NR 120.14(15) (15)Shoreline and streambank protection.
NR 120.14(15)(a)(a) Description. Shoreline or streambank stabilization is the stabilization and protection of the banks of streams and lakes against erosion and the protection of fish habitat and water quality from livestock access. This practice shall be implemented using one or more of the standards in par. (c).
NR 120.14(15)(b) (b) Conditions.
NR 120.14(15)(b)1.1. The cost-share recipient is responsible for obtaining all permits for the installation of the practice.
NR 120.14(15)(b)2. 2. Cost-sharing may be provided:
NR 120.14(15)(b)2.a. a. For planting trees if approved by a county's land conservation department in consultation with the department fish manager.
NR 120.14(15)(b)2.b. b. For water pumps and other measures required to eliminate livestock access to water.
NR 120.14(15)(b)2.c. c. To install livestock and machinery crossings that will minimize disturbance of the stream channel and banks.
NR 120.14(15)(b)2.d. d. For the design and placement of practices such as shaping and placement of vegetation, riprap or structures which improve fishery habitat, or other materials on banks and shores identified in an approved priority watershed plan, priority lake plan or the project grant application, or in areas where streambank repair is the least costly alternative. Written departmental approval is required for the stabilization of banks with structural heights higher than 15 feet.
NR 120.14(15)(b)2.e. e. For required permits.
NR 120.14 Note Note: A permit may be required under ch. 30, Stats., when installing this best management practice. For more information, please contact the Bureau of Fisheries Management and Habitat Protection, P.O. Box 7921, Madison, Wisconsin 53707.
NR 120.14(15)(b)3. 3. Cost-sharing is not authorized for wood chunks, unsorted demolition material, brick, plaster, blacktop and any other material that could produce leachates or would violate provisions of statutes or administrative codes for use as riprap.
NR 120.14(15)(c) (c) Standards.
NR 120.14(15)(c)1.1. Standards from the NRCS field office technical guide are as follows:
NR 120.14(15)(c)1.a. a. 580 — streambank and shoreline protection; February, 1997.
NR 120.14(15)(c)1.b. b. 342 — critical area planting; November, 1999.
NR 120.14(15)(c)1.c. c. 382 — fence; November, 1999.
NR 120.14(15)(c)1.d. d. 472 — livestock exclusion; June, 1983.
NR 120.14(15)(c)1.e. e. 612 — tree planting; October, 1991.
NR 120.14(15)(c)1.f. f. 395 — fish stream improvement; June, 1987.
NR 120.14(15)(c)1.g. g. 560 — access road; March, 1989.
NR 120.14(15)(c)1.h. h. 614 — trough or tank; September, 1989.
NR 120.14(15)(c)1.i. i. 510 — pasture and hayland management; December, 1984.
NR 120.14(15)(c)2. 2. Other standards:
NR 120.14(15)(c)2.a. a. U.S. department of transportation hydraulic engineering Circulars numbers 11, Design of Riprap Revetment, Pub. No. FH WA-IP-89-016, March, 1989 and 15, Design of Roadside Channels with Flexible Linings, Pub. No. FH WA-IP-87-7, April, 1998, which are incorporated by reference for this chapter.
NR 120.14(15)(c)2.b. b. American fisheries society's stream obstruction removal guidelines, which are incorporated by reference for this chapter.
NR 120.14(15)(c)2.c. c. U.S. department of agriculture's Stream Habitat Improvement Handbook, publication R8-TP-16, June 1992, which is incorporated by reference for this chapter.
NR 120.14(15)(c)2.d. d. Natural Resources Conservation Service Engineering Field Handbook, Soil Bioengineering for Upland Slope Protection and Erosion Reduction, Pub. 210-EFH, October, 1992, which is incorporated by reference for this chapter.
NR 120.14 Note Note: Copies of the materials described in subd. 2. a. to d. may be inspected at the offices of the department, 101 S. Webster Street, Madison; the Secretary of State, 30 W. Mifflin, Madison; and the Legislative Reference Bureau, One E. Main Street, Suite 200, Madison.
NR 120.14(16) (16)Riparian buffers.
NR 120.14(16)(a)(a) Description. Riparian buffers are areas in which vegetation is enhanced or established to reduce or eliminate the movement of sediment, nutrients and other nonpoint source pollutants to adjacent surface water resources or groundwater recharge areas and to protect the banks of streams and lakes from erosion and to protect fish habitat. This practice shall be implemented using one or more of the standards in par. (c).
NR 120.14(16)(b) (b) Conditions.
NR 120.14(16)(b)1.1. Cost-sharing may be provided only when the riparian buffers are used consistent with the approved priority watershed plan, priority lake plan or project grant application or approved priority watershed or lake plan.
NR 120.14(16)(b)2. 2. Cost-sharing may be provided for:
NR 120.14(16)(b)2.a. a. Permanent fencing to protect a riparian buffer.
NR 120.14(16)(b)2.b. b. Establishment or enhancement of permanent vegetative cover in a riparian buffer.
NR 120.14(16)(b)2.c. c. Mulch, fertilizer, seed, seedling trees and other necessary materials.
NR 120.14(16)(c) (c) Standards. NRCS field office technical guide technical standards are as follows:
NR 120.14(16)(c)1. 1. 342 — critical area planting; May, 2000.
NR 120.14(16)(c)2. 2. 382 — fence; November, 1999.
NR 120.14(16)(c)3. 3. 386 — field border; December, 1991.
NR 120.14(16)(c)4. 4. 393 — filter strip; January, 2001.
NR 120.14(16)(c)5. 5. 472 — livestock exclusion; June, 1983.
NR 120.14(16)(c)6. 6. 484 — mulching; July, 1987.
NR 120.14(16)(c)7. 7. 645 — wildlife upland habitat management; July, 2000.
NR 120.14(17) (17)Lake sediment treatment.
NR 120.14(17)(a)(a) Description. Lake sediment treatment is a chemical, physical or biological treatment of polluted lake sediments.
NR 120.14(17)(b) (b) Conditions.
NR 120.14(17)(b)1.1. Cost-sharing may be provided for:
NR 120.14(17)(b)1.a. a. Design and treatment of lake sediments with chemical compounds, including, but not limited to, aluminum sulfate, sodium aluminate, ferric chloride, calcium hydroxide and calcium carbonate.
NR 120.14(17)(b)1.b. b. Treatment of lake sediments with physical or biological methods including, but not limited to, the aeration of water overlaying lake sediments and the biological manipulation of organisms which exacerbate sediment contamination of overlaying lake water.
NR 120.14(17)(b)2. 2. Cost-sharing may not be provided for the dredging of sediments.
NR 120.14(17)(b)3. 3. Water quality objectives shall be achieved through the control of polluted lake sediments.
NR 120.14(17)(b)4. 4. Significant nonpoint sources of the pollution to the lake shall be controlled prior to treatment of lake sediments.
NR 120.14(17)(b)5. 5. The department prior to implementation shall approve the engineering design and, if required will issue an appropriate permit.
NR 120.14(17)(c) (c) Standards. The design and proposed implementation of lake sediment treatments shall be approved by the department prior to implementation.
NR 120.14(18) (18)Wetland restoration.
NR 120.14(18)(a)(a) Description. Wetland restoration is the construction of berms or destruction of the function of tile lines and drainage ditches to create conditions suitable for wetland vegetation. This practice shall be implemented using the standard in par. (c).
NR 120.14(18)(b) (b) Conditions. Cost-sharing may be provided for:
NR 120.14(18)(b)1. 1. Earth moving to construct or remove berms, levees or dikes.
NR 120.14(18)(b)2. 2. Earth moving to fill in portions of drainage ditches.
NR 120.14(18)(b)3. 3. Destruction of portions of tile lines.
NR 120.14(18)(b)4. 4. Vegetative cover needed to develop or restore wetlands consistent with the approved priority watershed plan, priority lake plan or project grant application.
NR 120.14(18)(c) (c) Standards. NRCS field office technical guide technical standards 657 — wetland restoration; September, 2000.
NR 120.14(19) (19)Shoreline habitat restoration for developed areas.
NR 120.14(19)(a)(a) Description. Shoreline habitat restoration is the establishment in developed areas of a shoreline buffer zone of diverse native vegetation that extends inland and waterward from the ordinary high water mark. The shoreline habitat restoration design seeks to restore the functions provided by the original, natural vegetation, and includes a mixture of native trees, shrubs, ground cover or wetland species. This practice includes the following:
NR 120.14(19)(a)1. 1. Natural recovery. Used where native vegetation will recover naturally when a site is protected from disturbance, due to the presence of existing native plants, and adequate seed sources and site conditions. This method may be applied to wet margins of lakes or rivers where turf grasses are not well established and in shallow water areas adjacent to shoreland restoration areas.
