LRBa2329/1
MCP:cjs&ahe
2015 - 2016 LEGISLATURE
ASSEMBLY AMENDMENT 1,
TO ASSEMBLY SUBSTITUTE AMENDMENT 1,
TO ASSEMBLY BILL 874
February 18, 2016 - Offered by Representative Nerison.
AB874-ASA1-AA1,1,11 At the locations indicated, amend the substitute amendment as follows:
AB874-ASA1-AA1,1,3 21. Page 5, line 12: after "the hydrology of" insert "Pleasant Lake in Waushara
3County and any other navigable stream or navigable lake located in".
AB874-ASA1-AA1,1,7 42. Page 5, line 13: delete the material beginning with "except for" and ending
5with "prevent or remedy" on line 15 and substitute "for which the department seeks
6to determine whether existing and potential groundwater withdrawals are causing
7or are likely to cause".
AB874-ASA1-AA1,1,8 83. Page 5, line 15: delete "of a" and substitute "of the".
AB874-ASA1-AA1,1,11 94. Page 5, line 17: after "seasonal levels." insert "The department may request,
10under s. 13.10, the joint committee on finance to provide funding and positions for
11the evaluation and modeling under this paragraph.".
AB874-ASA1-AA1,2,3
15. Page 5, line 20: after "plant life." insert "The department shall begin the
2evaluation and modeling under this paragraph no later than one year after the
3effective date of this paragraph .... [LRB inserts date].".
AB874-ASA1-AA1,2,5 46. Page 7, line 16: delete "The department" and substitute "No later than 3
5years after beginning the evaluation and modeling under par. (am), the department".
AB874-ASA1-AA1,2,7 67. Page 8, line 2: delete "The department" and substitute "No later than 3
7years after beginning the evaluation and modeling under par. (am), the department".
AB874-ASA1-AA1,2,10 88. Page 8, line 12: after "by statute." insert "Notwithstanding par. (m), nothing
9in this subsection shall affect the department's review of applications and issuance
10of approvals for high capacity wells located in the area studied under par. (am)".
AB874-ASA1-AA1,2,12 119. Page 8, line 15: after "sub. (2g) 2. to 4." insert "in the area studied under par.
12(am)".
AB874-ASA1-AA1,2,15 1310. Page 8, line 20: delete that line and substitute "lake association or lake
14district to construct and operate a new high capacity well, or to operate an existing
15approved high capacity well, for the sole purpose of".
AB874-ASA1-AA1,2,16 1611. Page 8, line 25: after "lake association" insert "or lake district".
AB874-ASA1-AA1,2,17 1712. Page 9, line 5: after "lake association" insert "or lake district".
AB874-ASA1-AA1,2,18 1813. Page 9, line 9: after "lake associations" insert "and lake districts".
AB874-ASA1-AA1,2,19 1914. Page 9, line 10: after "constructing" insert "or operating".
AB874-ASA1-AA1,2,20 2015. Page 9, line 12: after "lake associations" insert "and lake districts".
AB874-ASA1-AA1,2,21 2116. Page 9, line 21: after that line insert:
AB874-ASA1-AA1,3,2
1"1m. The department does not submit the report under par. (f) or (g) within 3
2years after beginning the evaluation and modeling under par. (am).".
Loading...
Loading...