6.
Page 329, line 9: after that line insert:

"SECTION 273e. 20.370 (9) (mh) of the statutes is amended to read:

20.370 (9) (mh) General program operations -- stationary sources. From the general fund, from the moneys received from fees imposed on owners and operators of stationary sources for which operation permits are required under the federal clean air act under s. 285.69 (2) (a) and (e), the amounts in the schedule for customer service, communications and aids administration for the operation permit program under ch. 285 and s. 299.15.".

7.
Page 995, line 21: after that line insert:

"SECTION 2192p. 285.66 (1) of the statutes is amended to read:

285.66 (1) CONSTRUCTION. Unless otherwise specified in the permit, a construction permit, the authorization to construct, reconstruct, replace, or modify a stationary source is valid for 18 months from the date of issuance of the permit unless the permit is revoked or suspended. The department may extend the term of the authorization in the construction permit for the purposes of commencing or completing construction, reconstruction, replacement, or modification. Unless otherwise specified in a construction permit, the department may only extend the term of the authorization in the permit for up to 18 additional months beyond the original 18-month period. If construction, reconstruction, replacement, or modification is not completed within the term specified in the permit or any extension granted by the department, the applicant shall apply for a new construction permit. Notwithstanding the fact that authorization to construct, reconstruct, replace, or modify a source expires under this subsection, all conditions in a construction permit are permanent unless the conditions are revised through a revision of the construction permit or through the issuance of a new construction permit.

SECTION 2192v. 285.69 (1) (a) of the statutes is renumbered 285.69 (1) (a) (intro.) and amended to read:

285.69 (1) (a) Application for permit. (intro.) Reviewing and acting upon any application for a construction permit., except that the department may not impose a fee on any of the following persons who apply for a construction permit:

SECTION 2192w. 285.69 (1) (a) 1. to 3. of the statutes are created to read:

285.69 (1) (a) 1. An owner or operator of an entire facility for which an operation permit is required under s. 285.60 but not under the federal clean air act if the entire facility is covered by a registration permit under s. 285.60 (2g).

2. An owner or operator of an entire facility for which an operation permit is required under s. 285.60 but not under the federal clean air act if the entire facility is covered by a general permit under s. 285.60 (3).

3. An owner or operator of an entire facility for which an operation permit is required under s. 285.60 but not under the federal clean air act for which the department has issued an operation permit, if the owner or operator has paid the fee under sub. (2) (h) at any time before applying for the construction permit.".

8.
Page 996, line 7: delete the material beginning with that line and ending with page 997, line 5, and substitute:

"SECTION 2196d. 285.69 (2) (c) (intro.) of the statutes is amended to read:

285.69 (2) (c) (intro.) The fees collected under pars. (a) and (e) from the owner or operator of a stationary source for which an operation permit is required under the federal clean air act shall be credited to the appropriations under s. 20.370 (2) (bg), (3) (bg), (8) (mg) and (9) (mh) for the following:

SECTION 2196g. 285.69 (2) (f) of the statutes is created to read:

285.69 (2) (f) Notwithstanding pars. (a) and (e), the owner or operator of an entire facility for which an operation permit is required under s. 285.60 but not under the federal clean air act shall pay to the department a fee of $1,100 for a year if the preceding year was the first year in which the entire facility was covered by a registration permit under s. 285.60 (2g). Paragraphs (a) and (e) apply in all other years.

SECTION 2196h. 285.69 (2) (g) of the statutes is created to read:

285.69 (2) (g) Notwithstanding pars. (a) and (e), the owner or operator of an entire facility for which an operation permit is required under s. 285.60 but not under the federal clean air act shall pay to the department a fee of $2,300 for a year if the preceding year was the first year in which the entire facility was covered by a general permit under s. 285.60 (3) and the facility was first covered by an operation permit after the effective date of this paragraph .... [revisor inserts date]. Paragraphs (a) and (e) apply in all other years.

SECTION 2196i. 285.69 (2) (h) of the statutes is created to read:

285.69 (2) (h) 1. Notwithstanding pars. (a) and (e), the owner or operator of an entire facility for which an operation permit is required under s. 285.60 but not under the federal clean air act may elect to pay the department a fee of $7,500 for a year if the entire facility was not covered by a registration operation permit under s. 285.60 (2g) or by a general operation permit under s. 285.60 (3) in the preceding year and the owner or operator has not previously elected to pay the fee under this subdivision. Paragraphs (a) and (e) apply in all other years.

