AB649-ASA1,71,1711
(c)
Remedies. The commission shall promulgate rules specifying remedies to
12implement under par. (b) 3. that are in proportion to the magnitude of the failure to
13achieve a goal and the degree to which a statewide programs contractor or person
14administering the utility-administered, large energy customer, or commitment to
15community program did not make a good faith effort or did not control the factors
16that resulted in the failure to achieve the goal. The rules shall include all of the
17following remedies:
AB649-ASA1,71,2118
1. An order that a statewide programs contractor or person take corrective
19actions, which may include achieving the goal in a year or other time period specified
20by the commission, in addition to achieving any other goal under this section that
21applies to that year or time period.
AB649-ASA1,71,2222
2. For a goal under the statewide programs:
AB649-ASA1,71,2523
a. An order that the energy utilities invoke any provisions of a contract under
24sub. (2) (a) 1., or that a statewide programs contractor invoke any provisions of a
25subcontract, that impose monetary penalties for failure to achieve a goal.
AB649-ASA1,72,3
1b. An order that the energy utilities modify or terminate the contract with a
2statewide programs contractor under sub. (2) (a) 1. or an order that a statewide
3programs contractor modify or terminate any subcontract.
AB649-ASA1,72,54
3. For a goal under a utility-administered or large energy customer program,
5an order modifying or terminating the program.
AB649-ASA1,72,146
4. For a goal of a municipal utility or retail electric cooperative, an order
7requiring the municipal utility or retail electric cooperative to modify or terminate
8a contract with or assignment to a wholesale supplier under sub. (7) (am) 3. or (bg),
9or enter into a contract with a statewide programs contractor under sub. (7) (am) 2.,
10or an order requiring both. The commission may rescind an order requiring a
11municipal utility or retail electric cooperative to enter into a contract with a
12statewide programs contractor if the municipal utility or retail electric cooperative
13provides reasonable assurance that it will provide programs and set budgets
14reasonably designed to achieve the goal in the future.
AB649-ASA1,72,1515
5. Any other remedy specified by the commission.
AB649-ASA1, s. 158
16Section
158. 196.374 (9) and (10) of the statutes are created to read:
AB649-ASA1,72,2317
196.374
(9) Treatment of certain capital investments. (a) The commission
18may allow an energy utility to earn a return on capital invested by the energy utility
19under a utility-administered or supplemental utility program for energy
20conservation or efficiency equipment that is located on customer premises, including
21equipment owned by either the energy utility or a customer. The commission may
22make such an allowance only if the commission determines that the investment is
23prudent and a cost-effective means of advancing energy conservation or efficiency.
AB649-ASA1,73,3
1(b) The commission shall promulgate rules to implement this subsection,
2including rules specifying the energy conservation or efficiency equipment that
3qualifies for treatment under par. (a).
AB649-ASA1,73,10
4(10) Coordination with federal law. The commission shall minimize
5reporting and other compliance requirements on energy providers to the maximum
6extent allowed under this section for the purpose of coordination with any similar
7requirements under federal law. If the commission determines that statutory
8changes to this section are necessary to comply with this subsection, the commission
9shall submit a report recommending the statutory changes to the legislature in the
10manner described under s. 13.172 (3).
AB649-ASA1, s. 162
14Section
162. 196.378 (1) (intro.) and (ag) of the statutes are renumbered
15196.378 (1r) (intro.) and (ag), and 196.378 (1r) (ag), as renumbered, is amended to
16read:
AB649-ASA1,73,1817
196.378
(1r) (ag) "Baseline renewable percentage" means the average of an
18energy electric provider's renewable energy percentage for 2001, 2002, and 2003.
AB649-ASA1, s. 164
20Section
164. 196.378 (1) (ar) of the statutes is renumbered 196.378 (1r) (ar)
21and amended to read:
AB649-ASA1,74,222
196.378
(1r) (ar) "Biomass"
means a resource that derives energy from wood
23or plant material or residue, biological waste, crops grown for use as a resource or
24landfill gases. "Biomass" does not include garbage, as defined in s. 289.01 (9), or
25nonvegetation-based industrial, commercial or household waste, except that
1"biomass" includes refuse-derived fuel used for a renewable facility that was in
2service before January 1, 1998 has the meaning given in s. 196.374 (1) (am).
