Focus on Energy rate change [Sec. 2332] -
SB45Incumbent transmission facility owner’s right to construct, own, and maintain a transmission facility approved in the Midwest Independent System Operator’s (MISO) transmission plan; regionally cost-shared transmission line, report, PSC, and sunset provisions -
AB25Incumbent transmission facility owner’s right to construct, own, and maintain a transmission facility approved in the Midwest Independent System Operator’s (MISO) transmission plan; regionally cost-shared transmission line, report, PSC, and sunset provisions -
SB28Lead service line replacement grants: size limit removed [Sec. 2328, 2329] -
AB50Lead service line replacement grants: size limit removed [Sec. 2328, 2329] -
SB45Nuclear power plant feasibility study [Sec. 165, 2325] -
AB50Nuclear power plant feasibility study [Sec. 165, 2325] -
SB45Nuclear power siting study by PSC, report required; CPCN application for large electric generating facility containing an advanced nuclear reactor provision -
AB108Nuclear power siting study by PSC, report required; CPCN application for large electric generating facility containing an advanced nuclear reactor provision -
SB125PFAS: requirements created and grant programs established to address issues related to; study and reports required; rules revised [Admin.Code NR 811.12; PSC 184.06] -
AB131PFAS: requirements created and grant programs established to address issues related to; study and reports required; rules revised [Admin.Code NR 811.12; PSC 184.06] -
SB128Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] -
AB50Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] -
SB45Retiring certain electric generating facilities: eligibility for environmental trust bond financing [Sec. 2326, 2327] -
AB50Retiring certain electric generating facilities: eligibility for environmental trust bond financing [Sec. 2326, 2327] -
SB45Transmission facility contracts, audit process, and certain rights for incumbent owners; construction of large wind energy systems, large solar energy systems, and battery energy storage systems requirements; nuclear energy made a state priority; light-mitigating technology systems installed on certain wind energy systems and transmission line towers -
AB174Wind or solar projects: local approval required before the PSC may approve -
AB7Wind or solar projects: local approval required before the PSC may approve -
SB3Brownfield renewable energy generation grants created [Sec. 164, 2341] -
AB50Brownfield renewable energy generation grants created [Sec. 164, 2341] -
SB45Energy storage facilities and liquified natural gas storage facilities: public utility aid payments to counties and municipalities [Sec. 1505, 1506, 1511, 9337 (5)] -
AB50Energy storage facilities and liquified natural gas storage facilities: public utility aid payments to counties and municipalities [Sec. 1505, 1506, 1511, 9337 (5)] -
SB45Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] -
AB50Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] -
SB45Public utility companies: requirement to send ad valorem tax assessments via certified mail eliminated [Sec. 1441-1445] -
AB50Public utility companies: requirement to send ad valorem tax assessments via certified mail eliminated [Sec. 1441-1445] -
SB45