Nowak, Commissioner Ellen: public service honored and well wishes for future endeavors - SJR24
PFAS group of substances: requirements created and programs established to address issues related to; reports and studies [S.Sub.Amdt.2: further revisions, rule revisions added [Admin.Code NR 811.12, PSC 184.06]; S.Amdt.1: further revisions] - SB312
PSC to require retail electric utilities and cooperatives to survey customers about broadband service availability and Internet service providers to disclose certain information to improve broadband mapping - AB1175
PSC to require retail electric utilities and cooperatives to survey customers about broadband service availability and Internet service providers to disclose certain information to improve broadband mapping - SB1085
PSC website and annual report relating to dockets requirements - AB675
PSC website and annual report relating to dockets requirements - SB647
Public utility prohibited from disconnecting a service providing the primary heat source for residential dwellings between set dates and under certain conditions - AB670
Public utility rate changes: customer notification requirements; PSC provisions - AB676
Public utility rate changes: customer notification requirements; PSC provisions - SB646
Public utility recovery of cost of low-income assistance programs [Sec. 2412] - AB43
Public utility recovery of cost of low-income assistance programs [Sec. 2412] [original bill only] - SB70
Rate recovery by a public utility of assessments related to a PSC proceeding: amount reduced - AB683
Rate recovery by a public utility of assessments related to a PSC proceeding: amount reduced - SB649
Residential and commercial energy improvements: PSC to allow public utility to finance; surcharge provision [Sec. 2418] - AB43
Residential and commercial energy improvements: PSC to allow public utility to finance; surcharge provision [Sec. 2418] [original bill only] - SB70
Residential energy improvement program established - AB832
Residential energy improvement program established - SB784
Retiring certain electric generating facilities: eligibility for environmental trust bond financing [Sec. 2407, 2408] - AB43
Retiring certain electric generating facilities: eligibility for environmental trust bond financing [Sec. 2407, 2408] [original bill only] - SB70
Social cost of carbon emissions considered by PSC when issuing certificates for certain electric and public utility projects - AB811
Social cost of carbon emissions considered by PSC when issuing certificates for certain electric and public utility projects - SB760
Social cost of carbon: PSC to consider when issuing certificates for certain public utility projects; annual adjustments and report required [Sec. 2406, 9336 (2)] - AB43
Social cost of carbon: PSC to consider when issuing certificates for certain public utility projects; annual adjustments and report required [Sec. 2406, 9336 (2)] [original bill only] - SB70
Solar or wind project on prime farmland: PSC conditions for granting certificate of public convenience and necessity (CPCN) or certificate of authority (CA) - AB738
Wind energy system: political subdivision may impose restriction more restrictive than PSC rules - AB165
Wind energy system: political subdivision may impose restriction more restrictive than PSC rules - SB151
Wind or solar projects: local approval required before the PSC may approve - AB1169
Wind or solar projects: local approval required before the PSC may approve - SB1075
Amending certain PSC rate orders, certificates of public convenience and necessity (CPCN), and certificates of authority (CA) authorized - AB681
Amending certain PSC rate orders, certificates of public convenience and necessity (CPCN), and certificates of authority (CA) authorized - SB650
Electric vehicle charging stations: person supplying electricity exempt from public utility regulation; prohibitions on local governments and state agencies from owning, operating, managing, or leasing; excise tax on electric vehicle charging, residence exception; JRCCP may report - AB846
Electric vehicle charging stations: person supplying electricity exempt from public utility regulation; prohibitions on local governments and state agencies from owning, operating, managing, or leasing; excise tax on electric vehicle charging, residence exception; JRCCP may report [S.Amdt.1: ownership or operation by state agency provision modified, station permit changed to registration; S.Amdt.2: further revisions, charging tax modified; A.Amdt.1: local government cannot require private developer to install] - SB791
Electric vehicle infrastructure program established by DOT; nonutility-owned electric vehicle charging stations exempt from regulation as a public utility [Sec. 392-394, 1697, 2405] - AB43
Electric vehicle infrastructure program established by DOT; nonutility-owned electric vehicle charging stations exempt from regulation as a public utility [Sec. 392-394, 1697, 2405] [original bill only] - SB70
Energy storage facility: public utility aid payments to counties and municipalities [Sec. 1649, 1659, 9337 (9)] - AB43
Energy storage facility: public utility aid payments to counties and municipalities [Sec. 1649, 1659, 9337 (9)] [original bill only] - SB70
Gas pipeline safety violations: maximum penalties increased [Sec. 2439] - AB43
Gas pipeline safety violations: maximum penalties increased - AB878
Gas pipeline safety violations: maximum penalties increased [Sec. 2439] [original bill only] - SB70
Gas pipeline safety violations: maximum penalties increased - SB812
Light-mitigating technology systems (LMTS): installation on certain wind energy systems and high-voltage transmission line towers - AB1165
Municipal storm water utilities: PSC to regulate rates and services - AB457
Municipal storm water utilities: PSC to regulate rates and services - SB455
Public utility incentive aids paid to municipalities and counties [S.Sub.Amdt.2: Sec. 357, 358] - SB70