AB649-ASA1, s. 166
4Section
166. 196.378 (1) (c) and (d) of the statutes are renumbered 196.378 (1r)
5(c) and (d).
AB649-ASA1, s. 167
6Section
167. 196.378 (1) (fg) of the statutes is renumbered 196.378 (1r) (fg)
7(intro.) and amended to read:
AB649-ASA1,74,98
196.378
(1r) (fg) (intro.) "Renewable energy" means electricity derived from
9a any of the following:
AB649-ASA1,74,14
101. A renewable resource.
If the electricity is derived from the combustion of a
11renewable resource fuel and another fuel, the "renewable energy" calculated under
12this subdivision is the total amount of electricity that is derived multiplied by a ratio,
13of which the numerator is the energy content of the renewable resource fuel and the
14denominator is the energy content of the renewable resource fuel and the other fuel.
AB649-ASA1, s. 168
15Section
168. 196.378 (1) (fm) (intro.) of the statutes is renumbered 196.378
16(1r) (fm) (intro.).
AB649-ASA1, s. 169
17Section
169. 196.378 (1) (fm) 1. of the statutes is renumbered 196.378 (1r) (fm)
181. and amended to read:
AB649-ASA1,74,2019
196.378
(1r) (fm) 1. The electric provider's
total renewable energy in that year
20that is allowed under the rules promulgated under sub. (3) (a) 5.
AB649-ASA1, s. 170
21Section
170. 196.378 (1) (fm) 2. of the statutes is renumbered 196.378 (1r) (fm)
222. and amended to read:
AB649-ASA1,74,2523
196.378
(1r) (fm) 2. The
renewable resource portfolio credits
created or
24purchased by the electric provider, if any, that the electric provider elects to use in
25that year.
AB649-ASA1, s. 172
2Section
172. 196.378 (1) (g) of the statutes is renumbered 196.378 (1r) (g).
AB649-ASA1, s. 173
3Section
173. 196.378 (1) (h) (intro.) of the statutes is renumbered 196.378 (1r)
4(h) and amended to read:
AB649-ASA1,75,65
196.378
(1r) (h) "Renewable resource"
means any of the following: has the
6meaning given in s. 196.374 (1) (j).
AB649-ASA1, s. 174
7Section
174. 196.378 (1) (h) 1., 1m. and 2. of the statutes are repealed.
AB649-ASA1, s. 175
8Section
175. 196.378 (1) (i) of the statutes is renumbered 196.378 (1r) (i) and
9amended to read:
AB649-ASA1,75,1210
196.378
(1r) (i) "Renewable resource credit" means
a renewable resource
11credit, as defined in s. 196.378 (1) (i), 2007 stats., or a
renewable resource credit
12calculated in accordance with rules promulgated created under sub. (3) (a)
1. and 2.
AB649-ASA1, s. 177
14Section
177. 196.378 (1) (k) of the statutes is renumbered 196.378 (1r) (k).
AB649-ASA1, s. 179
16Section
179. 196.378 (1) (p) of the statutes is renumbered 196.378 (1r) (p).
AB649-ASA1,75,1818
196.378
(1g) Legislative findings. The legislature finds all of the following:
AB649-ASA1,75,2319
(a) It is essential to the health and safety and economic well-being of
20Wisconsin that the state maintain a highly reliable electric system at all times that
21includes a diverse mix of resources both in terms of type and geographic location.
22Geographic diversity is particularly important for intermittent resources like wind
23power.
AB649-ASA1,76,324
(b) It is essential to the health and safety and economic well-being of Wisconsin
25that the state take actions to mitigate global climate change from emissions of
1greenhouse gasses. Central to such mitigation efforts is reducing reliance on
2electricity produced from fossil fuels through policies such as the renewable portfolio
3standard.
