Register April 2016 No. 724
Chapter TCS 5
FACILITY DEVELOPMENT PROCEDURES
TCS 5.03 Submission of request.
TCS 5.04 Contents of submittal.
TCS 5.06 Notification of review.
TCS 5.07 Notification of board action.
TCS 5.08 Criteria used in review.
TCS 5.09 Exclusion of minor remodeling and minor rentals.
Ch. TCS 5 Note
Note: Chapter A-V 5 was renumbered chapter VTAE 5,
Register, September, 1985, No. 357, eff. 10-1-85. Chapter VTAE 5 was renumbered Chapter TCS 5 under s. 13.93 (2m) (b) 1., Stats.,
Register, June, 1994, No. 462.
TCS 5.01
TCS 5.01 Purpose. The purpose of this chapter is to set forth procedures for board approval of requests by district boards for land acquisition, additional or new facilities, rentals and remodeling of existing facilities under s.
38.04 (10), Stats.
TCS 5.01 History
History: Cr.
Register, November, 1983, No. 335, eff. 12-1-83.
TCS 5.02
TCS 5.02 Definitions. In this chapter:
TCS 5.02(1)
(1) “Additional or new facilities" means construction of new facilities or elevated walkways or the completion of a shell from prior construction.
TCS 5.02(2)
(2) “Board" means the technical college system board.
TCS 5.02(4)
(4) “District" means a technical college district established under
ch. 38, Stats.
TCS 5.02(5)
(5) “District board" means the district board in charge of the technical colleges of a district.
TCS 5.02(6)
(6) “HVAC system" means heating, ventilation and air-conditioning system.
TCS 5.02(7)
(7) “Land acquisition" means the acquisition of real property by purchase, lease/purchase, gift or trade.
TCS 5.02(8)
(8) “Remodeling of existing facilities" means the reconstruction of an existing structure, or a major portion thereof, for the purpose of making permanent improvements.
TCS 5.02(9)
(9) “Rentals" means the acquisition of a parcel of land or site, together with the structures, equipment and improvements on or appurtenant to the land or site by lease agreement.
TCS 5.02 History
History: Cr.
Register, November, 1983, No. 335, eff. 12-1-83; am. (9),
Register, July, 1986, No. 367, eff. 8-1-86; correction in (2), (4) and (5) made under s. 13.93 (2m) (b) 6., Stats.,
Register, June, 1994, No. 462.
TCS 5.03
TCS 5.03 Submission of request. Requests for board approval of proposals for land acquisition, additional or new facilities, rentals or remodeling of existing facilities shall be submitted by the district board to the director no less than 45 days prior to the board meeting at which the proposal will be reviewed.
TCS 5.03 History
History: Cr.
Register, November, 1983, No. 335, eff. 12-1-83.
TCS 5.04
TCS 5.04 Contents of submittal. TCS 5.04(1)
(1)
Land acquisition. A district board shall submit the following information relative to proposals for land acquisition for evaluation by the board:
TCS 5.04(1)(a)
(a) A resolution of the district board approving the land acquisition contingent upon board approval.
TCS 5.04(1)(d)
(d) A copy of a certified land survey indicating the boundaries and legal description of the land to be acquired.
TCS 5.04(1)(e)
(e) A report relating programmatic and student requirements, and the needs of business and industry, to the need for land acquisition. The report shall include data indicating the need for land acquisition based upon:
TCS 5.04(1)(e)1.
1. An analysis of the needs of business and industry for persons with new skills and persons with updated skills.
TCS 5.04(1)(e)3.
3. An analysis of available student stations, and the need for additional student stations, including consideration of the needs of persons with handicaps.
TCS 5.04(1)(e)4.
4. Relevant program trend data for the district, including enrollment and placement data as available.
TCS 5.04(1)(f)
(f) A statement of the costs to be incurred for the land acquisition, including survey and legal fees.
TCS 5.04(1)(g)
(g) A statement indicating the availability and specific source of funds for the land acquisition.
TCS 5.04(2)
(2) Additional and new facilities. A district board shall submit the following information relative to proposal for additional or new facilities for evaluation by the board:
TCS 5.04(2)(a)
(a) A resolution of the district board approving the additional or new facilities.
TCS 5.04(2)(d)
(d) A report relating programmatic and student station requirements, and the needs of business and industry, to the need for additional or new facilities. The report shall include data indicating the need for additional or new facilities based upon:
TCS 5.04(2)(d)2.
2. An analysis of needs of business and industry for persons with new skills and persons with updated skills.
TCS 5.04(2)(d)4.
4. An analysis of available student stations, and the need for additional student stations, including a consideration of the needs of persons with handicaps.
TCS 5.04(2)(d)5.
5. Relevant program trend data for the district, including enrollment and placement data as available.
TCS 5.04(2)(e)
(e) Educational specifications relating specific space requirements for approved programs to the need for additional or new facilities.
TCS 5.04(2)(f)
(f) An analysis of the fiscal impact of additional or new facilities on the district's operating budget, including availability and specific source of funds as required under
s. TCS 5.05.
TCS 5.04(2)(g)
(g) A conceptual sketch of the proposed additional or new facilities.
TCS 5.04(2)(h)
(h) The estimated project cost by the following categories:
TCS 5.04(2)(i)
(i) A copy of the district energy study analysis indicating compliance with s.
1.12, Stats.
TCS 5.04(3)
(3) Rentals. Except as provided under
s. TCS 5.09 (2), a district board shall submit the following information relative to proposals for rentals for evaluation by the board:
TCS 5.04(3)(a)
(a) A resolution of the district board approving the lease contingent upon board approval.
TCS 5.04(3)(c)
(c) A copy of the proposed lease as reviewed by the district's legal counsel.
TCS 5.04(3)(d)
(d) A report relating programmatic and student requirements, and the needs of business and industry, to the need for the rental. The report shall include data indicating the need for the rental based upon: