4. Accept notices of intended emergency location or emergency excavation activity 24 hours a day.
5. Inform the person providing notice of the names of transmission facilities owners who will receive the notice information.
6. Promptly transmit notice information to affected-member transmission facilities owners.
7. Retain records of notices for a period of not less than 6 years.
135,8 Section 8 . 182.0175 (2) (title) of the statutes is repealed and recreated to read:
182.0175 (2) (title) Excavator and planner responsibilities.
135,9 Section 9 . 182.0175 (2) (a) (intro.) of the statutes is amended to read:
182.0175 (2) (a) (title) Planning. (intro.) Every person who engages in or with respect to subds. 1. and 2. is responsible for the preparation of plans and specifications for nonemergency excavation or demolition and every excavator shall do all of the following:
135,10 Section 10 . 182.0175 (2) (a) 1. of the statutes is amended to read:
182.0175 (2) (a) 1. Take reasonable action to learn the location of any transmission facilities in and near the area where such operation the excavation is to be conducted.
135,11 Section 11 . 182.0175 (2) (a) 2. of the statutes is amended to read:
182.0175 (2) (a) 2. Plan the excavation or demolition to avoid to the extent possible interference with transmission facilities in and near the construction excavation area.
135,12 Section 12 . 182.0175 (2) (a) 3. of the statutes is renumbered 182.0175 (2) (am) 1. and amended to read:
182.0175 (2) (am) 1. Provide reasonable advance notice not less than 3 working days prior to before the start of the nonemergency excavation or demolition of the intent to excavate or demolish and the commencement date to the owners of the transmission facilities in and near the construction area whose facilities may be affected by the excavation or demolition one-call system.
135,13 Section 13 . 182.0175 (2) (a) 4. of the statutes is renumbered 182.0175 (2) (am) 3. and amended to read:
182.0175 (2) (am) 3. Maintain an estimated minimum clearance of 18 inches between an unexposed underground transmission facility marked pursuant to par. (e) under sub. (2m) and the cutting edge or point of any power-operated excavating or earth moving equipment. If the transmission facility is exposed, the excavator may reduce the clearance may be reduced to 2 times the known limit of control of the cutting edge or point of the equipment or 12 inches, whichever is greater.
135,14 Section 14 . 182.0175 (2) (a) 5. of the statutes is renumbered 182.0175 (2) (am) 5. and amended to read:
182.0175 (2) (am) 5. Provide such support for existing transmission facilities in and near the construction excavation area as that may be reasonably necessary or that is specified by the transmission facility owner for the protection of such the facilities, unless such protection is required of the owner of the transmission facility under s. 66.047.
135,15 Section 15 . 182.0175 (2) (a) 6. of the statutes is renumbered 182.0175 (2) (am) 6. and amended to read:
182.0175 (2) (am) 6. Inspect prior to backfilling Before backfilling, inspect all transmission facilities exposed during excavation or demolition to ascertain if the transmission facilities have been or may have been struck, damaged, dislocated or disrupted and notify promptly before backfilling.
7. Immediately notify the owner of any a transmission facility which if an inspection reveals that the transmission facility has been or may have been struck, damaged, dislocated or disrupted.
135,16 Section 16 . 182.0175 (2) (a) 7. of the statutes is renumbered 182.0175 (2) (am) 8. and amended to read:
182.0175 (2) (am) 8. Backfill all excavations in such an excavation as specified by the owner of the existing transmission facilities or in a manner and with such materials as that may be reasonably necessary for the protection of, and to provide reliable support during backfilling and following backfilling for, existing transmission facilities in and near the construction excavation area.
135,17 Section 17 . 182.0175 (2) (am) (intro.) of the statutes is created to read:
182.0175 (2) (am) Excavation notice. (intro.) An excavator shall do all of the following:
135,18 Section 18 . 182.0175 (2) (am) 4. of the statutes is created to read:
182.0175 (2) (am) 4. Provide a repeat notice to the one-call system if marks are destroyed or covered by excavation site activities, if the excavation does not start within 10 days of the scheduled start date or if excavation is interrupted for more than 10 days.
135,19 Section 19 . 182.0175 (2) (am) 6m. of the statutes is created to read:
182.0175 (2) (am) 6m. Refrain from backfilling an excavation until an inspection is conducted and any necessary repairs have been made by the owner of the transmission facility.
135,20 Section 20 . 182.0175 (2) (b) of the statutes is renumbered 182.0175 (2) (am) 2. and amended to read:
182.0175 (2) (am) 2. Every person who engages in In an emergency excavation or demolition shall, take all reasonable precautions to avoid to the extent possible interference with existing transmission facilities in and near the construction excavation area and shall notify as promptly as possible the owners of transmission facilities which may be affected by the emergency excavation or demolition.
135,21 Section 21 . 182.0175 (2) (bm) of the statutes is created to read:
182.0175 (2) (bm) Notice. An excavation notice shall include all of the following information:
1. The name of the person providing notice.
2. The name, address and telephone number of the excavator.
3. The specific location and description of the excavation area, including the county, place, street address, nearest intersecting road, distance and direction from the nearest intersection and marking instructions.
4. A description of the intended excavation activity.
5. The intended starting date of the excavation.
135,22 Section 22 . 182.0175 (2) (c) and (d) of the statutes are repealed.
