TCS 5.04(2)(g) (g) A conceptual sketch of the proposed additional or new facilities.
TCS 5.04(2)(h) (h) The estimated project cost by the following categories:
TCS 5.04(2)(h)1. 1. General construction
TCS 5.04(2)(h)2. 2. Heating, ventilating and air-conditioning
TCS 5.04(2)(h)3. 3. Electrical
TCS 5.04(2)(h)4. 4. Plumbing
TCS 5.04(2)(h)5. 5. Other contracts
TCS 5.04(2)(h)6. 6. Equipment, both fixed and movable
TCS 5.04(2)(h)7. 7. Miscellaneous costs
TCS 5.04(2)(i) (i) A copy of the district energy study analysis indicating compliance with s. 1.12, Stats.
TCS 5.04(3) (3)Rentals. Except as provided under s. TCS 5.09 (2), a district board shall submit the following information relative to proposals for rentals for evaluation by the board:
TCS 5.04(3)(a) (a) A resolution of the district board approving the lease contingent upon board approval.
TCS 5.04(3)(c) (c) A copy of the proposed lease as reviewed by the district's legal counsel.
TCS 5.04(3)(d) (d) A report relating programmatic and student requirements, and the needs of business and industry, to the need for the rental. The report shall include data indicating the need for the rental based upon:
TCS 5.04(3)(d)1. 1. An analysis of the needs of business and industry for persons with new skills and persons with updated skills.
TCS 5.04(3)(d)3. 3. An analysis of available student stations, and the need for additional student stations, including a consideration of the needs of persons with handicaps.
TCS 5.04(3)(d)4. 4. Relevant program trend data for the district, including enrollment and placement data as available.
TCS 5.04(3)(e) (e) An analysis of the fiscal impact of the rental on the district's budget, including the availability and specific source of funds as required under s. TCS 5.05.
TCS 5.04(4) (4)Remodeling. Except as provided under s. TCS 5.09 (1), a district board shall submit the following data relative to proposals for remodeling existing facilities for evaluation by the board:
TCS 5.04(4)(a) (a) A resolution of the district board approving the remodeling of existing facilities.
TCS 5.04(4)(c) (c) Evidence of compliance with s. 1.11, Stats.
TCS 5.04(4)(d) (d) A report relating programmatic and student requirements, and the needs of business and industry, to the need for remodeling of existing facilities. The report shall include data indicating the need for remodeling of existing facilities based upon:
TCS 5.04(4)(d)1. 1. An analysis of the needs of business and industry for persons with new skills and persons with updated skills.
TCS 5.04(4)(d)3. 3. An analysis of available student stations, and the need for additional student stations, including a consideration of the needs of persons with handicaps.
TCS 5.04(4)(d)4. 4. Relevant program trend data for the district, including enrollment and placement data as available.
TCS 5.04(4)(e) (e) Educational specifications relating specific space requirements for approved programs to the need for remodeling of existing facilities.
TCS 5.04(4)(f) (f) An analysis of the fiscal impact of the remodeling of existing facilities on the district's budget, including the availability and specific source of funds as required under s. TCS 5.05.
TCS 5.04(4)(g) (g) A conceptual sketch of the remodeling.
TCS 5.04(4)(h) (h) The estimated project cost by the following categories:
TCS 5.04(4)(h)1. 1. General construction
TCS 5.04(4)(h)2. 2. Heating, ventilating and air-conditioning
TCS 5.04(4)(h)3. 3. Electrical
TCS 5.04(4)(h)4. 4. Plumbing
TCS 5.04(4)(h)5. 5. Other contracts
TCS 5.04(4)(h)6. 6. Equipment, both fixed and movable
TCS 5.04(4)(h)7. 7. Miscellaneous costs
TCS 5.04(4)(i) (i) A copy of the district energy study analysis indicating compliance with s. 1.12, Stats.
TCS 5.04 History History: Cr. Register, November, 1983, No. 335, eff. 12-1-83; am. (2) (f), (3) (e) and (4) (f), Register, September, 1985, No. 357, eff. 10-1-85; am. (3) (intro) and (4) (intro), Register, July, 1986, No. 367, eff. 8-1-86; corrections made under s. 13.93 (2m) (b) 7., Stats., Register, June, 1994, No. 462; CR 13-050: r. (1) (b), (e) 2., am. (1) (e) 4., r. (2) (b), (d) 3., am. (2) (d) 5., r. (2) (j), (k), (3) (b), (d) 2., am. (3) (d) 4., r. (4) (b), (d) 2., am. (4) (d) 4., (i), r. (4) (j) Register September 2014 No. 705, eff. 10-1-14.
TCS 5.05 TCS 5.05Fiscal impact. The analysis of the fiscal impact of additional or new facilities, rentals and remodeling of existing facilities submitted to the board under s. TCS 5.04 (2) (f), (3) (e) and (4) (f) shall include:
TCS 5.05(1) (1) Data relative to increased instructional costs, increased administrative, maintenance and energy costs and costs for new or replacement equipment resulting from the additional or new facilities, rentals or remodeling of existing facilities.
TCS 5.05(2) (2) A list of the source of funds in substantially the following form:
TCS 5.05(2)(a) (a) Tax levy - FY
TCS 5.05(2)(b) (b) Fund transfer or reserve fund
TCS 5.05(2)(c) (c) Proposed sale of bonds or notes
TCS 5.05(2)(d) (d) Other funds:
TCS 5.05(2)(d)1. 1. Federal funds
2. Gifts or grants
TCS 5.05(2)(e) (e) Total funds
TCS 5.05 History History: Cr. Register, November, 1983, No. 335, eff. 12-1-83; am. (intro.), Register, September, 1985, No. 357, eff. 10-1-85; correction in (intro.) made under s. 13.93 (2m) (b) 7., Stats., Register, June, 1994, No. 462; CR 13-050: r. (3) Register September 2014 No. 705, eff. 10-1-14.
TCS 5.06 TCS 5.06Notification of review. The director shall notify the district board at least 7 days prior to board review of the proposals for land acquisition, additional or new facilities, rentals or remodeling of existing facilities of the director's recommendation to the board and the rationale for the recommendation. The district board or its designee may appear before the board to submit any data or information in support of the district board's proposal.
TCS 5.06 History History: Cr. Register, November, 1983, No. 335, eff. 12-1-83; CR 13-050: am. Register September 2014 No. 705, eff. 10-1-14.
TCS 5.07 TCS 5.07Notification of board action. The director shall notify the district board of the board's decision within 10 days of the board meeting where the proposal is reviewed.
TCS 5.07 History History: Cr. Register, November, 1983, No. 335, eff. 12-1-83.
TCS 5.08 TCS 5.08Criteria used in review.
TCS 5.08(1) (1) The board shall review proposals for approval of land acquisitions, additional or new facilities, rentals or remodeling based upon the information and data submitted to it under this chapter.
TCS 5.08(2) (2) Information and data required under s. TCS 5.04 (1) to (4) shall be reviewed on the basis of acceptable or not acceptable.
TCS 5.08 History History: Cr. Register, November, 1983, No. 335, eff. 12-1-83; am. (2), Register, September, 1985, No. 357, eff. 10-1-85; correction in (2) made under s. 13.93 (2m) (b) 7., Stats., Register, June, 1994, No. 462.
TCS 5.09 TCS 5.09Exclusion of minor remodeling and minor rentals.
TCS 5.09(1)(1) Remodeling of existing facilities where project costs for a fiscal year do not exceed $100,000 per single campus site, as determined by the board under s. TCS 7.07 (6), are considered minor remodeling and are exempt from board review and approval under s. 38.04 (10) (a), Stats., and this chapter.
TCS 5.09(2) (2) Rentals of $50,000 or less and where the term of the lease is 3 years or less are considered minor rentals and are exempt from approval under s. 38.04 (10) (a), Stats., and this chapter.
TCS 5.09 History History: Cr. Register, July, 1986, No. 367, eff. 8-1-86; correction in (1) made under s. 13.93 (2m) (b) 7., Stats., Register, June, 1994, No. 462; CR 13-050: am. Register September 2014 No. 705, eff. 10-1-14; 2015 Wis. Act 329: am. (1) Register April 2016 No. 724, eff. 5-1-16.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.