Chapter SPS 325
PLUMBING
SPS 325.01   Plumbing Standard.
SPS 325.02   Sanitation facilities and devices.

Ch. SPS 325 NoteNote: Chapter Ind 25 was renumbered to be chapter ILHR 25, Register, February, 1985, No. 350, eff. 3-1-85; ch. ILHR 25 as it existed on February 29, 1992, was repealed and a new chapter ILHR 25 was created effective March 1, 1992. Chapter ILHR 25 was renumbered to be chapter Comm 25 under s. 13.93 (2m) (b) 1., Stats., and corrections made under s. 13.93 (2m) (b) 7., Stats., Register, January, 1999, No. 517, eff. 2-1-99. Chapter Comm 25 was renumbered chapter SPS 325 under s. 13.92 (4) (b) 1., Stats., Register December 2011 No. 672.
SPS 325.01SPS 325.01Plumbing Standard. All plumbing design, construction, installation, materials, and inspection used in the construction of one- and 2-family dwellings shall comply with the requirements of the Wisconsin Plumbing Code, chs. SPS 381 to 387.
SPS 325.01 HistoryHistory: Cr. Register, March, 1992, No. 435, eff. 4-1-92; am., Register, November, 1995, No. 479, eff. 12-1-95; correction made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672; CR 15-041: renum. 325.01 to 325.01 (1) and am., cr. (1) (title), (2) to (4) Register December 2015 No. 720, eff. 1-1-16; CR 26-019: r. and recr. Register June 2026 No. 846, eff. 9-1-26.
SPS 325.02SPS 325.02Sanitation facilities and devices. The design, construction, installation and maintenance of sanitation facilities and devices such as composting toilets, incinerating toilets and privies to serve one- and 2-family dwellings shall comply with the requirements of ch. SPS 391.
SPS 325.02 HistoryHistory: Cr. Register, April, 2000, No. 532, eff. 7-1-00; correction made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.