2. Notwithstanding subd. 1. and pars. (a) and (e), for 2006 only, the owner or operator of an entire facility for which an operation permit is required under s. 285.60 but not under the federal clean air act and that is not a synthetic minor source, as defined in NR 407.02 (9), Wis. Adm. Code, shall pay a fee of $300 if the entire facility was not covered by a registration operation permit under s. 285.60 (2g) or by a general operation permit under s. 285.60 (3) in 2005.".

9.
Page 997, line 5: after that line insert:

"SECTION 2196j. 285.69 (2) (i) of the statutes is created to read:".

10.
Page 997, line 6: delete "(d) Use of fees." and substitute "285.69 (2) (i)".

11.
Page 997, line 6: delete "subsection and" and substitute "subsection from the owner or operator of a stationary source for which an operation permit is required under s. 285.60 but not under the federal clean air act and under".

12.
Page 1087, line 5: after that line insert:

"(4k) AIR PERMIT REPORT. No later than December 15, 2006, the department of natural resources shall submit a report to the joint committee on finance that does all of the following:

(a) Describes the department's progress on implementing changes in the air pollution permitting program made by 2003 Wisconsin Act 118 and on the development of an information technology system for the air pollution permitting program.

(b) States the number of sources for which operation permits are required under section 285.60 of the statutes but not federal law that are covered by registration permits, general permits, and operation permits that are not registration permits or general permits.

(c) States, for sources for which operation permits are required under section 285.60 of the statutes but not federal law, the average number of days from receipt of a complete application until the department issues a determination of coverage under a registration permit, the average number of days from receipt of a complete application until the department issues a determination of coverage under a general permit, and the average number of days from receipt of a complete application until issuance of an operation permit that is not a registration permit or general permit.

(d) Includes an analysis of the costs of the air pollution permitting program and the revenues necessary to run the program after the changes described in paragraph (a) are fully implemented.".

13.
Page 1105, line 18: after that line insert:

"(4k) AIR PERMIT FEE TRANSFER. There is transferred from the appropriation account under section 20.370 (2) (bg) of the statutes, as affected by this act, to the appropriation account under section 20.370 (2) (bh) of the statutes, as created by this act, $175,000 in fiscal year 2006-07.".

14.
Page 1127, line 11: delete "(bh)" and substitute "(bg), (bh),".

15.
Page 1127, line 12: delete that line and substitute "(3) (bg), (8) (mg), and (9) (mh), 285.01 (17m), and 285.69 (1d), (1g), (2) (c) (intro.), (f), (g), (h), and (i) of the statutes, the renumbering and amendment of section 285.69 (1) (a) of the statutes, and the creation of section 285.69 (1) (a) 1. to 3. of the statutes".

16.
Page 1127, line 13: substitute "take" for "takes".
(End)
LRBb0164LRBb0164/2
GMM:kjf:jf
2005 - 2006 LEGISLATURE

LFB:......Osanger (Yvonne) home visitation programs
For 2005-07 Budget -- Not Ready For Introduction
ASSEMBLY AMENDMENT ,
TO 2005 ASSEMBLY BILL 100
At the locations indicated, amend the bill as follows:
1.
Page 340, line 13: delete lines 13 to 18.

2.
Page 473, line 21: delete lines 21 and 22.

3.
Page 474, line 17: delete lines 17 to 25.

4.
Page 475, line 1: delete lines 1 to 24.

5.
Page 476, line 1: delete lines 1 to 25.

6.
Page 477, line 1: delete lines 1 to 25.

7.
Page 478, line 1: delete lines 1 to 19.

8.
Page 1124, line 19: delete lines 19 to 21.
(End)
LRBb0165LRBb0165/1
RCT:kjf:jf
2005 - 2006 LEGISLATURE

LFB:......Bonderud - Delete the extension of funding for Town of Swiss water and wastewater funding
For 2005-07 Budget -- Not Ready For Introduction
ASSEMBLY AMENDMENT ,
TO 2005 ASSEMBLY BILL 100
At the locations indicated, amend the bill as follows:
1.
Page 321, line 21: delete the material beginning with that line and ending with page 322, line 3.
(End)
LRBb0166LRBb0166/1
RCT:kjf:jf
2005 - 2006 LEGISLATURE

LFB:......Bonderud - Eliminate change to well compensation program, lapse from program
For 2005-07 Budget -- Not Ready For Introduction
ASSEMBLY AMENDMENT ,
TO 2005 ASSEMBLY BILL 100
At the locations indicated, amend the bill as follows:
1.
Page 322, line 10: delete lines 10 to 12.

