Chapter NR 410
AIR PERMIT, EMISSION AND INSPECTION FEES
NR 410.01 Applicability; purpose. NR 410.03 Application and review fees. NR 410.04 Annual emission fee. NR 410.05 Asbestos abatement project permit exemption review and inspection fees. NR 410.06 Severe ozone nonattainment area major source fee.
NR 410.01(1)(1) Applicability. This chapter applies to all owners or operators of air contaminant sources and to any other person who may be required to pay a fee under s. 285.69, Stats. NR 410.01(2)(2) Purpose. The purpose of this chapter is to establish, pursuant to s. 285.69, Stats., the requirements and the procedures for the payment of application fees and emission fees by persons who are required to obtain construction or operation permits for air contaminant sources, application fees by persons who request a determination of exemption from the requirement to obtain an air pollution control permit and asbestos inspection fees by persons responsible for nonresidential asbestos demolition and renovation projects. NR 410.01 HistoryHistory: Renum. from NR 410.01 and 410.02, Register, September, 1986, No. 369, eff. 10-1-86; am. Register, October, 1991, No. 430, eff. 11-1-91; am. (2), Register, May, 1993, No. 449, eff. 6-1-93; am. (2), Register, February, 1995, No. 470, eff. 3-1-95. NR 410.02NR 410.02 Definitions. The definitions contained in ch. NR 400 apply to the terms used in this chapter. In addition, the following definitions apply to the terms used in this chapter: NR 410.02(2)(2) “Emissions offset” means the reduction of emissions from existing sources to compensate for the increase in emissions from the construction, reconstruction, replacement or modification and operation of the source which is the subject of the permit application. NR 410.02(4)(4) “Facility” means all stationary sources emitting air contaminants which belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person, or persons under common control. Emissions resulting from loading, unloading or stockpiling materials to or from vessels or vehicles while at a facility shall be considered as part of the facility’s emissions. Air contaminant sources, other than transportation related activities, shall be considered as part of the same industrial grouping if they are classified under the same 2-digit major group as described in the Standard Industrial Classification Manual, 1987, incorporated by reference in s. NR 484.05 (1). NR 410.02(5)(5) “MACT” means maximum achievable control technology for hazardous air pollutant emissions as promulgated by the EPA under section 112 (d) of the act (42 USC 7412 (d)) or established by the department under section 112 (g) of the act (42 USC 7412 (g)). NR 410.02 HistoryHistory: Cr. Register, April, 1984, No. 340, eff. 5-1-84; renum. from NR 410,03, Register, September, 1986, No. 369, eff. 10-1-86; renum. (1), (4) and (5) to be NR 400.02 (5e), (53e) and (53s), am. (3), r. (7), Register, April, 1988, No. 388, eff. 5-1-88; cr. (4), Register, May, 1993, No. 449, eff. 6-1-93; am. (intro.), Register, February, 1995, No. 470, eff. 3-1-95; cr. (5), r. and recr. (6), Register, June, 1995, No. 474, eff. 7-1-95; am. (4), Register, December, 1995, No. 480, eff. 1-1-96; am. (6), Register, December, 1996, No. 492, eff. 1-1-97; correction in (4) made under s. 13.93 (2m) (b) 7., Stats., Register, January, 2001, No. 541; CR 10-047: cr. (7), (8) Register December 2010 No. 660, eff. 1-1-11; CR 13-022: am. (3) Register March 2014 No. 699, eff. 4-1-14. NR 410.03NR 410.03 Application and review fees. NR 410.03(1)(a)(a) Each person submitting an application for an individual construction permit for a direct source, other than an individual construction permit solely to establish emission reduction credits, shall pay the applicable basic fee under this paragraph and shall submit a $10,000 initial fee with the application. The initial fee shall be subtracted from the final fee required under this section and may not be refunded, except as provided under sub. (4). If the department determines that a permit is not required, the individual permit application shall be treated as an application or request under par. (b), and the appropriate fee under par. (b) shall be charged. In the event that an applicant chooses to apply for coverage under either a general or registration construction permit, the individual permit application shall be treated as an application or request under par. (am) or (as) and the appropriate fee under par. (am) or (as) shall be charged. The basic fees are as follows: NR 410.03(1)(a)1.1. $3,600 if the application is not reviewed under ch. NR 405 or 408, and the application is for a new facility or for an emissions unit to be located at a minor source. NR 410.03 NoteNote: Subdivision 4. applies to both construction of a new facility and to construction of an emissions unit which itself constitutes a major source and is to be located at an existing facility.
