SPS 302.12(1)(1)
Plan examination and inspection fees. A fee of $700.00 shall be submitted for plan examination and external inspection of each new anhydrous ammonia handling or storage facility.
SPS 302.12(2)(a)
(a) Storage facilities. Fees for the required periodic inspection of storage facilities shall be $150.00 per facility.
SPS 302.12(3)
(3)
Reinspection fees. A fee in accordance with s.
SPS 302.04 (2) shall be assessed for inspections made by the department to gain compliance with ch.
SPS 343, after orders directing compliance have been issued by the department.
SPS 302.12(4)
(4)
Permit to operate. The fee for the issuance of a permit to operate each anhydrous ammonia system shall be $50.00.
SPS 302.12 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; am. (1), (2) (a) and (3) and Table 2.12,
Register, July, 2000, No. 535, eff. 9-1-00;
CR 05-038: am. (1), cr. (2m)
Register October 2005 No. 598, eff. 11-1-05;
CR 08-039: am. (1), (2) and Table 2.12, renum. (2m) and (3) to be (3) and (4)
Register November 2008 No. 635, eff. 12-1-08;
CR 09-050: am. (4)
Register December 2009 No. 648, eff. 1-1-10; correction in (2) (b), (3) made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 302.13
SPS 302.13 Mechanical refrigeration systems. SPS 302.13(1)(a)(a) The inspection fees, based on the aggregate tonnage of the mechanical refrigeration system, shall be determined in accordance with Table 302.13.
-
See PDF for table SPS 302.13 Note
Note: For the purpose of assessing the inspection fee, the capacity of a mechanical refrigeration system will be determined in tons. One ton of refrigeration capacity is considered to be the equivalent of abstracting heat at the rate of 12,000 Btu per hour.
SPS 302.13(2)
(2)
Reinspection fees. A fee of $80.00 per inspection shall be assessed for inspections made by the department to gain compliance with ch.
SPS 345, after orders directing compliance have been issued by the department.
SPS 302.13(3)
(3)
Permit to operate. The fee for the issuance of a permit to operate each mechanical refrigeration system shall be $50.00.
SPS 302.13 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; correction in (3) (c) made under s. 13.93 (2m) (b) 7., Stats.,
Register, November, 1994, No. 467; r. (3),
Register, October, 1996, No. 490, eff. 11-1-96; am. Table 2.13 and (2),
Register, July, 2000, No. 535, eff. 9-1-00;
CR 05-038: cr. (1m)
Register October 2005 No. 598, eff. 11-1-05;
CR 08-039: am. Table 2.13, renum. (1m) and (2) to be (2) and (3) and am. (2)
Register November 2008 No. 635, eff. 12-1-08;
CR 09-050: am. (3)
Register December 2009 No. 648, eff. 1-1-10;
CR 10-011: renum. (1) to be (1) (a), cr. (1) (b)
Register August 2010 No. 656, eff. 9-1-10; correction in (1) (a), (b), (2) made under s. 13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 302.15
SPS 302.15 Elevators, power dumbwaiters, escalators, moving walks and ramps, lifts for accessibility and material lifts. SPS 302.15(1)(1)
Plan examination, application and initial inspection fees. Fees for the initial inspection and for the examination of plans or for an application for installation or alteration, or both, submitted in accordance with the requirements of s.
SPS 318.1007 or
318.1008, shall be determined in accordance with Table 302.15. A reinspection fee as specified in Table 302.15 shall be charged for each inspection conducted until the installation or alteration qualifies for a permit to operate.
SPS 302.15(2)
(2)
Periodic inspection and reinspection fees. Fees for periodic inspections and reinspections of all classes of elevators and lifting devices within the scope of ch.
SPS 318 shall be determined in accordance with Table 302.15. An inspection fee shall also be charged for each reinspection of an elevator in accordance with Table 302.15 until the installation or alteration qualifies for a permit to operate.
SPS 302.15(3)
(3)
Fee for failure to have equipment ready for inspection. A fee equal to 50% of the applicable inspection fee shall be assessed for failure to have the elevator or lifting device ready for inspection on the date specified, unless the department is notified, in writing, 7 business days prior to the specified inspection date.
SPS 302.15(4)
(4)
Permit to operate. The fee for the issuance of a permit to operate each conveyance shall be $50.00.