NR 120.14(19)(a)2. 2. Accelerated recovery. Used in areas not suited for natural recovery. Native vegetation is established by seeding and planting. This method shall be used in areas where dense turf grasses have been maintained for several years. This may also be used in limited situations where one or more layers of natural vegetative cover have been removed if approved by the department. This practice shall be implemented using one or more of the standards in par. (c).
NR 120.14(19)(b) (b) Conditions.
NR 120.14(19)(b)1.1. Cost-sharing for shoreline habitat restoration may be approved when existing shoreline vegetation lacks the structure or complexity to support habitat functions for littoral and riparian areas.
NR 120.14(19)(b)2. 2. Cost-sharing may be provided for plants, seed, mulch and erosion control materials.
NR 120.14(19)(b)3. 3. Cost-sharing may be provided for labor and services necessary for installation, not to exceed 70% of total practice costs, or not to exceed a cost containment policy developed by the governmental unit for this practice.
NR 120.14(19)(b)4. 4. Cost-sharing may not be provided for the following:
NR 120.14(19)(b)4.a. a. Practice design unless approved by the department.
NR 120.14(19)(b)4.b. b. Plants, seed, mulch or other materials not approved by the department.
NR 120.14(19)(b)4.c. c. Shoreline erosion control materials such as riprap or biologs unless approved by the department.
NR 120.14(19)(b)4.d. d. Material for stairs, walkways, paths or other access structures.
NR 120.14(19)(b)5. 5. The following conditions shall be met in order for cost-sharing to be available:
NR 120.14(19)(b)5.a. a. No violations of county and local shoreland zoning requirements are present on the entire property.
NR 120.14(19)(b)5.b. b. Runoff from roofs, driveways or other hard surfaces on the property shall be maintained in sheet flow with no channels or gullies to the greatest extent possible. This can be accomplished with downspout runoff spreaders, directing runoff to flat or gently sloping grassy areas and minor landscaping to temporarily pond or spread out runoff. There may be no channelized flow through the restoration area. Where fertilizers are desired outside the buffer area, zero-phosphorus types shall be used unless soil tests specifically indicate a need for phosphorus and the project sponsor approves its use.
NR 120.14(19)(b)5.c. c. No changes in land use or management may occur that cause increased pollution to surface water from sources that were controlled prior to the installation of a shoreline habitat restoration practice.
NR 120.14(19)(b)6. 6. The following dimensions or restrictions apply to the restoration:
NR 120.14(19)(b)6.a. a. The buffer created by shoreline habitat restoration shall extend the entire length of the lot along the shoreline except that a viewing and access corridor is allowed, which corridor will not be eligible for cost-sharing. Corridors may not exceed 30 feet in width and may encompass no greater than 30% of the property for lots less than 100 feet wide. The restoration area design may include the provision of water access, the enhancement of desirable views, the screening of unwanted views and consideration of privacy. Where buildings are set back 50 feet or more, the buffer shall extend at least 35 feet inland from the ordinary high water mark. Where buildings are set back less than 50 feet, the zone where vegetation removal and land-disturbing activity are prohibited after buffer establishment, shall extend to within 15 feet of the structure.
NR 120.14(19)(b)6.b. b. Shallow water areas that are capable of supporting aquatic vegetation waterward of the ordinary high water mark shall be managed as a zone where vegetation removal and land-disturbing activity are prohibited after buffer establishment. Areas waterward of the viewing and access corridor are exempt from this condition.
NR 120.14(19)(b)6.c. c. An evaluation of existing vegetation on the site is necessary prior to the selection of plant materials and restoration method. The natural vegetation that occurs in the region or vicinity of the restoration site shall be considered in developing restoration plans.
NR 120.14(19)(b)6.d. d. In order to restore the functional values of the vegetative buffer, it shall consist of 3 layers: a ground cover, a shrub layer and a tree canopy. Vegetation in all 3 layers shall be vigorous, diverse and structurally complex. The only exception to this requirement shall be where natural conditions in the region lack these characteristics.
NR 120.14(19)(b)6.e. e. Vegetation shall be adapted to the local soils, climate and the surrounding vegetation. Only species approved by the project sponsor may be planted. Native species are required, and certain invasive species such as reed canary grass and purple loosestrife are prohibited.
NR 120.14(19)(b)6.f. f. The project sponsor shall identify the most appropriate recovery methods for each individual site.
NR 120.14(19)(b)7. 7. The following conditions apply to practice installation:
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.