18applicant shall supplement the application by providing the specified information.
19The application is considered to be complete when the applicant provides the
20information.
SB1-SA10,5,221 2. Except as provided in subd. 3., the department shall approve the application
22for an approval described in subd. 1., and issue the approval, or deny the application
23after the separate public informational hearing for the approval required under sub.

1(5) and no later than 75 days after the application for the approval is considered to
2be complete under subd. 1.
SB1-SA10,5,83 3. Except as provided in par. (c), the department shall approve or deny the
4application for an approval described in subd. 1. that is an individual permit for
5which federal law requires the opportunity for public comment or the ability to
6request a public hearing prior to issuance of the approval after the separate public
7informational hearing required for the approval under sub. (5) and no later than 180
8days after the application is considered to be complete under subd. 1.".
SB1-SA10,5,9 915. Page 134, line 18: after "procedure." insert "(a)".
SB1-SA10,5,12 1016. Page 134, line 21: after "any approval" insert "for which the application
11is filed before the department issues the decision to grant or deny the application for
12the mining permit".
SB1-SA10,5,13 1317. Page 135, line 2: after that line insert:
SB1-SA10,5,19 14"(b) The provisions of ss. 295.58 (5) and (6) and 295.77 concerning review of
15department decisions and the duration of department decisions apply to any
16approval for which the application is filed after the department issues the mining
17permit, notwithstanding any provisions related to those matters in s. 44.40 or
18169.25, subch. I or VI of ch. 77, ch. 23, 29, 30, 31, 169, 281, 283, 285, 289, or 291, or
19rules promulgated under those provisions, except as provided in s. 281.343 (7r).".
SB1-SA10,5,20 2018. Page 135, line 13: delete "regulations that".
SB1-SA10,5,24 2119. Page 135, line 14: delete lines 14 to 16 and substitute "requirements of any
22municipal floodplain zoning ordinance applicable to the proposed mining under s.
23295.607 (3) to the extent that the ordinance has not been made inapplicable to the
24proposed mining by a local agreement under s. 295.443 (1m).".
SB1-SA10,6,1
120. Page 143, line 17: after that line insert:
SB1-SA10,6,5 2"(1m) Applicability. Subsections (2) to (11) do not apply to a wetland individual
3permit or other approval that requires a wetland impact evaluation if the operator
4files the application for the wetland individual permit or other approval after the
5department issues the mining permit for the mining operation.".
SB1-SA10,6,7 621. Page 144, line 19: after "general permit" insert "for a mining activity other
7than bulk sampling".
SB1-SA10,6,9 822. Page 150, line 6: after "wetland" insert "or for any other approval for which
9a wetland impact evaluation for a federal wetland is required".
SB1-SA10,6,10 1023. Page 150, line 15: after "permit" insert "or other approval".