SPS 302.15 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; am. (3) and r. Table 2.15-2,
Register, October, 1996, No. 490, eff. 11-1-96; emerg. r. and recr., eff. 6-1-97; r. and recr.,
Register, January, 1998, No. 505, eff. 2-1-98; am. (1) and (3),
Register, November, 1999, No. 527, eff. 12-1-99; am. (1) to (3), cr. (2m),
Register, July, 2000, No. 535, eff. 9-1-00; correction in (1) made under s. 13.93 (2m) (b) 7., Stats.,
Register November 2004 No. 587;
CR 05-038: am. Table 2.15-1, Table 2.15-2, and (2m)
Register October 2005 No. 598, eff. 11-1-05;
CR 08-039: am. (1) and (2), r. Tables 2.15-1 and 2.15-2, cr. Table 2.15, renum. (2m) and (3) to be (3) and (4)
Register November 2008 No. 635, eff. 12-1-08;
CR 09-050: am. (4)
Register December 2009 No. 648, eff. 1-1-10; correction in (1), (2) made under s. 13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672; correction in (1) made under s. 13.92 (4) (b) 7., Stats.,
Register December 2017 No. 744. -
See PDF for table SPS 302.17(1)(1)
Submittal requirements. The person or firm operating the crushing, screening or washing equipment shall submit, with the fee specified in sub.
(2), the name of the mine, pit or quarry; the name of the company; the mailing address; the telephone number; and the type of product to be mined, such as ore, stone, clay, lime or aggregate.
SPS 302.17(2)
(2)
Safety service. The annual safety service fee for each metal or nonmetal mine, pit or quarry shall be based on the size of the respective operation for the calendar year. Production records shall be made available upon request. The fee shall be determined in accordance with Table 302.17. This fee does not apply to mines, pits or quarries used for private domestic use.
SPS 302.17 Note
Note: The department intends to review the fees in Table 302.17 with the Mines, Pits and Quarries Advisory Council by June 1, 2001, and annually thereafter.
-
See PDF for table SPS 302.17(3)
(3)
Shaft excavation permit. The fee for obtaining a shaft excavation permit shall be $400.00 per permit.
SPS 302.17(4)
(4)
Miscellaneous inspections. The fee for miscellaneous consultation inspections provided on request shall be in accordance with s.
SPS 302.04 (2).
SPS 302.17(5)
(5)
Training. The fee for annual refresher training provided by the department and required by the federal mine safety and health administration shall be $330.00 per course.
SPS 302.17 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; am. (1) and (2) and Table 2.17, renum. (3) (a) and (c) to be (3) and (4) and am., r. (3) (b) and (4),
Register, July, 2000, No. 535, eff. 9-1-00;
CR 02-042: am. Table 2.17 and (5),
Register October 2002 No. 562, eff. 11-1-02;
CR 08-039: am. Table 2.17
Register November 2008 No. 635, eff. 12-1-08; correction in (2), (4) made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 302.18(1)(1)
Use. Fees for conducting a safety inspection of the use of explosive materials shall be assessed in accordance with s.
SPS 302.04 (2). Use of explosive materials shall include the storage of daily supplies.
SPS 302.18(2)
(2)
Permanent storage. Fees for conducting a safety inspection of a permanent explosive materials storage facility shall be determined in accordance with Table 302.18. The fees are based on the combined volume of one or more magazines at any given site. This inspection fee applies to blasters and explosive materials contractors working independently of mine, pit or quarry operations.
-
See PDF for table SPS 302.18(3)
(3)
Temporary storage in a community. Fees for department costs incurred in the performance of safety inspections of temporary explosive materials storage magazines in a community shall be $80.00 per magazine.
SPS 302.18 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; r. (1) and Table 2.18-1,
Register, October, 1996, No. 490, eff. 11-1-96; renum. (2) to be (1) to (3) and am., am. Table 2.18,
Register, July, 2000, No. 535, eff. 9-1-00;
CR 08-039: am. Table 2.18
Register November 2008 No. 635, eff. 12-1-08; correction in (1), (2) made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 302.19
SPS 302.19 Fireworks manufacturing plants. Fees for department costs incurred in the performance of inspection of fireworks manufacturing plants shall be determined in accordance with s.
SPS 302.04 (2).
SPS 302.19 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; r. (2),
Register, October, 1996, No. 490, eff. 11-1-96; am.
Register, July, 2000, No. 535, eff. 9-1-00; correction made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 302.20(1)(1)
Plan examination, data review, registration and inspections. Fees for amusement rides shall be determined in accordance with the following schedule:
SPS 302.20(1)(a)
(a) Plan examination for new amusement ride tramways
$280.00 per plan submittal.
SPS 302.20 Note
Note: See ch.
SPS 333 for definitions of tramways.
SPS 302.20(1)(b)
(b) Review of engineering analysis and test data associated with the acceptance of amusement rides
$280.00 per ride.
SPS 302.20(1)(c)2.
2. Late registration fee for failure to register amusement ride before opening it to the public
$200.00 per ride.
SPS 302.20(1)(e)
(e) Periodic inspection of coin operated kiddie rides
$70.00 per ride.
