SB216,163Section 16. 60.47 (5) (c) of the statutes is created to read:
SB216,7,6460.47 (5) (c) This section does not apply to the construction by a private
5person of an improvement that is donated to the town after the completion of
6construction.
SB216,177Section 17. 62.15 (1) of the statutes is renumbered 62.15 (1) (a) and
8amended to read:
SB216,7,20962.15 (1) (a) All public construction, the estimated cost of which exceeds
10$25,000 the bidding threshold under par. (c) 1. a., shall be let by contract to the
11lowest responsible bidder; all other public construction shall be let as the council
12may direct. If the estimated cost of any public construction exceeds $5,000 the
13notice threshold under par. (c) 1. b. but is not greater than $25,000 the bidding
14threshold under par. (c) 1. a., the board of public works shall give a class 1 notice,
15under ch. 985, of the proposed construction before the contract for the construction
16is executed. This provision paragraph does not apply to public construction if the
17materials for such a the project are donated or if the labor for such a the project is
18provided by volunteers. The council may also by a vote of three-fourths of all the
19members-elect provide by ordinance that any class of public construction or any
20part thereof may be done directly by the city without submitting the same for bids.
SB216,1821Section 18. 62.15 (1) (b) of the statutes is created to read:
SB216,7,222262.15 (1) (b) 1. In this paragraph:
SB216,8,2
1a. Highway means a public way or thoroughfare, including any bridges on
2the public way or thoroughfare.
SB216,8,43b. Public highway construction means a public construction project
4involving the construction, improvement, repair, or maintenance of a highway.
SB216,8,1752. Notwithstanding par. (a), all public highway construction, the estimated
6cost of which exceeds the bidding threshold under par. (c) 1. c., shall be let by
7contract to the lowest responsible bidder; all other public highway construction
8shall be let as the council may direct. Notwithstanding par. (a), if the estimated cost
9of any public highway construction exceeds the notice threshold under par. (c) 1. d.
10but is not greater than the bidding threshold under par. (c) 1. c., the board of public
11works shall give a class 1 notice, under ch. 985, of the proposed construction before
12the contract for the construction is executed. This subdivision does not apply to
13public highway construction if the materials for the project are donated or if the
14labor for the project is provided by volunteers. The council may also by a vote of
15three-fourths of all the members-elect provide by ordinance that any class of public
16highway construction or any part thereof may be done directly by the city without
17submitting the same for bids.
SB216,1918Section 19. 62.15 (1) (c) of the statutes is created to read:
SB216,8,201962.15 (1) (c) 1. Beginning on the effective date of this subdivision .... [LRB
20inserts date}, the thresholds under pars. (a) and (b) are the following:
SB216,8,2121a. For general public construction contract bidding, $50,000.
SB216,8,2222b. For general public construction contract notice, $10,000.
SB216,8,2323c. For public highway construction contract bidding, $25,000.
SB216,8,2424d. For public highway construction contract notice, $5,000.
SB216,9,5
12. On the 5th year commencing after the effective date of this subdivision ....
2[LRB inserts date], and each subsequent 5th year, the thresholds under subd. 1.
3shall be increased by a percentage equal to the percentage change in the U.S.
4consumer price index for the previous 5 years, as determined by the federal
5department of labor, rounded to the nearest multiple of $1,000.
SB216,206Section 20. Initial applicability.
SB216,9,87(1) This act first applies to bids solicited on the effective date of this
8subsection.