Relating to: requiring the conveyance of property to electric utilities and cooperatives for the construction of electric transmission lines. relating to: requiring the conveyance of property to electric utilities and cooperatives for the construction of electric transmission lines.
Date / House | Action | Journal |
---|---|---|
6/8/2005 Sen. | Introduced by Senators Plale, Schultz, Wirch, Kanavas, Breske, Leibham, Kapanke, Lazich and Roessler; cosponsored by Representatives Montgomery, Huebsch, Zepnick, Gard, Honadel, Jensen, Ott, J. Fitzgerald, Hines, Bies, Hahn, Van Roy, Nischke, Ainsworth, Davis and Musser. | |
6/8/2005 Sen. | Read first time and referred to committee on Energy, Utilities and Information Technology | |
6/14/2005 Sen. | Public hearing held. | |
6/15/2005 Sen. | Senate amendment 1 offered by Senator Plale | |
6/17/2005 Sen. | Executive action taken. | |
6/17/2005 Sen. | Report adoption of Senate Amendment 1 recommended by committee on Energy, Utilities and Information Technology, Ayes 5, Noes 0 | |
6/17/2005 Sen. | Report passage as amended recommended by committee on Energy, Utilities and Information Technology, Ayes 5, Noes 0 | |
6/17/2005 Sen. | Available for scheduling. | |
6/22/2005 Sen. | Placed on calendar 6-23-2005 by committee on Senate Organization. | |
6/23/2005 Sen. | Read a second time | |
6/23/2005 Sen. | Senator Zien added as a coauthor | |
6/23/2005 Sen. | Laid on the table | |
5/11/2006 Sen. | Failed to pass pursuant to Senate Joint Resolution 1 |