135,23 Section 23 . 182.0175 (2) (e) of the statutes is renumbered 182.0175 (2m) (b) and amended to read:
182.0175 (2m) (b) (title) Facilities marking. Every A person owning transmission facilities, upon receipt of an excavation notice under par. (a) 3., shall mark in a reasonable manner the locations of transmission facilities in at the field so as area described in the notice to enable the person engaged in excavation or demolition excavator to locate the transmission facilities without endangering the security of such the facilities or the public. The marking of facilities shall be accomplished completed within 3 working days after receipt of the notice, except or if notice is given more than 10 days before the excavation or demolition is scheduled to begin, marking need not shall be accomplished more than completed at least 3 working days before excavation or demolition is scheduled to begin. If the approximate location of an underground a transmission facility is marked with paint, flags, stakes or other physical means, the following color coding of lines, cables or conduits shall be as follows except that color coding shall not be required for permanent markers required by state and federal codes comply with the uniform color code adopted by the American National Standards Institute:
1. Electric power distribution and transmission: safety: red.
2. Natural gas distribution and transmission, oil distribution and transmission and dangerous Gas, oil, steam, petroleum or gaseous materials products lines: high visibility safety: yellow.
3. Telecommunications and telegraph systems Communications, cable television and police and fire communications: safety alert or alarm or signal systems: orange.
4. Water, irrigation or slurry systems: safety precaution blue.
5. Sewer or drain systems: safety green.
135,24 Section 24 . 182.0175 (2) (f) of the statutes is renumbered 182.0175 (2m) (c) and amended to read:
182.0175 (2m) (c) (title) Facilities inspection and repair. Every person owning transmission facilities who receives a notice under par. (a) 6., (c) or (d) of possible damage shall inspect the facilities for damage within 24 6 hours after receipt of the notice if there is risk of personal injury or loss of life or within 24 hours after receipt of the notice if there is not a risk of personal injury or loss of life and shall repair any damage found as soon as practicable. Unless the owner of any transmission facility is notified pursuant to par. (a) 6., (c) or (d) or has knowledge of frequent damage to transmission facilities by a person doing emergency or nonemergency excavation or demolition, such an excavator, the owner shall is not be responsible for or be required to make an inspection of its transmission facilities, nor shall the owner, in the absence of such notification or knowledge, be responsible for supervising in any manner the excavation or demolition work. Upon the giving of notice pursuant to par. (a) 6., (c) or (d) the person performing the demolition or excavation shall refrain from backfilling until an inspection and any necessary repairs are made by the owner of the transmission facilities.
135,25 Section 25 . 182.0175 (2m) (title) and (a) of the statutes are created to read:
182.0175 (2m) (title) Transmission facilities owner requirements. (a) Responsibilities. A transmission facilities owner shall do all of the following:
1. Respond to a planning notice within 10 days after receipt of the notice by conducting field markings, providing records and taking other appropriate responses.
2. Respond to an excavation notice within 3 working days by marking the location of transmission facilities as provided under par. (b) in the area described in the excavation notice.
3. Provide emergency locater service within 24 hours after receiving a request for that service.
135,26 Section 26 . 182.0175 (2m) (b) 6. and 7. of the statutes are created to read:
182.0175 (2m) (b) 6. Temporary survey markings: pink.
7. Proposed excavation: white.
135,27 Section 27 . 182.0175 (3) of the statutes is renumbered 182.0175 (3) (a) and amended to read:
182.0175 (3) (a) (title) Forfeitures. Any person who wilfully and knowingly fails to comply with violates this section, except sub. (2) (e), shall may be required to forfeit $1,000 $2,000 for each such failure, provided that if the failure to comply results in damage to any transmission facility, the forfeiture shall be $2,000 offense. Each day that failure to comply persists is of continued violation constitutes a separate offense. All actions to recover penalties under this section shall be brought in circuit court by the district attorney.
135,28 Section 28 . 182.0175 (3) (b) of the statutes is created to read:
182.0175 (3) (b) Misdemeanor. Whoever intentionally removes, moves or obliterates a transmission facilities marking placed by the transmission facilities owner may be fined not more than $500 or imprisoned for not more than 30 days or both. This paragraph does not apply to an excavator who removes or obliterates markings during an excavation.
135,29 Section 29 . 182.0175 (4) of the statutes is amended to read:
182.0175 (4) Right of action. This section shall not release or waive or otherwise affect any right of action, forfeiture or penalty which the this state or any person has or may have.
135,30 Section 30 . 182.0175 (5) of the statutes is amended to read:
182.0175 (5) Right to injunction. If any person engages in or is likely to engage in excavation or demolition contrary to the provisions of inconsistent with this section, and which results or is likely to result in damage to transmission facilities, the person who owns or operates such the facilities may seek injunctive relief in the circuit court for Dane the county or in any other court of competent jurisdiction in which the transmission facilities are located. If the transmission facilities are owned or operated by a public utility as defined in s. 196.01 (5), including a telecommunications carrier, as defined in s. 196.01 (8m), and the public utility does not seek injunctive relief, the attorney general, upon request of the public service commission, shall seek injunctive relief in the circuit court for Dane the county or in any other court of competent jurisdiction in which the transmission facilities are located.
135,31 Section 31 . Initial applicability.
(1) This act first applies to notices given on the effective date of this subsection.
135,32 Section 32 . Effective date.
(1)This act takes effect on the first day of the 12th month beginning after publication.