196.378(3)(c) (c) A renewable resource credit created under s. 196.378 (3) (a), 2003 stats., may not be used after December 31, 2011. A renewable resource credit created under par. (a) 1., 1m., or 2. may not be used after the 4th year after the year in which the credit is created, except the commission may promulgate rules specifying a different period of time if the commission determines that such period is necessary for consistency with any regional renewable resource credit trading program that applies in this state.
196.378(4) (4)Renewable resource rules. The commission may promulgate rules that designate a resource, except for a conventional resource, as a renewable resource in addition to the resources specified in sub. (1) (h) 1. and 1m.
196.378(4g) (4g)Wind energy systems.
196.378(4g)(a)(a) In this subsection:
196.378(4g)(a)1. 1. “Application for approval" has the meaning given in s. 66.0401 (1e) (a).
196.378(4g)(a)2. 2. “Decommissioning" means removing wind turbines, buildings, cables, electrical components, roads, and any other facilities associated with a wind energy system that are located at the site of the wind energy system and restoring the site of the wind energy system.
196.378(4g)(a)3. 3. “Political subdivision" means a city, village, town, or county.
196.378(4g)(a)4. 4. “Wind energy system" has the meaning given in s. 66.0403 (1) (m).
196.378(4g)(b) (b) The commission shall, with the advice of the wind siting council, promulgate rules that specify the restrictions a political subdivision may impose on the installation or use of a wind energy system consistent with the conditions specified in s. 66.0401 (1m) (a) to (c). The subject matter of these rules shall include setback requirements that provide reasonable protection from any health effects, including health effects from noise and shadow flicker, associated with wind energy systems. The subject matter of these rules shall also include decommissioning and may include visual appearance, lighting, electrical connections to the power grid, setback distances, maximum audible sound levels, shadow flicker, proper means of measuring noise, interference with radio, telephone, or television signals, or other matters. A political subdivision may not place a restriction on the installation or use of a wind energy system that is more restrictive than these rules.
196.378(4g)(c) (c) In addition to the rules under par. (b), the commission shall, with the advice of the wind siting council, promulgate rules that do all of the following:
196.378(4g)(c)1. 1. Specify the information and documentation to be provided in an application for approval to demonstrate that a proposed wind energy system complies with rules promulgated under par. (b).
196.378(4g)(c)2. 2. Specify the information and documentation to be included in a political subdivision's record of decision under s. 66.0401 (4) (b).
196.378(4g)(c)3. 3. Specify the procedure a political subdivision shall follow in reviewing an application for approval under s. 66.0401 (4).
196.378(4g)(c)4. 4. Specify the requirements and procedures for a political subdivision to enforce the restrictions allowed under par. (b).
196.378(4g)(d) (d) The commission shall promulgate rules requiring the owner of a wind energy system with a nominal operating capacity of at least one megawatt to maintain proof of financial responsibility ensuring the availability of funds for decommissioning the wind energy system upon discontinuance of use of the wind energy system. The rules may require that the proof can be established by a bond, deposit, escrow account, irrevocable letter of credit, or other financial commitment specified by the commission.
196.378(4g)(e) (e) The wind siting council shall survey the peer-reviewed scientific research regarding the health impacts of wind energy systems and study state and national regulatory developments regarding the siting of wind energy systems. No later than October 1, 2014, and every 5 years thereafter, the wind siting council shall submit a report to the chief clerk of each house of the legislature, for distribution to the appropriate standing committees under s. 13.172 (3), describing the research and regulatory developments and including any recommendations of the council for legislation that is based on the research and regulatory developments.
196.378(4m) (4m)Additional renewable resources requirements.
196.378(4m)(a)(a) The commission may not impose on an electric provider any requirement that increases the electric provider's renewable energy percentage beyond that required under sub. (2) (a) 2. If an electric provider is in compliance with the requirements of sub. (2) (a) 2., the commission may not require the electric provider to undertake, administer, or fund any other renewable energy program. This paragraph does not limit the authority of the commission to enforce an electric provider's obligations under s. 196.374.
196.378(4m)(b) (b) An electric utility may, with commission approval, administer or fund a program that increases the electric utility's renewable energy percentage beyond that required under sub. (2) (a) 2. The commission may not order an electric utility to administer or fund a program under this paragraph.
196.378(4r) (4r)Reports. No later than July 1 of each even-numbered year, the commission shall submit a report to the governor and chief clerk of each house of the legislature for distribution to the legislature under s. 13.172 (2) that evaluates the impact of the requirements of this section on the rates and revenue requirements of electric providers and compares that impact with the impact that would have occurred if renewable energy practices of electric providers were subject to market forces in the absence of the requirements of this section.
196.378(5) (5)Penalty. Any person who violates sub. (2) or any renewable energy supplier who provides an electric provider with a false or misleading certification regarding the sources or amounts of renewable energy supplied at wholesale to the electric provider shall forfeit not less than $5,000 nor more than $500,000. Forfeitures under this subsection shall be enforced by action on behalf of the state by the attorney general. A court imposing a forfeiture under this subsection shall consider all of the following in determining the amount of the forfeiture:
196.378(5)(a) (a) The appropriateness of the forfeiture to the person's or wholesale supplier's volume of business.
196.378(5)(b) (b) The gravity of the violation.
196.378(5)(c) (c) Whether a violation of sub. (2) is due to circumstances beyond the violator's control.
196.378 History History: 1999 a. 9; 2001 a. 30; 2005 a. 141; 2009 a. 40, 406; 2011 a. 34, 155; 2013 a. 290, 300.
196.378 Cross-reference Cross-reference: See also chs. PSC 118 and 128, Wis. adm. code.
196.378 Annotation Rules promulgated under sub. (4g) (b), which directs the Public Service Commission to promulgate wind energy rules, do not require a housing impact report under s. 227.115. Wisconsin Realtors Association v. Public Service Commission of Wisconsin, 2015 WI 63, 363 Wis. 2d 430, 867 N.W.2d 364, 13-1407.
196.39 196.39 Change, amendment and rescission of orders; reopening cases.
196.39(1)(1) The commission at any time, upon notice to the public utility and after opportunity to be heard, may rescind, alter or amend any order fixing rates, tolls, charges or schedules, or any other order made by the commission, and may reopen any case following the issuance of an order in the case, for any reason.