NR 463.09(4)(d)1.
1. Locate a velocity traverse port in a section of straight duct that connects the hooding on the plating tank or tanks with the control device. The port shall be located as close to the control system as possible, and shall be placed a minimum of 2 duct diameters downstream and 0.5 diameter upstream of any flow disturbance such as a bend, expansion or contraction (see Method 1 in Appendix A of
40 CFR part 60, incorporated by reference in
s. NR 484.04). If 2.5 diameters of straight duct work does not exist, locate the port 0.8 of the distance between flow disturbances downstream and 0.2 of the distance between flow disturbances upstream from the respective flow disturbances.
NR 463.09(4)(d)2.
2. A 12-point velocity traverse of the duct to the control device shall be conducted along a single axis according to Method 2 in Appendix A of
40 CFR part 60, incorporated by reference in
s. NR 484.04, using an S-type pitot tube; measurement of the barometric pressure and duct temperature at each traverse point is not required, but is suggested. Mark the S-type pitot tube as specified in Method 1 in Appendix A of
40 CFR part 60, incorporated by reference in
s. NR 484.04, with 12 points. Measure the velocity pressure (
Dp) values for the velocity points and record. Determine the square root of the individual velocity point
Dp values and average. The point with the square root value that comes closest to the average square root value is the point of average velocity. The
Dp value measured for this point during the performance test shall be used as the reference for future monitoring.
NR 463.09(4)(e)
(e) The owner or operator of a source required to measure the pressure drop across the add-on air pollution control device in accordance with
s. NR 463.07 (1) to
(4) may establish the pressure drop in accordance with the following guidelines:
NR 463.09(4)(e)1.
1. Pressure taps shall be installed at any of the following locations:
NR 463.09(4)(e)1.a.
a. At the inlet and outlet of the control system. In this case the inlet tap would be installed in the ductwork just prior to the control device and the corresponding outlet pressure tap would be installed on the outlet side of the control device prior to the blower or on the downstream side of the blower.
NR 463.09(4)(e)1.b.
b. On each side of the packed bed within the control system or on each side of each mesh pad within the control system.
NR 463.09(4)(e)1.c.
c. On the front side of the first mesh pad and back side of the last mesh pad within the control system.
NR 463.09(4)(e)2.a.
a. As free from pluggage as possible and away from any flow disturbances such as cyclonic demisters.
NR 463.09(4)(e)2.b.
b. Situated such that no air infiltration at the measurement site will occur that could bias the measurement.
NR 463.09(4)(e)3.
3. Pressure taps shall be constructed of either polyethylene, polybutylene or other nonreactive materials.
NR 463.09(4)(e)4.
4. Nonreactive plastic tubing shall be used to connect the pressure taps to the device used to measure pressure drop.
NR 463.09(4)(e)5.
5. Any of the following pressure gauges may be used to monitor pressure drop: a magnehelic gauge, an inclined manometer or a “U" tube manometer.
NR 463.09(4)(e)6.
6. Prior to connecting any pressure lines to the pressure gauges, each gauge shall be zeroed. No calibration of the pressure gauges is required.
NR 463.09(5)
(5) Special compliance provisions for multiple sources controlled by a common add-on air pollution control device. NR 463.09(5)(a)(a) This subsection identifies procedures for measuring the outlet chromium concentration from an add-on air pollution control device that is used to control multiple sources that may or may not include sources not affected by this subchapter.
NR 463.09(5)(b)
(b) When multiple affected sources performing the same type of operation (for example, all are performing hard chromium electroplating), and subject to the same emission limitation, are controlled with an add-on air pollution control device that is not controlling emissions from any other type of affected operation or from any sources not affected by this subchapter, the applicable emission limitation identified in
s. NR 463.04 shall be met at the outlet of the add-on air pollution control device.
NR 463.09(5)(c)
(c) When multiple affected sources performing the same type of operation and subject to the same emission limitation are controlled with a common add-on air pollution control device that is also controlling emissions from sources not affected by this subchapter, the following procedures shall be followed to determine compliance with the applicable emission limitation in
s. NR 463.04:
NR 463.09(5)(c)1.
