Chapter PSC 116
FUEL COST
PSC 116.01   Definitions.
PSC 116.02   Fuel cost.
PSC 116.03   Fuel cost plan.
PSC 116.04   Deferral accounting.
PSC 116.05   Reporting.
PSC 116.06   Deferred account balance calculation.
PSC 116.07   Reconciliation.
PSC 116.08   Mid-year rate adjustment.
Ch. PSC 116 NoteNote: Chapter PSC 116 as it existed on February 28, 2011 was repealed and a new Chapter PSC 116 was created effective March 1, 2011.
PSC 116.01PSC 116.01Definitions. In this chapter:
PSC 116.01(1)(1)“Annual fuel cost” means actual fuel cost over a plan year.
PSC 116.01(2)(2)“Annual native system requirement” means the native system requirement in megawatthours over a plan year.
PSC 116.01(3)(3)“Associated transmission service” means the cost of transmission service incurred outside a utility’s transmission organization, but not any cost associated with a purchased power contract the utility uses to meet its planning reserve requirement.
PSC 116.01(4)(4)“Average annual fuel cost” means the annual fuel cost divided by the annual native system requirement.
PSC 116.01(5)(5)“Capacity” means the continuous load–carrying ability of electric generation expressed in megawatts.
PSC 116.01(6)(6)“Commission” means the public service commission.