NR 300.17(1)(b)
(b) An ordinary high water mark determination based on an on-site inspection of the land by the department of the ordinary high water mark for an individual waterbody on a property.
NR 300.17(1)(c)
(c) A navigability confirmation, which is a service the department provides to concur with the navigability of a waterbody as preliminarily determined by an independent third party. The preliminary navigability determination is prepared by an independent third party and meets the minimum submittal requirements specified in sub.
(2). If the department concurs with the preliminary navigability determination completed by the independent third party, the department's confirmation becomes the state's legal determination and the confirmation shall also include the exact location and summarize the information used to make this determination. If the department does not agree with the preliminary navigability determination as presented by the independent third party, the department may request the necessary information from the independent third party needed for the determination decision to be confirmed by the department, or the department may follow up with a site inspection to make the final determination for navigability.
NR 300.17(1)(d)
(d) An ordinary high water mark confirmation, which is a service the department provides to concur with an ordinary high water mark determination of a waterbody as determined by an independent third party. The ordinary high water mark determination is prepared by an independent third party and meets the minimum submittal requirements specified in sub.
(3). If the department concurs with the ordinary high water mark determination completed by an independent third party, the department's confirmation shall also include the exact location and summarize the information used to make this determination. If the department does not agree with the preliminary ordinary high water mark determination as presented by the independent party, the department may request the necessary information from the third party needed for the determination decision to be confirmed by the department, or the department may follow up with a site inspection to make the final determination for the ordinary high water mark.
NR 300.17 Note
Note: For zoning purposes, a person should request services in this section from their local zoning authority.
NR 300.17 Note
Note: An ordinary high water mark or navigability determination must be either completed by the department or confirmed by the department before it can be used for department regulatory decisions.
NR 300.17(1)(e)
(e) Requests for a service under pars.
(a) to
(d) shall be submitted in the manner and form specified by the department, for the service.
NR 300.17(1)(f)
(f) A person may request that the department complete a navigability-in-fact determination if the person disputes the navigability determination under par.
(a) or
(c). The department shall use a watercraft to confirm the navigability of the waterway. A requester shall comply with the declaratory ruling process specified in s.
227.41, Stats.
NR 300.17(2)
(2)
Minimum navigability submittal requirements. Minimal submittal requirements must be provided to the department in order to submit a navigability confirmation request under sub.
(1) (c). The minimum submittal requirements shall include all of the following:
NR 300.17(2)(c)
(c) Historical data including aerial imagery, topography, and survey data.
NR 300.17(2)(e)
(e) Hydrologic conditions including bank height, bed width, and water depth.
NR 300.17(3)
(3)
Minimum ordinary high water mark submittal requirements. Minimum submittal requirements must be provided to the department in order to submit an ordinary high water mark confirmation request under sub.
(1) (d). The minimum submittal requirements shall include all of the following:
NR 300.17(3)(c)
(c) Vegetation types above and below the preliminary ordinary high water mark.
NR 300.17(3)(d)
(d) Factors affecting location of the ordinary high water mark such as structures, shore protection and shore configuration.
NR 300.17(3)(f)
(f) Distance from the ordinary high water mark to the water's edge.
NR 300.17(3)(g)
(g) Preliminary ordinary high water mark elevation and benchmark information.
NR 300.17(4)(a)(a) Except as provided in par.
(b), a person who seeks a service from the department under sub.
(1) shall submit this request through the department electronic permitting system or other submittal process specified by the department and shall provide all the information in sub.
(2) or
(3). The department shall maintain service requests forms consistent with the minimum submittal requirements in subs.
(2) and
(3) and shall provide a copy of the form to any person upon request. This copy may be provided electronically.
NR 300.17(4)(b)
(b) The department may dismiss service requests for requests that do not have proper site indicators or information to meet the minimum submittal requirements.
NR 300.17(5)
(5)
General fees. The department may charge the following fees for services:
NR 300.17(5)(a)
(a) The application fee for an ordinary high water mark determination under sub.
(1) (b) is $200 for each project boundary.
NR 300.17(5)(b)
(b) The application fee for a navigability determination under sub.
(1) (a) is $200 for each waterway within a project boundary.
NR 300.17(5)(c)
(c) The total application fee for both an ordinary high water mark and a navigability determination under pars.
(a) and
(b) is $300 for each waterbody within a project boundary.
NR 300.17(5)(d)
(d) The application fee for an ordinary high water mark confirmation under sub.
(1) (d) is $100.
NR 300.17(5)(g)
(g) The department may utilize an electronic payment system for collecting payment. The department may impose a $3 service fee to use the electronic payment system.
