NR 254.003(5) (5) Alternative effluent limitations are not permitted for cokemaking and cold forming process wastewaters.
NR 254.003 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.004 NR 254.004Calculation of pretreatment standards.
NR 254.004(1)(1) Pretreatment standards shall be calculated for each operation using the applicable average rate of production reported by the owner or operator of the facility to the control authority in accordance with s. NR 211.15.
NR 254.004(2) (2) The average rate of production reported by the owner or operator in accordance with s. NR 211.15 may not be based upon the design production capacity, but rather upon a reasonable measure of actual production of the facility, such as the production during the high month of the previous year or the monthly average for the highest month of the previous 5 years. For new sources or new dischargers, actual production shall be estimated using projected production.
NR 254.004(3) (3) If the average rate of production for an operation reported in accordance with s. NR 211.15 does not represent a reasonable measure of actual production due to a change of circumstances, the owner or operator shall submit a modified average rate of production to the control authority.
NR 254.004 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.005 NR 254.005Compliance dates.
NR 254.005(1) (1) Any existing source subject to this chapter which discharges to waters of the state shall achieve:
NR 254.005(1)(a) (a) the effluent limitations representing BPT by July 1, 1977; and
NR 254.005(1)(b) (b) the effluent limitations representing BAT by July 1, 1984.
NR 254.005(2) (2) Any new source subject to this chapter which discharges to waters of the state shall achieve NSPS at the commencement of discharge.
NR 254.005(3) (3) Any existing source subject to this chapter which introduces process wastewater pollutants into a POTW shall achieve PSES by July 10, 1985.
NR 254.005(4) (4) Any new source subject to this chapter which introduces process wastewater pollutants into a POTW shall achieve PSNS at the commencement of discharge.
NR 254.005 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.006 NR 254.006Removal credits for phenols (4AAP). Removal allowances pursuant to s. NR 211.13 may be granted for phenols (4AAP) limited by this chapter when phenols (4AAP) are used as an indicator or surrogate pollutant.
NR 254.006 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
subch. I of ch. NR 254 Subchapter I — Cokemaking Subcategory
NR 254.01 NR 254.01Applicability; description of the cokemaking subcategory. This subcategory applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from byproduct and beehive cokemaking operations.
NR 254.01 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.011 NR 254.011Specialized definitions. The following definitions are applicable to the terms used in cokemaking subcategory:
NR 254.011(1) (1) “Beehive cokemaking” means operations in which coal is heated with the admission of air in controlled amounts for the purpose of producing coke and which do not recover byproducts.
NR 254.011(2) (2) “Byproduct cokemaking” means operations in which coal is heated in the absence of air to produce coke. Byproducts may be recovered from the gases and liquids driven from the coal.
NR 254.011(3) (3) “Merchant byproduct cokemaking” means byproduct cokemaking operations which provide more than 50% of the produced coke to operations, industries, or processes other than iron making blast furnaces associated with steel production.
NR 254.011(4) (4) “Iron and steel byproduct cokemaking” means byproduct cokemaking operations other than merchant cokemaking operations.
NR 254.011(5) (5) “Wet desulfurization system” means systems which remove sulfur compounds from coke oven gases and produce contaminated process wastewater.
NR 254.011(6) (6) “Indirect ammonia recovery system” means systems which recover ammonium hydroxide as a byproduct from coke oven gases and waste ammonia liquors.
NR 254.011(7) (7) “Physical chemical treatment system” means full scale coke plant wastewater treatment systems incorporating full scale granular activated carbon adsorption units which were in operation prior to January 7, 1981.
NR 254.011 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.012 NR 254.012Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 254.012(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the effluent limitations set forth in sub. (2), (3), or (4) representing the degree of effluent reduction attainable by the application of BPT.
NR 254.012(2) (2)Iron and steel byproduct cokemaking.
NR 254.012(2)(a)(a) The following BPT effluent limitations apply: - See PDF for table PDF
NR 254.012 Note (1) Within the range of 6.0 to 9.0
NR 254.012(2)(b) (b) Increased loadings, not to exceed 11% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.012(2)(c) (c) Increased loadings, not to exceed 27% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.012(3) (3)Merchant byproduct cokemaking.
NR 254.012(3)(a)(a) The following BPT effluent limitations apply: - See PDF for table PDF
NR 254.012 Note (1) Within the range of 6.0 to 9.0
NR 254.012(3)(b) (b) Increased loadings, not to exceed 10% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.012(3)(c) (c) Increased loadings, not to exceed 25% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.012(4) (4)Beehive cokemaking. Beehive cokemaking operations may not discharge process wastewaters to waters of the state.
NR 254.012 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.013 NR 254.013Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 254.013(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the effluent limitations in sub. (2), (3), or (4) representing the degree of effluent reduction attainable by the application of BAT.
NR 254.013(2) (2)Iron and steel byproduct cokemaking.
NR 254.013(2)(a)(a) The following BAT effluent limitations apply: - See PDF for table PDF
NR 254.013(2)(b) (b) Increased loadings, not to exceed 16% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.013(2)(c) (c) Increased loadings, not to exceed 39% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.013(2)(d) (d) The following BAT effluent limitations shall be applicable to plants with physical chemical treatment systems: - See PDF for table PDF
NR 254.013(2)(e) (e) Increased loadings, not to exceed 24% above the limitations in par. (d), are allowed for plants with physical chemical pretreatment systems which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.013(3) (3)Merchant byproduct cokemaking.
NR 254.013(3)(a)(a) The following BAT effluent limitations apply: - See PDF for table PDF
NR 254.013(3)(b) (b) Increased loadings, not to exceed 15% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.013(3)(c) (c) Increased loadings, not to exceed 35% of the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.013(3)(d) (d) The following BAT effluent limitations shall be applicable to plants with physical chemical treatment systems: - See PDF for table PDF
NR 254.013(3)(e) (e) Increased loadings, not to exceed 21% above the limitations in par. (d), are allowed for plants with physical chemical pretreatment systems which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.013(4) (4)Beehive cokemaking. Beehive cokemaking operations may not discharge process wastewaters to waters of the state.
NR 254.013 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.014 NR 254.014New source performance standards.
NR 254.014(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the NSPS in sub. (2), (3), or (4).
NR 254.014(2) (2)Iron and steel byproduct cokemaking.
NR 254.014(2)(a)(a) The following NSPS apply: - See PDF for table PDF
NR 254.014 Note (1) Within the range of 6.0 to 9.0
NR 254.014(2)(b) (b) Increased loadings, not to exceed 16% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.014(2)(c) (c) Increased loadings, not to exceed 39% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.014(3) (3)Merchant byproduct cokemaking.
NR 254.014(3)(a)(a) The following NSPS apply: - See PDF for table PDF
NR 254.014 Note (1) Within the range of 6.0 to 9.0
NR 254.014(3)(b) (b) Increased loadings, not to exceed 15% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.014(3)(c) (c) Increased loadings, not to exceed 35% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.014(4) (4)Beehive cokemaking. Beehive cokemaking operations may not discharge process wastewaters to waters of the state.
NR 254.014 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.015 NR 254.015Pretreatment standards for existing sources.
NR 254.015(1)(1) Except as provided in ss. NR 211.13 and 211.14, any existing source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the PSES in sub. (2) or (3).
NR 254.015(2) (2)Iron and steel byproduct cokemaking.
NR 254.015(2)(a)(a) The following PSES apply: - See PDF for table PDF
NR 254.015(2)(b) (b) Increased loadings, not to exceed 24% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.015(2)(c) (c) Increased loadings, not to exceed 58% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.015(3) (3)Merchant byproduct cokemaking.
NR 254.015(3)(a)(a) The following PSES apply: - See PDF for table PDF
NR 254.015(3)(b) (b) Increased loadings, not to exceed 21% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
NR 254.015(3)(c) (c) Increased loadings, not to exceed 50% above the limitations in par. (a), are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
NR 254.015 History History: Cr. Register, May, 1989, No. 401, eff. 6-1-89.
NR 254.016 NR 254.016Pretreatment standards for new sources.
NR 254.016(1)(1) Except as provided in s. NR 211.13, any existing [new] source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the PSNS in sub. (2) or (3).
NR 254.016(2) (2)Iron and steel byproduct cokemaking.
NR 254.016(2)(a)(a) The following PSNS apply: - See PDF for table PDF
NR 254.016(2)(b) (b) Increased loadings, not to exceed 24% above the limitations in par. (a), are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.