NR 419.045(3)(b)3. 3. Before implementing the option available under this paragraph, the owner or operator provides written notice of the intent to utilize this option to the department.
NR 419.045(4) (4) Inspection and monitoring. The owner or operator of a waste management unit that is subject to requirements under sub. (2) or (3) shall comply with the following inspection and monitoring requirements, except that an owner and operator subject to and in compliance with a subpart in 40 CFR part 63 as provided in sub. (3) (b), may comply with the inspection, monitoring, and record keeping requirements of that subpart instead of the requirements of this subsection.
NR 419.045(4)(a) (a) All seals, covers, closed vent systems, and other equipment used to comply with sub. (2) or (3) shall be visually inspected for leaks and improper conditions semiannually and upon repair as specified in this paragraph. If any seal, cover, closed vent system, or other equipment is found to have a leak or be in improper condition, the equipment shall be repaired as soon as possible, but no later than 15 calendar days after detection, unless the repair or correction is technically infeasible without requiring a process unit shutdown, in which case the repair or correction shall be made during the next process unit shutdown.
NR 419.045(4)(a)1. 1. For a wastewater tank equipped with a fixed roof and vapor control system, visually inspect the fixed roof, openings, and the closed vent system for leaks, except for a cover and closed vent system maintained under negative pressure, and take corrective action.
NR 419.045(4)(a)2. 2. For a wastewater tank equipped with an internal or external floating roof, visually inspect for and correct the following improper conditions:
NR 419.045(4)(a)2.a. a. An access door or other opening is left open when not in use.
NR 419.045(4)(a)2.b. b. The floating roof is not resting on either the surface of the liquid or on the leg supports.
NR 419.045(4)(a)2.c. c. There is stored liquid on the floating roof.
NR 419.045(4)(a)2.d. d. A rim seal is detached from the floating roof.
NR 419.045(4)(a)2.e. e. There are holes, tears, cracks, or gaps in the rim seal or seal fabric of the floating roof.
NR 419.045(4)(a)2.f. f. There are visible gaps between the seal of an internal floating roof and the wall of the wastewater tank.
NR 419.045(4)(a)2.g. g. Where a metallic shoe seal is used on an external floating roof, one end of the metallic shoe does not extend into the stored liquid or one end of the metallic shoe does not extend a minimum vertical distance of 61 centimeters above the surface of the stored liquid.
NR 419.045(4)(a)2.h. h. A gasket, joint, lid, cover, or door has a crack or gap, or is broken.
NR 419.045(4)(a)3. 3. For a surface impoundment, visually inspect the cover and all openings for leaks, except for a cover and closed vent system maintained under negative pressure, and take corrective action.
NR 419.045(4)(a)4. 4. For a surface impoundment, visually inspect for and correct the following improper conditions:
NR 419.045(4)(a)4.a. a. An access hatch or other opening is left open when not in use.
NR 419.045(4)(a)4.b. b. A joint, lid, cover, or door has a crack or gap, or is broken.
NR 419.045(4)(a)5. 5. For a portable container, visually inspect the cover and all openings for leaks and take corrective action.
NR 419.045(4)(a)6. 6. For a portable container that is located within an enclosure that is vented by means of a closed vent system to a control device, visually inspect the enclosure and closed vent system for leaks, except for an enclosure and closed vent system maintained under negative pressure, and take corrective action.
NR 419.045(4)(a)7. 7. For a portable container, visually inspect for and correct the following improper conditions:
NR 419.045(4)(a)7.a. a. An access hatch or other opening is left open when not in use.
NR 419.045(4)(a)7.b. b. A cover or door has a gap or crack, or is broken.
NR 419.045(4)(a)8. 8. For an individual drain system, visually inspect for and correct the following improper conditions:
NR 419.045(4)(a)8.a. a. A joint, lid, cover, or door has a gap, crack, or hole or is broken.
NR 419.045(4)(a)8.b. b. An access hatch or other opening is left open when not in use for sampling or removal, or for equipment inspection, maintenance, or repair.
