ASSEMBLY AMENDMENT 1,
TO ASSEMBLY BILL 142
April 20, 2017 - Offered by Representative Ripp.
AB142-AA1,1,11 At the locations indicated, amend the bill as follows:
AB142-AA1,1,2 21. Page 4, line 5: delete lines 5 to 8 and substitute:
AB142-AA1,1,3 3 Section 2g. 13.489 (5) (a) (intro.) of the statutes is amended to read:
AB142-AA1,1,84 13.489 (5) (a) (intro.) By February 1, 2005, and every 6 months thereafter, the
5department of transportation shall submit to the commission and, under s. 13.172
6(2) to the joint committee on finance, the joint legislative audit committee, and the
7standing committees of the legislature with jurisdiction over transportation matters
8a report to the commission that does all of the following:
AB142-AA1,2m 9Section 2m. 13.489 (5) (a) 2. of the statutes is renumbered 13.489 (5) (a) 2.
10(intro.) and amended to read:
AB142-AA1,1,1211 13.489 (5) (a) 2. (intro.) For each project specified under subd. 1., identifies all
12provides all of the following information:
AB142-AA1,2,4
1a. All actual and estimated project costs, itemized by major cost categories, as
2of the date of preparation of the report. To the extent feasible, the department shall
3separately track and report the costs of environmental assessments, compliance, and
4mitigation.
AB142-AA1,2s 5Section 2s. 13.489 (5) (a) 2. b. to i. of the statutes are created to read:
AB142-AA1,2,86 13.489 (5) (a) 2. b. The full project cost estimate, as established under sub. (3)
7(b) 2., of the project as of the date of approval or, if the project is enumerated,
8enumeration.
AB142-AA1,2,109 c. The year in which the department expects to complete the project as of the
10date of approval or, if the project is enumerated, enumeration.
AB142-AA1,2,1211 d. The full project cost estimate, as established under sub. (3) (b) 2., of the
12project as of the date of preparation of the report.
AB142-AA1,2,1413 e. The year in which the department expects to complete the project as of the
14date of preparation of the report.
AB142-AA1,2,1715 f. An explanation of any difference between the full project cost estimates under
16subd. 2. b. and d. that has not been addressed in a previous report under this
17paragraph.
AB142-AA1,2,1918 g. The opinion of the department as to whether the project will be completed
19as originally scheduled without the allocation of additional funds.”.
AB142-AA1,2,21 202. Page 5, line 3: delete the material beginning with that line and ending with
21page 6, line 3.