1. Calculate the cross-sectional area of each inlet duct (uptakes from each hood) including those not affected by this subchapter.
NR 463.09(5)(c)2.
2. Determine the total sample time per test run by dividing the total inlet area from all tanks connected to the control system by the total inlet area for all ducts associated with affected sources, and then multiply this number by 2 hours. The calculated time is the minimum sample time required per test run.
NR 463.09(5)(c)4.
4. Determine the total ventilation rate from the affected sources by using equation 1:
where VRtot is the average total ventilation rate in dscm/min for the 3 test runs as determined at the outlet by means of the Method 306 testing; IDAi is the total inlet area for all ducts associated with affected sources; IAtotal is the sum of all inlet duct areas from both affected sources and sources not affected by this subchapter; and VRinlet is the total ventilation rate from all inlet ducts associated with affected sources.
NR 463.09(5)(c)5.
5. Establish the allowable mass emission rate of the system (AMR
sys) in milligrams of total chromium per hour (mg/hr) using equation 2:
where
S VR
inlet is the total ventilation rate in dscm/min from the affected sources, and EL is the applicable emission limitation from
s. NR 463.04 in mg/dscm. The allowable mass emission rate (AMR
sys) calculated from equation 2 shall be equal to or more than the outlet 3-run average mass emission rate determined from Method 306 testing in order for the source to be in compliance with the standard.
NR 463.09(5)(d)
(d) When multiple affected sources performing different types of operations (for example, hard chromium electroplating, decorative chromium electroplating or chromium anodizing) are controlled by a common add-on air pollution control device that may or may not also be controlling emissions from sources not affected by this subchapter, or if the affected sources controlled by the common add-on air pollution control device perform the same operation but are subject to different emission limitations (for example, because one is a new hard chromium plating tank and one is an existing small, hard chromium plating tank), the following procedures shall be followed to determine compliance with the applicable emission limitation in
s. NR 463.04:
NR 463.09(5)(d)2.
2. Determine the total ventilation rate for each type of affected source using equation 3:
where VRtot is the average total ventilation rate in dscm/min for the 3 test runs as determined at the outlet by means of the Method 306 testing; IDAi,a is the total inlet duct area for all ducts conveying chromic acid from each type of affected source performing the same operation, or each type of affected source subject to the same emission limitation; IAtotal is the sum of all duct areas from both affected sources and sources not affected by this subchapter; and VRinlet,a is the total ventilation rate from all inlet ducts conveying chromic acid from each type of affected source performing the same operation, or each type of affected source subject to the same emission limitation.
NR 463.09(5)(d)3.
3. Establish the allowable mass emission rate in mg/hr for each type of affected source that is controlled by the add-on air pollution control device using equation 4, 5, 6 or 7 as appropriate:
where “hc" applies to the total of ventilation rates for all hard chromium electroplating tanks subject to the same emission limitation, “dc" applies to the total of ventilation rates for the decorative chromium electroplating tanks, “ca" applies to the total of ventilation rates for the chromium anodizing tanks, and EL is the applicable emission limitation from
s. NR 463.04 in mg/dscm. There are 2 equations for hard chromium electroplating tanks because different emission limitations may apply (for example, a new tank versus an existing, small tank).
NR 463.09(5)(d)4.
4. Establish the allowable mass emission rate (AMR) in mg/hr for the system using equation 8, including each type of affected source as appropriate:
The allowable mass emission rate calculated from equation 8 shall be equal to or more than the outlet 3-run average mass emission rate determined from Method 306 testing in order for the source to be in compliance with the standards in
s. NR 463.04.
NR 463.09(5)(e)
(e) Each owner or operator that uses the special compliance provisions of this subsection to demonstrate compliance with the emission limitations of
s. NR 463.04 shall submit the measurements and calculations to support these compliance methods with the notification of compliance status required by
s. NR 463.106 (5).
NR 463.09(5)(f)
(f) Each owner or operator that uses the special compliance provisions of this subsection to demonstrate compliance with the emission limitations of
s. NR 463.04 shall repeat these procedures if a tank is added or removed from the control system regardless of whether that tank is not an affected source. If neither the new tank nor the existing tank is an affected source and the new tank replaces an existing tank of the same size and is connected to the control system through the same size inlet duct, then this procedure does not have to be repeated.