NR 419.045(4)(a)8.c. c. Sufficient water is not present to properly maintain integrity of water seals.
NR 419.045(4)(a)8.d. d. Drains using tightly-fitted caps or plugs have caps and plugs that are not in place or not properly installed.
NR 419.045(4)(a)8.e. e. Junction boxes do not have covers in place or covers have visible gaps, cracks, or holes.
NR 419.045(4)(a)8.f. f. Unburied portion of sewer lines have cracks or gaps.
NR 419.045(4)(a)9. 9. For a junction box vented to a process or through a closed vent system to a control device, visually inspect for and correct leaks in the closed vent system.
NR 419.045(4)(a)10. 10. For oil-water separators, visually inspect fixed roof and all openings for leaks and take corrective action.
NR 419.045(4)(a)11. 11. For oil-water separators, visually inspect for and correct the following improper conditions:
NR 419.045(4)(a)11.a. a. An access door of other opening is left open when not in use, or not equipping the door or opening with a gasket.
NR 419.045(4)(a)11.b. b. The floating roof is not resting on either the surface of the liquid or on the leg supports.
NR 419.045(4)(a)11.c. c. There is stored liquid on the floating roof.
NR 419.045(4)(a)11.d. d. A rim seal is detached from the floating roof.
NR 419.045(4)(a)11.e. e. There are holes, tears, or other open spaces in the rim seal or seal fabric of the floating roof.
NR 419.045(4)(a)11.f. f. A gasket, joint, lid, cover, or door has a gap or crack, or is broken.
NR 419.045(4)(b) (b) For a wastewater tank or oil-water separator equipped with an external floating roof having primary and secondary seals used to comply with sub. (2) or (3), the secondary seal shall be inspected for seal gaps and repaired as follows:
NR 419.045(4)(b)1. 1. The secondary seal shall be measured for seal gaps annually and after repair as follows:
NR 419.045(4)(b)1.a. a. The width of any seal gap is the distance between the seal and the tank wall and shall be determined by using probes of various widths to accurately measure the actual distance from the seal to the tank wall.
NR 419.045(4)(b)1.b. b. The area of any seal gap shall be determined by multiplying the width of the seal gap, as determined in subd. 1. a., by the circumferential length of the gap.
NR 419.045(4)(b)1.c. c. The total seal gap area is the accumulated area of all gaps which are greater than 0.125 inch in width.
NR 419.045(4)(b)2. 2. The accumulated area of gaps that exceed 0.125 inch in width between the secondary seal and tank wall may not exceed 1.0 square inch per foot (21 square centimeters per meter) of tank diameter.
NR 419.045(4)(b)3. 3. If the seal gap requirement of subd. 2. is not being met, the secondary seal shall be repaired or replaced within 45 days after detection of the improper seal gap unless the repair or correction is technically infeasible without requiring a process unit shutdown, in which case the repair or correction shall be made at the next process unit shutdown.
NR 419.045(4)(c) (c) The following records shall be maintained on leaks, improper conditions, and improper seal gaps:
NR 419.045(4)(c)1. 1. The date on which a leak, improper condition, or improper seal gap is discovered.
NR 419.045(4)(c)2. 2. The date on which a first attempt at repair was made to correct the leak or improper condition.
NR 419.045(4)(c)3. 3. The date on which a leak, improper condition, or improper seal gap is repaired.
NR 419.045(4)(d)1.1. Monitors shall be installed and maintained to measure operational parameters of any emission control device or other device installed to comply with sub. (2) or (3). Monitoring parameters shall be sufficient to demonstrate proper functioning of the devices to design specifications. Except as provided in subd. 2., the following monitoring and data recording shall be performed as applicable:
NR 419.045(4)(d)1.a. a. For an enclosed non-catalytic combustion device, continuously monitor and record the temperature of the gas stream either in the combustion chamber or immediately downstream before any substantial heat exchange.
NR 419.045(4)(d)1.b. b. For a catalytic incinerator, continuously monitor and record the temperature of the gas stream immediately before and after the catalyst bed.