Public utility prohibited from disconnecting a service providing the primary heat source for residential dwellings between set dates and under certain conditions - AB670
Public utility rate changes: customer notification requirements; PSC provisions - AB676
Public utility rate changes: customer notification requirements; PSC provisions - SB646
Public utility recovery of cost of low-income assistance programs [Sec. 2412] - AB43
Public utility recovery of cost of low-income assistance programs [Sec. 2412] [original bill only] - SB70
Qualified electric vehicle charging infrastructure: public utility aid payments to counties and municipalities [Sec. 1650, 1660, 9337 (10)] - AB43
Qualified electric vehicle charging infrastructure: public utility aid payments to counties and municipalities [Sec. 1650, 1660, 9337 (10)] [original bill only] - SB70
Rate recovery by a public utility of assessments related to a PSC proceeding: amount reduced - AB683
Rate recovery by a public utility of assessments related to a PSC proceeding: amount reduced - SB649
Regulation of utility services based on type or source of energy: political subdivision prohibition created - AB45
Regulation of utility services based on type or source of energy: political subdivision prohibition created [S.Amdt.1: further revisions, state agencies and electric cooperative provisions added] - SB49
Residential and commercial energy improvements: PSC to allow public utility to finance; surcharge provision [Sec. 2418] - AB43
Residential and commercial energy improvements: PSC to allow public utility to finance; surcharge provision [Sec. 2418] [original bill only] - SB70
Residential energy improvement program established - AB832
Residential energy improvement program established - SB784
Social cost of carbon emissions considered by PSC when issuing certificates for certain electric and public utility projects - AB811
Social cost of carbon emissions considered by PSC when issuing certificates for certain electric and public utility projects - SB760
Social cost of carbon: PSC to consider when issuing certificates for certain public utility projects; annual adjustments and report required [Sec. 2406, 9336 (2)] - AB43
Social cost of carbon: PSC to consider when issuing certificates for certain public utility projects; annual adjustments and report required [Sec. 2406, 9336 (2)] [original bill only] - SB70
Warning lights on public utility, telecommunications carrier, or cooperative vehicles modified - AB354
Warning lights on public utility, telecommunications carrier, or cooperative vehicles modified - SB355
public utility _ taxationPublic utility — Taxation
Public utility companies: DOR requirement to send tax assessments via certified mail eliminated [Sec. 1552, 1557-1560] - AB43
Public utility companies: DOR requirement to send tax assessments via certified mail eliminated [Sec. 1552, 1557-1560] [original bill only] - SB70
public welfarePublic welfare
Advisory referendum on the question of requiring able-bodied, childless adults to look for work in order to receive taxpayer-funded welfare benefits - AJR3
Advisory referendum on the question of requiring able-bodied, childless adults to look for work in order to receive taxpayer-funded welfare benefits - SJR4
Conversion therapy involving a minor: mental health providers prohibited from engaging in; specified examining boards required to investigate and discipline if violations are found - AB1161
Conversion therapy involving a minor: mental health providers prohibited from engaging in; specified examining boards required to investigate and discipline if violations are found - SB1065
Guaranteed income program: political subdivisions may not expend moneys on - AB146
Guaranteed income program: political subdivisions may not expend moneys on - SB236
public worksPublic works
Competitive bidding: threshold for public works projects increased and school boards and MPS required to use; exceptions provided - AB723
Competitive bidding: threshold for public works projects increased and school boards and MPS required to use; exceptions provided [S.Amdt.1: metropolitan sewerage district provision added; S.Amdt.2: further revisions, highways specified] - SB688
Empty conduit lines: person conducting special work requiring digging in a right-of-way required to install; duty to offer service imposed on Internet service provider - AB1178
Empty conduit lines: person conducting special work requiring digging in a right-of-way required to install; duty to offer service imposed on Internet service provider - SB1083
Materials manufactured in the United States: preference for in state and local government public contracts and purchases; conditions specified - AB1145
Materials manufactured in the United States: preference for in state and local government public contracts and purchases; conditions specified - SB1069
Nonmetallic quarry hours of operation: political subdivision prohibited from limiting, public works provision [Sec. 1190] - AB43
Nonmetallic quarry hours of operation: political subdivision prohibited from limiting, public works provision [Sec. 1190] [original bill only] - SB70
Prevailing wage rate for certain public works projects, DWD duties; competitive bidding requirement for local transportation project funded with certain state funds; JRCCP may report [Sec. 252, 1175, 1221-1227, 1684, 1685, 1709, 1780, 1831-1837, 1839, 1875, 1911, 1933, 2451, 2479, 2513, 3307, 3386, 9350 (3)] - AB43
Prevailing wage rate for certain public works projects, DWD duties; competitive bidding requirement for local transportation project funded with certain state funds; JRCCP may report - AB509
Prevailing wage rate for certain public works projects, DWD duties; competitive bidding requirement for local transportation project funded with certain state funds; JRCCP may report [Sec. 252, 1175, 1221-1227, 1684, 1685, 1709, 1780, 1831-1837, 1839, 1875, 1911, 1933, 2451, 2479, 2513, 3307, 3386, 9350 (3)] [original bill only] - SB70
Loading...
Loading...