NR 463.09(6)
(6) Compliance provisions for mass rate emission standard for enclosed hard chromium electroplating tanks. NR 463.09(6)(a)(a) This subsection identifies procedures for calculating the maximum allowable mass emission rate for owners or operators of affected sources who choose to meet the mass emission rate standard in
s. NR 463.04 (3) (b) 4. or
5.
NR 463.09(6)(b)
(b) The owner or operator of an enclosed hard chromium electroplating tank that is an affected source other than an existing affected source located at a small hard chromium electroplating facility who chooses to meet the mass emission rate standard in
s. NR 463.04 (3) (b) 4. shall determine compliance by not allowing the mass rate of total chromium in the exhaust gas stream discharged to the atmosphere to exceed the maximum allowable mass emission rate calculated using equation 9:
MAMER = ETSA x K x 0.015 mg/dscm Equation (9)
where:
MAMER is the alternative emission rate for enclosed hard chromium electroplating tanks in mg/hr
ETSA is the hard chromium electroplating tank surface area in square feet (ft2)
K is the conversion factor, 425 dscm/(ft2 x hr)
NR 463.09(6)(c)
(c) Compliance with the alternative mass emission limit in
s. NR 463.04 (3) (b) 4. is demonstrated if the 3-run average mass emission rate determined from Method 306 in Appendix A of
40 CFR part 63, incorporated by reference in
s. NR 484.04 (25), testing is less than or equal to the maximum allowable mass emission rate calculated from equation 9 in
par. (b).
NR 463.09(6)(d)
(d) The owner or operator of an enclosed hard chromium electroplating tank that is an existing affected source located at a small hard chromium electroplating facility who chooses to meet the mass emission rate standard in
s. NR 463.04 (3) (b) 5. shall determine compliance by not allowing the mass rate of total chromium in the exhaust gas stream discharged to the atmosphere to exceed the maximum allowable mass emission rate calculated using equation 10:
MAMER = ETSA x K x 0.03 mg/dscm Equation (10)
where:
MAMER is the alternative emission rate for enclosed hard chromium electroplating tanks in mg/hr
ETSA is the hard chromium electroplating tank surface area in square feet (ft2)
K is the conversion factor, 425 dscm/(ft2 x hr)
NR 463.09(6)(e)
(e) Compliance with the alternative mass emission limit in
s. NR 463.04 (3) (b) 5. is demonstrated if the 3-run average mass emission rate determined from Method 306 in Appendix A of
40 CFR part 63, incorporated by reference in
s. NR 484.04 (25), testing is less than or equal to the maximum allowable mass emission rate calculated from equation 10 in
par. (d).
NR 463.09 History
History: Cr.
Register, September, 1997, No. 501, eff. 10-1-97;
CR 05-039: am. (5) (e), cr. (6)
Register February 2006 No. 602, eff. 3-1-06;
CR 04-023: am. (2) (a) (intro.), (3) (intro.), (a), (5) (a), (b), (c) (intro.), 1., 4., (d) (intro.) and 2.
Register December 2008 No. 636, eff. 1-1-09.
NR 463.10
NR 463.10 Preconstruction review requirements for new and reconstructed sources. NR 463.10(1)
(1)
New or reconstructed affected sources. The owner or operator of a new or reconstructed affected source which is exempt from the permit requirements of
chs. NR 406 and
407 is subject to this section.
NR 463.10(1)(a)
(a) No person may construct a new affected source or reconstruct an affected source subject to this subchapter, or reconstruct a source such that it becomes an affected source subject to this subchapter, without either meeting the permit application and approval requirements under
ch. NR 406 or
407, if applicable, or submitting a notification of construction or reconstruction to the department under this section. Notification under this section shall contain the information identified in
pars. (b) and
(c), as appropriate.
NR 463.10(1)(b)
(b) The notification of construction or reconstruction required under this subsection shall include all of the following:
NR 463.10(1)(b)2.
2. The address or proposed address where the affected source would be located, if different from the owner's or operator's.