NR 300.17(6)
(6)
Expedited fees. The department may charge a supplemental fee for service under sub.
(1) that is an expedited service fee of $3,500 in addition to fees charged under sub.
(5) if all of the following apply:
NR 300.17(6)(a)
(a) The applicant requests in writing that the service be provided within a time period that is shorter than the time limit specified under sub.
(7) for that type of service.
NR 300.17(6)(b)
(b) The department verifies that it will be able to comply with the request.
NR 300.17(7)(a)(a) Except as provided under pars.
(c) and
(d), the department shall do all of the following:
NR 300.17(7)(a)1.
1. Provide a navigability determination or ordinary high water mark determination under sub.
(1) (a) or
(b) no later than 60 days after a person files a request, in the manner and form required by the department, for the service.
NR 300.17(7)(a)2.
2. Provide a navigability confirmation or ordinary high water mark confirmation under sub.
(1) (c) or
(d) no later than 30 days after a person files a request, in the manner and form required by the department, for the service.
NR 300.17(7)(c)
(c)
If adverse weather conditions, or other conditions at the site, prevent the department from conducting an accurate on-site inspection necessary for making the determination under sub.
(1) in sufficient time to comply with the deadline under par.
(a) 1. or
2., the department shall give notice to the person requesting the service that adverse weather conditions, or other conditions at the site, will prevent the department from complying with the deadline and give notice to the person that the department will provide the service as soon as possible when weather conditions, or other conditions at the site, allow the department to conduct an accurate on-site inspection.
NR 300.17 Note
Note: Adverse weather conditions may include severe flood or drought conditions or other weather patterns that make gathering accurate on-site information infeasible.
NR 300.17(7)(d)
(d) If a person fails to submit all information required for the service request under sub.
(1) (c) or
(d), the department may request additional information. The department may not ask for additional information more than once. The timeline under par.
(a) 1. will be on hold until this additional information request is satisfied.
NR 300.17 Note
Note: An ordinary high water mark or navigability determination must be either completed by the department or confirmed by the department before it can be used for department regulatory decisions.
NR 300.17(8)
(8)
exclusions. The services specified in sub.
(1) are not available if any of the following apply:
NR 300.17(8)(a)
(a) The waterbody in question is on Lake Michigan, Lake Superior, outlying waters as defined in s.
29.001 (63), Stats., waterbodies subject to submerged land lease pursuant to s.
24.39 (4) (d), Stats., or waterbodies with approved bulkhead line pursuant to s.
30.11, Stats.
NR 300.17(8)(b)
(b) A court order has specified the ordinary high water mark or navigability determination for the area in question.
NR 300.17(8)(c)
(c) The request is related to a project where only local regulations are applicable.
NR 300.17 Note
Note: Projects only subject to shoreland setback should pursue compliance with local regulations only and would not be appropriate for this service.
NR 300.17(9)
(9)
Memorandum of agreement. The department may negotiate with municipalities, the U.S. army corps of engineers, and other governmental entities to enter into a memorandum of agreement that provides navigability and ordinary high water mark determinations through alternative means and methods in lieu of the process, timelines, and fees specified subs.
(2) to
(7).
NR 300.17 Note
Note: Municipalities may make ordinary high water mark or navigability determinations for the purposes of implementing their own regulatory or zoning programs.
NR 300.17(10)(a)(a) Except as provided under s.
30.10 (2) (b), Stats.,
navigability determinations and confirmations under sub.
(1) (a) and
(c) are valid in perpetuity unless a requestor or the department can demonstrate that water level fluctuations, land use changes, or other factors that significantly change hydrology or fluvial geomorphology at the site have caused the characteristics of a navigable waterway to be to be substantially altered since a previous department determination.
NR 300.17(10)(b)
(b) Ordinary high water mark determinations and confirmations under sub.
(1) (b) and
(d) are valid for a period of 5 years unless a requestor or the department can demonstrate that physical ordinary high water mark indicators have substantially changed due to natural processes since a previous department determination was made.
NR 300.17 History
History: CR 22-013: cr.
Register June 2023 No. 810, eff. 7-1-23; correction in (1) (c), (d), (2) (intro.), (3) (intro.), (4) (a), (6) (intro.), (8) (a) made under s.
35.17, Stats., and correction in numbering in (2), (6), (7) made under s.
13.92 (4) (b) 1. Register June 2023 No. 810.
NR 300.18(1)(1)
Wetland identification and confirmation service. NR 300.18(1)(am)
(am) Any person who requests a wetland identification or confirmation service from the department under s.
23.321, Stats., shall use standard request protocols and submittal requirements that are established by the department. The department will complete these service requests as soon as practicable consistent with s.
