AB499-AA7,1,3
21. Page 9, line 10: after “material" insert “, including overburden and any
3other material removed from any portion of the excavation site,".
AB499-AA7,1,106
293.49
(1) (a) 2m. The technology that will be used at the proposed operation
7is capable of resulting in compliance with all applicable air, groundwater, surface
8water, and solid and hazardous waste management laws and rules of the department
9and is reasonably certain to result in compliance with these laws and rules at the
10proposed mining site.”.