NR 419.045(4)(d)1.c. c. For a condenser, continuously monitor and record the temperature of the gas stream at the condenser exit.
NR 419.045(4)(d)1.d. d. For a carbon adsorber, continuously monitor and record the VOC concentration of exhaust gas stream to determine if breakthrough has occurred. If the carbon adsorber does not regenerate the carbon bed directly in the control device, that is, a carbon canister is used, the exhaust gas stream shall be monitored daily or at intervals no greater than 20% of the design replacement interval, whichever is greater. As an alternative to conducting daily monitoring, the carbon may be replaced with fresh carbon at a regular predetermined time interval that is less than the carbon replacement interval that is determined by the maximum design flow rate and the VOC concentration in the gas stream vented to the carbon adsorber.
NR 419.045(4)(d)1.e. e. For a flare, meet the requirements specified in 40 CFR 60.18 (b).
NR 419.045(4)(d)1.f. f. For a steam stripper, continuously monitor and record the steam flow rate, the wastewater feed mass flow rate, and either the wastewater feed temperature, or the column operating temperature as measured in the column top tray liquid phase at the downcomer.
NR 419.045(4)(d)1.g. g. For vapor control systems other than those specified in subds. 1. a. to f., continuously monitor and record the appropriate operating parameters.
NR 419.045(4)(d)2. 2. In lieu of the monitoring in subd. 1., other monitoring may be approved or required by the department with written concurrence from EPA.
NR 419.045(4)(e) (e) For a closed-vent system that is used to comply with sub. (2) or (3), and that is designed to operate at a pressure below atmospheric pressure, the closed-vent system shall be equipped with at least one pressure gauge or other pressure measurement device that can be read from a readily accessible location to verify that negative pressure is being maintained in the closed-vent system when the control device is operating.
NR 419.045(5) (5) Approved test methods. Compliance with the emission specifications, vapor control system efficiency, and certain control requirements, inspection requirements, and exemption criteria of subs. (1) (b) and (2) to (4), relating to control requirements, alternate control requirements, inspection and monitoring requirements, and exemptions, shall be determined by applying one or more of the test methods and procedures, as appropriate, in this subsection. Minor modifications to test methods and procedures may be used, if approved by the department with written concurrence from EPA. Test methods other than those specified in this subsection may be used if validated by Method 301 in 40 CFR part 63, Appendix A, incorporated by reference in s. NR 484.04 (25). The test methods are:
NR 419.045(5)(a) (a) Methods 1, 2, 3 and 4, in 40 CFR part 60, Appendix A, incorporated by reference in s. NR 484.04 (13), for determining gas flow rates, as necessary.
NR 419.045(5)(b) (b) Methods 18, 25, 25A, or 25B in 40 CFR part 60, Appendix A, incorporated by reference in s. NR 484.04 (13), for determining organic compound emission concentrations or emission rates.
NR 419.045(5)(c)1.1. For control devices other than flares, the VOC control efficiency shall be determined in accordance with s. NR 439.07, where the flow rate and VOC concentration of the inlet and outlet gas streams of the control device are measured as specified under pars. (a) and (b).
NR 419.045(5)(c)2. 2. For flares, the performance test requirements of 40 CFR 60.18 (b) shall apply. Compliance with the requirements of 40 CFR 60.18 (b) will be considered to represent 98% control of the VOC in the flare inlet.
NR 419.045(5)(d) (d) ASTM D323-08, D2879-10, D4953-06, D5190-07, or D5191-10b, adjusted for actual storage temperature in accordance with American Petroleum Institute publication 2517, incorporated by reference in s. NR 484.11 (5), for the measurement of vapor pressure. The ASTM methods are incorporated by reference in s. NR 484.10 (6), (39m), (55b), (55bg), and (55br), respectively.
NR 419.045(5)(e) (e) Method 21 in 40 CFR part 60, Appendix A, incorporated by reference in s. NR 484.04 (17), for monitoring a carbon canister in accordance with sub. (4) (d) 1. d.