23.321 (4), Stats., and may use off-site review methods consistent with U.S. army corps of engineers' wetland determination protocols as provided under s.
281.36 (2m), Stats.
NR 300.18(1)(bm)
(bm) The department may develop and utilize off-site review methods for non-growing season wetland identification and confirmation services in lieu of putting these requests on hold under s.
23.321 (4) (b), Stats., so long as the methods are consistent with U. S. army corps of engineers' standards as provided under s.
281.36 (2m), Stats.
NR 300.18(2)
(2)
Expedited service fees. In addition to the fees specified under s.
23.321 (3), Stats., the department shall charge an additional $3,500 fee for stakeholders who wish to expedite a wetland identification or confirmation service request under s.
23.321 (3m), Stats.
NR 300.18(3)(a)(a) The department shall develop and maintain standard mapping methods and quality assurance protocols that align with applicable federal fish and wildlife service standards to complete the mapping requirements under s.
23.32, Stats.
NR 300.18(3)(am)
(am) A person may request that a watershed be mapped by the department using the standards in this subsection. A request shall be for a watershed no smaller than a 12-digit hydrologic unit code (HUC) watershed.
NR 300.18(3)(b)
(b) The department will establish mapping priorities based on available funding and may enter into a memorandum of agreement with the person in par.
(am) to secure adequate funding for the mapping request.
NR 300.18(3)(c)
(c) The department may enter into a memorandum of agreement with another organization or entity to incorporate wetland mapping conducted by the organization or entity so long as the memorandum of agreement and mapping outputs comply with applicable state and federal standards and s.
23.32, Stats.
NR 300.18 History
History: CR 22-013: cr.
Register June 2023 No. 810, eff. 7-1-23; renumber (1) (intro), (a) to (1) (am), (bm) and made under s.
13.92 (4) (b) 1., Stats., and correction in (1) (am), (bm) made under s.
35.17, Stats., correction in numbering of (3) (a), (am) made under s.
13.92 (4) (b) 1., Stats., and correction in (3) (b) made under. s.
13.92 (4) (b) 7., Stats.,
Register June 2023 No. 810.
NR 300.20(1)(1)
Except as provided under sub.
(3), the department may process an after-the-fact permit application for a regulated project that was initiated or completed prior to receiving a permit authorizing that activity. The after-the-fact permit may be a general or individual permit.
NR 300.20(2)
(2) If an after-the-fact permit is processed prior to the completion of an enforcement action against the person who initiated or completed the regulated activity, the department may continue the processing of the enforcement action, regardless of whether the after-the-fact permit is ultimately granted.
NR 300.20(3)
(3) This section shall not preclude the department from scheduling a permit application for public hearing on the same day as an abatement hearing under s.
30.03 (4) (a), Stats.
NR 300.20 History
History: CR 22-013: cr.
Register June 2023 No. 810, eff. 7-1-23.
NR 300.21
NR 300.21 Relationship of enforcement and permit proceedings. The department shall not process after-the-fact permit or approval applications under s.
NR 300.20 prior to the completion of any enforcement actions if any of the following apply:
NR 300.21(1)
(1) The project is causing or is likely to cause environmental damage.
NR 300.21(2)
(2) Department staff have an objection to the issuance of the permit or approval based on the relevant statutory standards for issuance of the permit or approval.
NR 300.21(3)
(3) The prosecuting attorney in the enforcement action has not given consent to the processing of the application prior to the completion of the enforcement action.
NR 300.21 History
History: CR 22-013: cr.
Register June 2023 No. 810, eff. 7-1-23; correction in numbering made under s.
13.92 (4) (b) 1., Stats.,
Register June 2023 No. 810.
NR 300.22
NR 300.22 Relationship of enforcement and confirmations. The department shall not process an ordinary high water mark or navigability confirmation request pursuant to s.
NR 300.17 prior to the completion of any enforcement action if any of the following apply:
NR 300.22(1)
(1) Department staff have an objection to the confirmation based on the relevant statutory standards.
NR 300.22(2)
(2) The information provided is not reflective of site conditions or does not meet the minimum submittal requirements in s.
NR 300.17 (2) or
(3).
NR 300.22(3)
(3) The prosecuting attorney in the enforcement action has not given consent to the processing of the confirmation request prior to the completion of the enforcement action.
NR 300.22 History
History: CR 22-013: cr.
Register June 2023 No. 810, eff. 7-1-23; correction in numbering made under s. 13.92 (4) (b) 1., Stats., and, as renumbered, correction in (2) made under s. 35.17, Stats.,
Register June 2023 No. 810.
NR 300.23
NR 300.23
Exceptions to time limits.