NR 208.05(3)(a)(a) Influent flow and loading. Point assignments for exceedances of percentages of maximum month design flow and 5-day biochemical oxygen demand (BOD) loadings in the previous calendar year shall be determined as follows: NR 208.05 Note1 “Maximum month design flow” means the largest volume of flow anticipated to occur during a continuous 30-day period, expressed as a daily average, for which the treatment works is designed to receive and provide treatment.
NR 208.05(3)(b)1.1. Point assignments for WPDES permit limit exceedances and for percentages of effluent 5-day biochemical oxygen demand (BOD) or 5-day carbonaceous biochemical oxygen demand (CBOD) limits in the previous calendar year shall be as follows: NR 208.05(3)(b)2.2. For systems that discharge intermittently to waters of the state, the points per monthly exceedance for this CMAR section shall be based upon a multiplication factor of 12 months divided by the number of months of discharge. NR 208.05 NoteExample: For a wastewater facility discharging only 6 months of the year, the multiplication factor is 12 /6 = 2.0
NR 208.05(3)(c)(c) Effluent quality and plant performance (total suspended solids -TSS). NR 208.05(3)(c)1.1. Point assignments for WPDES permit limit exceedances and for percentages of effluent TSS limits in the previous calendar year shall be as follows: NR 208.05(3)(c)2.2. For systems that discharge intermittently to waters of the state, the points per monthly exceedance for this CMAR section shall be based upon a multiplication factor of 12 months divided by the number of months of discharge. NR 208.05 NoteExample: For a wastewater facility discharging only 6 months of the year, the multiplication factor is 12 /6 = 2.0
NR 208.05(3)(d)1.1. Point assignments for exceedances of monthly WPDES permit limits for effluent ammonia (NH3) in the previous calendar year shall be as follows: NR 208.05(3)(d)2.2. If monthly limits do not apply and the applicable ammonia limits in a permit are weekly, then point assignments related to exceedances of weekly WPDES permit limits for effluent ammonia (NH3) in the previous calendar year shall be as follows: NR 208.05(3)(e)1.1. Point assignments for exceedances of monthly WPDES permit limits for effluent total phosphorus (total P) in the previous calendar year shall be as follows: NR 208.05(3)(e)2.2. For systems that discharge intermittently to waters of the state, the points per monthly exceedance for this CMAR section shall be based upon a multiplication factor of 12 months divided by the number of months of discharge. NR 208.05 NoteExample: For a wastewater facility discharging only 6 months of the year, the multiplication factor is 12 /6 = 2.0
NR 208.05(3)(f)(f) Effluent quality and plant performance (total nitrogen-total N). NR 208.05(3)(f)1.1. Point assignments for exceedances of monthly WPDES permit limits for effluent total nitrogen (total N) in the previous calendar year shall be as follows: NR 208.05(3)(f)2.2. For systems that discharge intermittently to waters of the state, the points per monthly exceedance for this CMAR section shall be based upon a multiplication factor of 12 months divided by the number of months of discharge.