AB649-ASA1,76,104
(c) As of the effective date of this paragraph .... [LRB inserts date], the most
5abundant and affordable sources of electricity that can be used to comply with the
6renewable portfolio standard are wind resources in western Minnesota, the Dakotas,
7and Iowa. Exclusive reliance on these resources for compliance with the renewable
8portfolio standard will produce a significant increase in dependence on imported
9electricity with the associated congestion cost risks and not provide needed diversity
10for the state's renewable resource portfolio.
AB649-ASA1,76,1711
(d) To balance the competing imperatives of developing a renewable generation
12portfolio that is diverse as to geographic location and type of renewable resources in
13the portfolio, including smaller scale distributed resources, mitigating high
14transmission congestion cost risk, and reducing dependence on electricity produced
15from fossil fuels, it is essential that Wisconsin adopt a renewable portfolio standard
16that requires a part of the production of electricity from renewable resources in this
17state.
AB649-ASA1,76,2019
196.378
(1r) (at) "Conservation certificate" means a certificate created under
20the rules promulgated under sub. (3m) (b).
AB649-ASA1,77,222
196.378
(1r) (de) "In-state percentage" means, with respect to an electric
23provider, the portion of the electric provider's renewable energy percentage that is
24derived from electricity generated by renewable facilities located in this state,
1renewable resource credits separated from such electricity, and nonelectric energy
2credits.
AB649-ASA1,77,74
196.378
(1r) (dm) "Nonelectric energy" means any of the following types of
5energy or fuel produced or generated at a facility located in this state and placed in
6service on or after the effective date of this paragraph .... [LRB inserts date], but only
7if the energy or fuel displaces fossil fuel use in this state:
AB649-ASA1,77,158
1. The thermal output from a cogeneration production plant, as defined in s.
979.005 (1g). If the cogeneration production plant is fueled with a mixture of
10renewable resource fuel, synthetic fuel, or pelletized waste, and other fuel, the
11thermal output under this subdivision shall be the total thermal output of the
12cogeneration production plant multiplied by a ratio, of which the numerator is the
13energy content of the renewable resource fuel, synthetic fuel, or pelletized waste and
14the denominator is the energy content of the renewable resource fuel, synthetic fuel,
15or pelletized waste, and the other fuel.
AB649-ASA1,77,2116
2. The thermal output from a renewable resource-fueled or synthetic
17fuel-fueled boiler. If the boiler is fueled with a mixture of a renewable resource or
18synthetic fuel, and other fuel, the thermal output under this subdivision shall be the
19total thermal output of the boiler multiplied by a ratio, of which the numerator is the
20energy content of the renewable resource or synthetic fuel and the denominator is
21the energy content of the renewable resource or synthetic fuel, and the other fuel.
AB649-ASA1,77,2222
3. The thermal output of a geothermal system.
AB649-ASA1,77,2323
4. Biogas that is put into a natural gas transmission or distribution pipeline.
AB649-ASA1,77,2424
5. The thermal output of a solar water heating system.
AB649-ASA1,77,2525
6. Useable light delivered by a solar light pipe.
AB649-ASA1,78,2
17. Energy derived from other applications, specified by the commission by rule,
2that produce energy other than electricity from renewable resources.
AB649-ASA1,78,54
196.378
(1r) (ds) "Nonelectric energy credit" means a credit created under the
5rules under sub. (3) (b).
AB649-ASA1,78,97
196.378
(1r) (dw) "Pelletized waste" means pellets made from waste material
8that does not include garbage, as defined in s. 289.01 (9), and that contains no more
9than 30 percent fixed carbon.
AB649-ASA1,78,1211
196.378
(1r) (em) "Portfolio credit" means a nonelectric energy credit or
12renewable resource credit.
AB649-ASA1, s. 187
13Section
187. 196.378 (1r) (fg) 2. of the statutes is created to read:
AB649-ASA1,78,1914
196.378
(1r) (fg) 2. The combustion of refuse-derived fuel in a facility that was
15in service before January 1, 1998. If the facility is fueled with a mixture of
16refuse-derived fuel and fossil fuels, renewable energy calculated under this
17subdivision is the total amount of electricity derived from the facility multiplied by
18a ratio, of which the numerator is the energy content of the refuse-derived fuel and
19the denominator is the energy content of the refuse-derived fuel and the fossil fuels.