2.
Page 990, line 14: delete the material beginning with that line and ending with page 995, line 17.

3.
Page 1105, line 18: after that line insert:

"(3f) WELL COMPENSATION PROGRAM LAPSE. Notwithstanding section 20.001 (3) (c) of the statutes, in fiscal year 2005-06, $1,000,000 is lapsed to the environmental fund from the appropriation account under section 20.370 (6) (cr) of the statutes.".
(End)
LRBb0167LRBb0167/1
RCT:kjf:jf
2005 - 2006 LEGISLATURE

LFB:......Bonderud - Eliminate fee authority for electronic reporting system
For 2005-07 Budget -- Not Ready For Introduction
ASSEMBLY AMENDMENT ,
TO 2005 ASSEMBLY BILL 100
At the locations indicated, amend the bill as follows:
1.
Page 320, line 5: delete lines 5 to 7.

2.
Page 998, line 23: delete the material beginning with that line and ending with page 999, line 4.
(End)
LRBb0168LRBb0168/1
PJK:kjf:rs
2005 - 2006 LEGISLATURE

LFB:......Swissdorf - Frequency of providing emergency assistance to needy persons
For 2005-07 Budget -- Not Ready For Introduction
ASSEMBLY AMENDMENT ,
TO 2005 ASSEMBLY BILL 100
At the locations indicated, amend the bill as follows:
1.
Page 532, line 19: after that line insert:

"SECTION 1059m. 49.138 (1m) (intro.) of the statutes is amended to read:

49.138 (1m) (intro.) The department shall implement a program of emergency assistance to needy persons in cases of fire, flood, natural disaster, homelessness or impending homelessness, or energy crisis. The department shall establish the maximum amount of aid to be granted, except for cases of energy crisis, per family member based on the funding available under s. 20.445 (3) (dz) and (md). The department need not establish the maximum amount by rule under ch. 227. The department shall publish the maximum amount and annual changes to it in the Wisconsin administrative register. Emergency assistance provided to needy persons under this section in cases of fire, flood, natural disaster, or energy crisis may only be provided to a needy person once in a 12-month period. Emergency assistance provided to needy persons under this section in cases of homelessness or impending homelessness may be used only to obtain or retain a permanent living accommodation and, except as provided in sub. (2), may only be provided to a needy person once in a 36-month period. For the purposes of this section, a family is considered to be homeless, or to be facing impending homelessness, if any of the following applies:

SECTION 1059n. 49.138 (2) of the statutes is repealed.".
(End)
LRBb0169LRBb0169/2
PJK:kjf:rs
2005 - 2006 LEGISLATURE

LFB:......Swissdorf - Eligibility for child care subsidy under W-2
For 2005-07 Budget -- Not Ready For Introduction
ASSEMBLY AMENDMENT ,
TO 2005 ASSEMBLY BILL 100
At the locations indicated, amend the bill as follows:
1.
Page 539, line 16: after that line insert:

"SECTION 1077r. 49.155 (1m) (a) (intro.) of the statutes is amended to read:

49.155 (1m) (a) (intro.) The individual is a parent of a child who meets the requirement under s. 49.145 (2) (c) and who is under the age of 13 or, if the child is disabled, is under the age of 19; or is a person who, under s. 48.57 (3m) or (3n), is providing care and maintenance for a child who meets the requirement under s. 49.145 (2) (c) and who is under the age of 13 or, if the child is disabled, is under the age of 19; and child care services for that child are needed in order for the individual to do any of the following:".

2.
Page 540, line 4: after that line insert:

"SECTION 1079s. 49.155 (1m) (b) 1. of the statutes is amended to read:

49.155 (1m) (b) 1. Section 49.145 (2) (c), (f) and (g).".

3.
Page 540, line 9: delete "individual" and substitute "individual child".
(End)
LRBb0170LRBb0170/2
PJK:jld:rs
2005 - 2006 LEGISLATURE

LFB:......Swissdorf - Disclosure of financial information by W-2 agencies
Loading...
Loading...