SPS 302.20(1)(f)
(f) Periodic inspection of Class 1 amusement rides
$140.00 per ride.
SPS 302.20(1)(g)
(g) Periodic inspection of Class 2 amusement rides, except amusement rides that the manufacturer estimates require more than 40 work hours for erection
$250.00 per ride.
SPS 302.20(1)(h)
(h) Periodic inspection of Class 2 amusement rides that the manufacturer estimates require more than 40 work hours for erection
$350.00 per ride.
SPS 302.20(1)(i)
(i) Periodic inspection of amusement ride tramways
$420.00 per tramway.
SPS 302.20(1)(j)
(j) Reinspection fee for noncompliance with orders previously issued by the department
$100.00 per ride.
SPS 302.20 Note
Note: See ch.
SPS 334 for definitions of ride classes.
SPS 302.20(2)
(2)
Fee assessment and collection. Registration and outstanding inspection fees for amusement rides shall be paid before registration is processed by the department.
SPS 302.20 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; am. (1),
Register, July, 2000, No. 535, eff. 9-1-00;
CR 08-039: am. (1) (a), (b) and (2), renum. (1) (c), (d) to (h) and (k) to be (1) (c) 1., (e) to (i) and (j) and am., cr. (1) (c) 2. and (d), r. (1) (i) and (j)
Register November 2008 No. 635, eff. 12-1-08; correction in (1) (d) made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 302.21(1)(1)
Plan examination fee. Fees for the examination of plans for passenger ropeways shall be determined in accordance with Table 302.21-1.
-
See PDF for table SPS 302.21 Note
Note: See ch.
SPS 334 for definition of the term “Amusement Ride" as it applies to passenger ropeways used as amusement rides.
SPS 302.21 Note
Note: Surface tows include T-bar, platter and similar devices.
SPS 302.21(2)
(2)
Inspection fees. Fees for the inspection of new installations, annual inspections and other inspections of passenger ropeways shall be determined in accordance with Table 302.21-2.
-
See PDF for table SPS 302.21 Note
Note: See ch.
SPS 334 for definition of the term “Amusement Ride" as it applies to passenger ropeways used as amusement rides.
SPS 302.21 Note
Note: Surface tows include T-bar, platter and similar devices.
SPS 302.21(3)
(3)
Load test fee. The fee for certifying a load test of a passenger ropeway shall be $420.00 per load test.
SPS 302.21(4)
(4)
Permit to operate. The fee for the issuance of a permit to operate each passenger ropeway shall be $50.00.
SPS 302.21 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; am. (3), (4), Tables 2.21-1 and 2.21-2,
Register, July, 2000, No. 535, eff. 9-1-00;
CR 00-132: am.
Register August 2001 No. 548, eff. 9-1-01;
CR 08-039: am. (3) and Tables 2.21-1 and 2.21-2
Register November 2008 No. 635, eff. 12-1-08;
CR 09-050: am. (4)
Register December 2009 No. 648, eff. 1-1-10; correction in (1), (2) made under s.
13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672.
SPS 302.31
SPS 302.31 Buildings, structures, heating, ventilation and fire protection systems. SPS 302.31(1)(a)(a) General. Fees relating to the submittal of all plans, submitted in accordance with the requirements of chs.
SPS 361 to
366, shall be determined in accordance with this section.
SPS 302.31(1)(b)
(b)
Plan review fees. Fees relating to the submittal of all building plans, heating, ventilating and air conditioning (HVAC) plans, and fire protection system plans shall be computed on the basis of the total gross square footage of each building or affected area. The fees shall be determined in accordance with Table 302.31-1 for buildings not located in municipalities that have assumed building inspection responsibilities. The fees shall be determined in accordance with Table 302.31-2 for buildings located in agent municipalities and counties that have assumed the building inspection responsibilities specified under s.
101.12 (3) (g), Stats., and ch.
SPS 361.
SPS 302.31(1)(c)
(c)
Multiple identical buildings. The fees set forth in this paragraph may be applied to a project which contains multiple identical buildings. In order to qualify for the multiple identical building fee, plans for all buildings shall be submitted at the same time. The fees for the submittal of plans for the first building shall be determined in accordance with Table 302.31-1 or 302.31-2 on the basis of the total gross area of one building. The fee for each of the remaining identical buildings shall be computed on the basis of an area of less than 2,500 square feet.
SPS 302.31(1)(d)
(d)
Miscellaneous plans. The fee for miscellaneous plans shall be $250 per plan. Miscellaneous plans are plans which have no building, HVAC or fire protection system plan submissions and those plans for which no area may be associated. Miscellaneous plans include, but are not limited to, all of the following:
SPS 302.31(1)(d)1.