NR 463.10(1)(b)3.
3. A notification of intention to construct a new affected source or make any physical or operational changes to an affected source that may meet or has been determined to meet the criteria for a reconstruction as defined in
s. NR 460.02 (32).
NR 463.10(1)(b)4.
4. An identification of this subchapter as the basis for the notification.
NR 463.10(1)(b)5.
5. The expected commencement and completion dates of the construction or reconstruction.
NR 463.10(1)(b)7.
7. The type of process operation to be performed, hard or decorative chromium electroplating or chromium anodizing.
NR 463.10(1)(b)8.
8. A description of the air pollution control technique to be used to control emissions from the affected source, such as preliminary design drawings and design capacity if an add-on air pollution control device is used.
NR 463.10(1)(b)9.
9. An estimate of emissions from the source based on engineering calculations and vendor information on control device efficiency, expressed in units consistent with the emission limits of this subchapter. Calculations of emission estimates shall be in sufficient detail to permit assessment of the validity of the calculations.
NR 463.10(1)(c)
(c) If a reconstruction is to occur, the notification required under this subsection shall include the following in addition to the information required in
par. (b):
NR 463.10(1)(c)1.
1. A brief description of the affected source and the components to be replaced.
NR 463.10(1)(c)2.
2. A brief description of the present and proposed emission control technique, including the information required by
par. (b) 8. and
9.
NR 463.10(1)(c)3.
3. An estimate of the fixed capital cost of the replacements and of constructing a comparable entirely new source.
NR 463.10(1)(c)4.
4. The estimated life of the affected source after the replacements.
NR 463.10(1)(c)5.
5. A discussion of any economic or technical limitations the source may have in complying with relevant standards or other requirements after the proposed replacements. The discussion shall be sufficiently detailed to demonstrate to the department's satisfaction that the technical or economic limitations affect the source's ability to comply with the relevant standard and how they do so.
NR 463.10(1)(c)6.
6. If in the notification of reconstruction, the owner or operator designates the affected source as a reconstructed source and declares that there are no economic or technical limitations to prevent the source from complying with all relevant standards or requirements, the owner or operator need not submit the information required in
subds. 3. to
5.
NR 463.10(1)(d)
(d) The owner or operator of a new or reconstructed affected source that submits a notification under this subsection is not subject to approval by the department under this subchapter. Construction or reconstruction is subject only to notification and may begin upon submission of a complete notification. This paragraph applies only to affected sources which are exempt from permit requirements under
chs. NR 406 and
407.
NR 463.10(2)
(2) Submittal timeframes. After October 1, 1997, an owner or operator of a new or reconstructed affected source shall submit the notification of construction or reconstruction required by
sub. (1) according to the following schedule:
NR 463.10(2)(a)
(a) If construction or reconstruction commences after October 1, 1997, the notification shall be submitted as soon as practicable before the construction or reconstruction is planned to commence.
NR 463.10(2)(b)
(b) If the construction or reconstruction had commenced and initial startup had not occurred before October 1, 1997, the notification shall be submitted as soon as practicable before startup but no later than 60 days after October 1, 1997.
NR 463.10 History
History: Cr.
Register, September, 1997, No. 501, eff. 10-1-97;
CR 04-023: am. (1) (a), (b) 4., 9. and (d)
Register December 2008 No. 636, eff. 1-1-09.
NR 463.103(1)
(1) The owner or operator of each affected source subject to this subchapter shall fulfill all recordkeeping requirements outlined in this section and in the general provisions of
ch. NR 460, according to the applicability of
ch. NR 460 as identified in
ch. NR 460 Appendix N.
NR 463.103(2)
(2) The owner or operator of an affected source subject to this subchapter shall maintain all of the following records for the source:
NR 463.103(2)(a)
(a) Inspection records for the add-on air pollution control device, if such a device is used, and monitoring equipment, to document that the inspection and maintenance required by the work practice standards of
s. NR 463.05 and Table 1 of this subchapter have taken place. The record may take the form of a checklist and shall identify the device inspected, the date of inspection, a brief description of the working condition of the device during the inspection, and any actions taken to correct deficiencies found during the inspection.