AB649-ASA1, s. 188
20Section
188. 196.378 (1r) (fg) 3. of the statutes is created to read:
AB649-ASA1,79,221
196.378
(1r) (fg) 3. The combustion of solid waste that has been subject to a
22process to remove recyclable and noncombustible materials in a facility that is owned
23by a county in this state and that was in service before January 1, 1998. If the facility
24is fueled with a mixture of solid waste and fossil fuels, renewable energy calculated
25under this subdivision is the total amount of electricity derived from the facility
1multiplied by a ratio, of which the numerator is the energy content of the solid waste
2and the denominator is the energy content of the solid waste and the fossil fuels.
AB649-ASA1,79,44
196.378
(1r) (fg) 4. The combustion of a synthetic fuel or pelletized waste.
AB649-ASA1,79,76
196.378
(1r) (fm) 3. Subject to sub. (2) (b) 1g., conservation certificates that an
7electric provider elects to use in that year.
AB649-ASA1,79,109
196.378
(1r) (gm) "Renewable portfolio standard" means the requirement to
10comply with sub. (2) (a) 2.
AB649-ASA1,79,1312
196.378
(1r) (kg) "Synthetic fuel" means a fuel that is produced by the
13pyrolysis, or plasma gasification, of organic or waste material.
AB649-ASA1,80,515
196.378
(2) (a) 1. No later than June 1,
2016 2014, the commission shall
16prepare a report stating whether, by December 31,
2015
2013, the state has met a
17goal of 10 percent of all electric energy consumed in the state being renewable energy.
18No later than June 1, 2021, the commission shall prepare a report stating whether,
19by December 31, 2020, the state has met a goal of 20 percent of all electric energy
20consumed in this state being renewable energy and 6 percent of all electric energy
21consumed in this state being generated by renewable facilities located in this state.
22No later than June 1, 2026, the commission shall prepare a report stating whether,
23by December 31, 2025, the state has met a goal of 25 percent of all electric energy
24consumed in this state being renewable energy and 10 percent of all electric energy
25consumed in this state being generated by renewable facilities located in this state.
1If
the a goal
for a year has not been achieved,
the a report shall indicate why the goal
2was not achieved and how it may be achieved, and the commission shall prepare
3similar reports biennially thereafter until the goal is achieved. The commission shall
4submit reports under this subdivision to the governor and chief clerk of each house
5of the legislature for distribution to the legislature under s. 13.172 (2).
AB649-ASA1, s. 194
6Section
194. 196.378 (2) (a) 2. (intro.) of the statutes is amended to read:
AB649-ASA1,80,87
196.378
(2) (a) 2. (intro.)
Except
Subject to par. (am) and except as provided in
8pars. (e), (f), and (g):
AB649-ASA1, s. 195
9Section
195. 196.378 (2) (a) 2. c. of the statutes is amended to read:
AB649-ASA1,80,1210
196.378
(2) (a) 2. c. For the years 2011
, and 2012,
2013, and 2014, each electric
11provider may not decrease its renewable energy percentage below the electric
12provider's renewable energy percentage required under subd. 2. b.
AB649-ASA1, s. 196
13Section
196. 196.378 (2) (a) 2. d. of the statutes is amended to read:
AB649-ASA1,80,1614
196.378
(2) (a) 2. d. For the year
2015 2013, each electric provider shall increase
15its renewable energy percentage so that it is at least 6 percentage points above the
16electric provider's baseline renewable percentage.
AB649-ASA1, s. 197
17Section
197. 196.378 (2) (a) 2. e. of the statutes is amended to read:
AB649-ASA1,80,2118
196.378
(2) (a) 2. e. For
each year after the years 2014, 2015,
2016, 2017, 2018,
19and 2019, each electric provider may not decrease its renewable energy percentage
20below the electric provider's renewable energy percentage required under subd. 2.
21d.
AB649-ASA1, s. 198
22Section
198. 196.378 (2) (a) 2. f. of the statutes is created to read: