NR 255.53(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 93 to 96.
NR 255.53 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.55 NR 255.55Pretreatment standards for new sources.
NR 255.55(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.55(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 97 to 99. 
NR 255.55 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. VII of ch. NR 255 Subchapter VII — Magnesium Subcategory
NR 255.60 NR 255.60Applicability; description of the magnesium subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing magnesium anode batteries.
NR 255.60 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.63 NR 255.63New source performance standards.
NR 255.63(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards: - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
NR 255.63(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 100 to 104.
NR 255.63 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.64 NR 255.64Pretreatment standards for existing sources.
NR 255.64(1)(1) Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.64(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 105 to 108.
NR 255.64 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.65 NR 255.65Pretreatment standards for new sources.
NR 255.65(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.65(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 109 to 112. 
NR 255.65 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. VIII of ch. NR 255 Subchapter VIII — Zinc Subcategory
NR 255.70 NR 255.70Applicability; description of the zinc subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing zinc anode batteries.
NR 255.70 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.71 NR 255.71Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 255.71(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BPT: - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
NR 255.71(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 113 to 124. 
NR 255.71 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.72 NR 255.72Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 255.72(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BAT: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.72(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 125 to 136.
NR 255.72 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.73 NR 255.73New source performance standards.
NR 255.73(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards: - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
NR 255.73(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 137 to 146. 
NR 255.73 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.74 NR 255.74Pretreatment standards for existing sources.
NR 255.74(1)(1) Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.74(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 147 to 158.
NR 255.74 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.75 NR 255.75Pretreatment standards for new sources.
NR 255.75(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.75(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 159 to 168.
NR 255.75 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.80 NR 255.80Cross-references. The federal citations in this chapter correspond to provisions of the Wisconsin administrative code and Wisconsin statutes. The federal citations may be cross-referenced in the following table: - See PDF for table PDF
NR 255.80 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.