Focus on Energy rate change [Sec. 2332] - SB45
Incumbent transmission facility owner’s right to construct, own, and maintain a transmission facility approved in the Midwest Independent System Operator’s (MISO) transmission plan; regionally cost-shared transmission line, report, PSC, and sunset provisions - AB25
Incumbent transmission facility owner’s right to construct, own, and maintain a transmission facility approved in the Midwest Independent System Operator’s (MISO) transmission plan; regionally cost-shared transmission line, report, PSC, and sunset provisions - SB28
Lead service line replacement grants: size limit removed [Sec. 2328, 2329] - AB50
Lead service line replacement grants: size limit removed [Sec. 2328, 2329] - SB45
Nuclear power plant feasibility study [Sec. 165, 2325] - AB50
Nuclear power plant feasibility study [Sec. 165, 2325] - SB45
Nuclear power siting study by PSC, report required; CPCN application for large electric generating facility containing an advanced nuclear reactor provision - AB108
Nuclear power siting study by PSC, report required; CPCN application for large electric generating facility containing an advanced nuclear reactor provision - SB125
PFAS: requirements created and grant programs established to address issues related to; study and reports required; rules revised [Admin.Code NR 811.12; PSC 184.06] - AB131
PFAS: requirements created and grant programs established to address issues related to; study and reports required; rules revised [Admin.Code NR 811.12; PSC 184.06] - SB128
Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] - AB50
Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] - SB45
Retiring certain electric generating facilities: eligibility for environmental trust bond financing [Sec. 2326, 2327] - AB50
Retiring certain electric generating facilities: eligibility for environmental trust bond financing [Sec. 2326, 2327] - SB45
Transmission facility contracts, audit process, and certain rights for incumbent owners; construction of large wind energy systems, large solar energy systems, and battery energy storage systems requirements; nuclear energy made a state priority; light-mitigating technology systems installed on certain wind energy systems and transmission line towers - AB174
Wind or solar projects: local approval required before the PSC may approve - AB7
Wind or solar projects: local approval required before the PSC may approve - SB3
public utilityPublic utility
Brownfield renewable energy generation grants created [Sec. 164, 2341] - AB50
Brownfield renewable energy generation grants created [Sec. 164, 2341] - SB45
Energy storage facilities and liquified natural gas storage facilities: public utility aid payments to counties and municipalities [Sec. 1505, 1506, 1511, 9337 (5)] - AB50
Energy storage facilities and liquified natural gas storage facilities: public utility aid payments to counties and municipalities [Sec. 1505, 1506, 1511, 9337 (5)] - SB45
Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] - AB50
Residential and commercial energy improvements: public utility may recover costs through a surcharge [Sec. 2333] - SB45
public utility _ taxationPublic utility — Taxation
Public utility companies: requirement to send ad valorem tax assessments via certified mail eliminated [Sec. 1441-1445] - AB50
Public utility companies: requirement to send ad valorem tax assessments via certified mail eliminated [Sec. 1441-1445] - SB45
public welfarePublic welfare