NR 419.045(5)(f) (f) For determining the VOC concentration of wastewater samples, any of the methods in subds. 1. to 6., except that in the event of any conflicts, subd. 6. shall take precedence.
NR 419.045(5)(f)1. 1. Method 5030B followed by Method 8015C with a DB-5 boiling point (or equivalent column), and flame ionization detector, with the detector calibrated with benzene as required by 40 CFR part 261. Methods 5030B and 8015C are published in EPA Publication SW-846 “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods", incorporated by reference in s. NR 484.06 (4) (e).
NR 419.045(5)(f)2. 2. Methods 5021A, 5030B followed by 8021B, 8260B, and 9060A as required by 40 CFR part 261, as published in EPA Publication SW-846 “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods", incorporated by reference in s. NR 484.06 (4) (e).
NR 419.045(5)(f)3. 3. Methods 602, 624, 625, 1624B, 1625B of 40 CFR part 136, Appendix A, incorporated by reference in s. NR 484.04 (27s)
NR 419.045(5)(f)4. 4. Method 305 of 40 CFR part 63, Appendix A, incorporated by reference in s. NR 484.04 (25).
NR 419.045(5)(f)5. 5. Method 5310(B) in Standard Methods for the Examination of Water and Wastewater, 20th Edition, 1998, incorporated by reference in s. NR 484.11 (12).
NR 419.045(5)(f)6. 6. Method 25D in 40 CFR part 60, Appendix A, incorporated by reference in s. NR 484.04 (20e). In the event of any conflict, Method 25D takes precedence.
NR 419.045(5)(g) (g) The measurement of wastewater flow rate shall be determined with flow measurement devices. Flow rate measurements shall be taken at the same time as the concentration measurements.
NR 419.045(6) (6) Compliance schedule. The owner or operator of any facility subject to this section shall do all of the following:
NR 419.045(6)(a) (a) Notify the department's bureau of air management in writing by April 1, 2012 that the facility is subject to the requirements of this section. The notification shall provide the name and location of the affected facility.
NR 419.045(6)(b) (b) Achieve final compliance with the requirements of this section no later than February 1, 2013.
NR 419.045(7) (7) Recordkeeping. The owner or operator of a facility subject to this section shall do all of the following:
NR 419.045(7)(a) (a) Maintain complete and up-to-date records needed to demonstrate compliance with sub. (2) or (3) which are sufficient to demonstrate the characteristics of wastewater streams and the qualification for any exemptions claimed under sub. (1) (b).
NR 419.045(7)(b) (b) Maintain records of the results of any inspection or monitoring conducted in accordance with sub. (4). Records shall be sufficient to demonstrate proper functioning of applicable control equipment to design specifications to ensure compliance with sub. (2) or (3).
NR 419.045(7)(c) (c) Maintain records of the results of any testing conducted in accordance with sub. (5).
NR 419.045(7)(d) (d) Maintain all records at the facility for at least 5 years and make all records available upon request to EPA and the department.
NR 419.045(8) (8) Determination of wastewater characteristics. The determination of the characteristics of a wastewater stream for purposes of this section shall be made as follows:
NR 419.045(8)(a) (a) The characteristics shall be determined at a location between the point where the process wastewater exits a process unit and before the process wastewater is exposed to the atmosphere, treated for VOC removal, or mixed with another wastewater stream. For wastewater streams at a facility meeting the applicability requirements under sub. (1) (a) 1. and 2. and which, prior to February 1, 2012, were either actually being mixed, or construction had commenced which would result in the wastewater streams being mixed, the mixing does not establish a limit on where the characteristics may be determined.
NR 419.045(8)(b) (b) The flow rate of a wastewater stream shall be determined on the basis of an annual average by one of the following methods:
NR 419.045(8)(b)1. 1. The highest annual quantity of wastewater managed, based on historical records for the most recent 5 years of operation, or for the entire time the wastewater stream has existed if less than five years, but at least one year.
NR 419.045(8)(b)2. 2. The maximum design capacity of the waste management unit.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.