NR 410.03(1)(a)8.8. $14,400 per air contaminant regulated under a plant-wide applicability limitation, when establishing a plant-wide applicability limitation under s. NR 406.035 (1). NR 410.03(1)(ac)(ac) Each person requesting an individual construction permit solely to establish emission reduction credits shall submit one of the following fees with the request: NR 410.03(1)(ae)(ae) Each person requesting a revision of a construction permit shall pay a fee of $ $2,500 submitted with the request, unless the only reason for the revision is to make the source eligible for a registration operation permit. NR 410.03(1)(am)(am) Each person applying for coverage under a general construction permit issued for a part 70 source under s. NR 406.16 shall pay a fee of $3,000 which shall be submitted with the application for coverage. NR 410.03(1)(as)(as) Each person applying for coverage under a registration construction permit issued for a part 70 source under s. NR 406.17 shall pay a fee of $1,500 which shall be submitted with the application for coverage. NR 410.03(1)(b)(b) Each person submitting a claim of, or an application for exemption, or otherwise requesting a determination of exemption under ch. NR 406 shall pay the following applicable fee which shall be submitted with the claim, application, or request: NR 410.03(1)(b)2.2. $1,800 for a determination of exemption under s. NR 406.04 (1f) for a modification to a stationary source that is regulated by a plant-wide applicability limitation, except that if a detailed air quality modeling analysis of the projected air quality impact is completed, the fee shall be $2,900. NR 410.03(1)(b)3.3. $5,500 for a determination of exemption under s. NR 406.04 (1k), except that if a detailed air quality modeling analysis of the projected air quality impact is completed, the fee shall be $6,500. NR 410.03(1)(b)3m.3m. Any person submitting a claim for a construction permit exemption under s. NR 406.04 (1q) shall pay a fee of $2,200 submitted with the claim. NR 410.03(1)(e)(e) When a construction permit application is received for a source where the basic emissions unit, that is not a portable source, is to be installed at one specified facility and, in the same application, a request is also made to issue construction permits to allow installation of the same basic emissions unit at other facilities at different locations and all the facilities for which construction permits are requested are under common ownership or control, the permit applicant shall pay the basic fee specified under par. (a) plus the additional fees under sub. (2). The fee for each additional construction permit at different locations shall be $1,200 each, plus the fees under sub. (2) except when the action specified under sub. (2) has been completed for one location and a separate action as set forth under sub. (2) is not required for each additional permit at each different location. When an action covered under sub. (2) must be completed for applications at more than one location, the fee under sub. (2) shall be charged for each time the action is completed. NR 410.03(2)(2) Additional direct source fees. Each person submitting an application for an individual construction permit, other than a construction permit solely to establish emission reduction credits, or construction permit revision for a direct source shall pay all of the following additional fees that apply: NR 410.03(2)(a)(a) $1,200 per basic emissions unit if review and analysis of 2 or more basic emissions units is required. NR 410.03(2)(c)(c) $6,000 if an emission offset under ch. NR 408 or the determination of a net emissions increase under ch. NR 405 is required. NR 410.03(2)(d)(d) $4,500, for each case-by-case determination of maximum achievable control technology (MACT), best available control technology (BACT) or lowest achievable emission rate (LAER). This does not apply to BACT or LAER determinations made under ch. NR 445. NR 410.03(2)(e)(e) $1,800 for a minor source or minor modification to a major source whose projected air quality impact requires a detailed air quality modeling analysis. NR 410.03(2)(f)(f) $5,400 for any source, other than a minor source or minor modification to a major source, whose projected air quality impact requires a detailed air quality modeling analysis. NR 410.03(2)(g)(g) $1,200 if the source is subject to an emission limitation under chs. NR 446 to 469, or if the permit establishes an emission limit for a hazardous air contaminant listed in Table A, B or C of s. NR 445.07. NR 410.03(2)(h)(h) If the construction permit requires emission testing, $3,000 for the first air contaminant tested and $1,500 for each additional air contaminant tested up to a maximum of $7,200. If the department later finds that some or all of the tests are not required, the corresponding fees shall be refunded.
/code/admin_code/nr/400/410
true
administrativecode
/code/admin_code/nr/400/410
Department of Natural Resources (NR)
Chs. NR 400-499; Environmental Protection – Air Pollution Control
administrativecode/ch. NR 410
administrativecode/ch. NR 410
section
true