1. Footing and foundation plans submitted prior to the submission of the building plans.
SPS 302.31(1)(d)3.
3. Stadium, grandstand and bleacher plans, and interior bleacher plans submitted as independent projects.
SPS 302.31(1)(d)4.
4. Any building component, other than building, HVAC and fire protection systems, submitted after installation.
SPS 302.31(1)(e)
(e)
Permission to start construction. The fee for a permission to start construction shall be $75.00.
SPS 302.31(1)(f)
(f)
Revisions. The fee for revisions to previously approved plans and plans that have been previously reviewed but not denied shall be $75.00.
SPS 302.31(1)(g)
(g)
Second class city. A second class city that is certified to perform the expanded plan examinations specified in s.
SPS 361.60 (5) (b) shall submit to the department the fee specified in Table 302.31-3 for each building or structure reviewed which exceeds the limits specified in s.
SPS 361.60 (5) (c).
SPS 302.31(1)(h)
(h)
Appointed agent. An agent that is appointed by the department under s.
101.12 (3g), stats., to perform plan examinations shall submit to the department the fees specified in Table 302.31-3 for each building or structure reviewed under s.
101.12 (3g), Stats.
SPS 302.31(1)(i)
(i)
Resubmission. The fee for building, HVAC or fire protection system plans resubmitted within 8 months following denial of plan approval shall be $250 per plan.
SPS 302.31(2)
(2)
Fee for plan entry. In addition to the plan review and inspection fees for a project, each separate submission of plans for the project shall be accompanied by a $100.00 plan entry fee. When plans for multiple projects are submitted together, each project shall constitute a separate submission and requires a $100.00 plan entry fee.
SPS 302.31 Note
Note: For example, the total fee to be submitted under Table 302.31-1 for a 15,000 square foot building that includes building plans, HVAC plans, fire alarm plans and fire suppression plans would be $800 + $450 + $200 + $200 + $100 = $1,750.
SPS 302.31(3)
(3)
Fee for missing a plan review appointment. A fee of $60.00 may be charged for missing a plan review appointment that was processed and scheduled by the department.
SPS 302.31(4)
(4)
Reinspection fee. A fee as specified in s.
SPS 302.04 (2) shall be assessed for inspections made by the department to gain compliance with rules after orders have been issued by the department.
SPS 302.31(5)
(5)
Completion statement. A fee of $15.00 shall be assessed for any project where the department has issued orders for a completion statement to be submitted as required by s.
SPS 361.40.
SPS 302.31(6)
(6)
Fee refunds. The department may refund the difference in fees between Tables 302.31-1 and 302.31-2 for projects that are abandoned prior to construction.
SPS 302.31 History
History: Cr.
Register, June, 1992, No. 438, eff. 7-1-92; am. (1) (intro.),
Register, March, 1995, No. 471, eff. 4-1-95; cr. (1) (a) 2. g.; r. and recr. Table 2.31-1 and 2.31-2,
Register, February, 1997, No. 494, eff. 4-1-97; correction in (1) (intro.) made under s. 13.93 (2m) (b) 7., Stats.,
Register, November, 1999, No. 527; r. and recr. (1), (2) and Tables 2.31-1 and 2.31-2; cr. Table 2.31-3,
Register, July, 2000, No. 535, eff. 9-1-00;
CR 01-139: am. (1) (a), (b), (g), (h), (i), (3) and (5)
Register June 2002 No. 558, eff. 7-1-02; corrections in (1) (g) and (h) made under s. 13.93 (2m) b) 7., Stats.,
Register January 2005 No. 589;
CR 05-038: r. and recr. (2), cr. (2m), r. (3)
Register October 2005 No. 598, eff. 11-1-05;
CR 06-119: am. tables 2.31-1 to 2.31-3
Register July 2007 No. 619, eff. 8-1-07;
CR 06-120: am. (1) (a),
Register February 2008 No. 626, eff. 3-1-08;
CR 08-039: am. (1) (d) to (f), (i), (5) and Tables 2.31-1, 2.31-2 and 2.31-3, renum. (2m) to be (3)
Register November 2008 No. 635, eff. 12-1-08;
CR 09-046: am. (1) (d) 6. and Table 2.31-1,
Register March 2010 No. 651, eff. 4-1-10;
CR 10-103: am. (1) (a) and (d), r. and recr. (1) (i),
Register August 2011 No. 668, eff. 9-1-11; correction in (1) (a), (b), (c), (g), (h), (4), (5), (6) made under s. 13.92 (4) (b) 7., Stats.,
Register December 2011 No. 672;
2017 Wis. Act 198: am. (1) (h)
Register April 2018 No. 748, eff. 5-1-18.