SB55-ASA1,489,1715
29.347
(5) (b) (intro.) No person may
retain take possession of the carcass of
16a deer killed in the manner specified in par. (a) and remove the carcass from the scene
17of the accident unless one of the following apply:
SB55-ASA1, s. 732
18Section
732. 29.563 (4) (b) 1. of the statutes is amended to read:
SB55-ASA1,489,2019
29.563
(4) (b) 1. Sports:
$248.25
$238.25 or a greater amount at the applicant's
20option.
SB55-ASA1,490,2
2229.565 Voluntary contributions; venison processing and grant
23program. (1) Any applicant for a hunting license listed under s. 29.563 (2) (a) or
24(b) may, in addition to paying any fee charged for the license, elect to make a
1voluntary contribution of at least $1 to be used for the venison processing and
2donation program under s. 29.89.
SB55-ASA1,490,4
3(2) All moneys collected under sub. (1) shall be credited to the appropriation
4account under s. 20.370 (5) (ft).
SB55-ASA1,490,6
629.566 (title)
Collection, retention, and deposit of fees.
SB55-ASA1,490,158
29.566
(1m) Transaction payments. The department shall establish a system
9under which the department pays each agent appointed under s. 29.024 (6) (a) 2. or
103. a payment of $1.50 for each time that the agent processes a transaction through
11the statewide automated system contracted for under s. 29.024 (6) (a) 4. This
12payment is in addition to any issuing fee, processing fee, or handling fee retained by
13the agent. The department shall make these payments by allowing the agent to
14retain an amount equal to the payments from the amounts that are collected by the
15agent and that would otherwise be remitted to the department.
SB55-ASA1,490,2017
29.569
(3) (b)
Restrictions on issuance of sturgeon spearing licenses during the
18open season. No Except as provided in par. (bm), no sturgeon spearing license may
19be issued during
a period beginning on October 1 and ending on the last day of the
20open season for the spearing of rock or lake sturgeon
that follows that October 1.
SB55-ASA1,490,2422
29.569
(3) (bm)
Exceptions. A sturgeon spearing license may be issued during
23a period beginning on October 1 and ending on the last day of the open season for the
24spearing of rock or lake sturgeon that follows that October 1 to any of the following:
SB55-ASA1,491,3
11. A person who is a member of the U.S. armed forces and who exhibits proof
2that he or she is a resident, is in active service with the armed forces outside this
3state, and is on furlough or leave.
SB55-ASA1,491,54
2. A person who is a resident and who has attained the age of 14 during that
5period.
SB55-ASA1,491,107
29.604
(2) (am) "State agency" means a board, commission, committee,
8department or office in the state government
or the Fox River Navigational System
9Authority. "State agency" does not include the department of natural resources or
10the office of the governor.
SB55-ASA1,491,1512
29.741
(2) No person shall take, remove, sell, or transport from the public
13waters of this state
to any place beyond the borders of the state, any duck potato, wild
14celery, or any other plant or plant product except wild rice native in said waters and
15commonly known to furnish food for game birds.
SB55-ASA1,491,17
1729.89 (title)
Venison processing grants and donation program.
SB55-ASA1,491,2119
29.89
(2) Establishment of program. The department shall establish a
20program to reimburse counties for the costs that they incur in processing
and
21donating venison from certain deer carcasses.
SB55-ASA1,491,2423
29.89
(3) (b) The county accepts deer carcasses for processing
and pays for the
24costs of processing.
SB55-ASA1,492,2
129.89
(3) (e) The
processed venison is donated county shall make reasonable
2efforts to donate the venison as provided under sub. (4).
SB55-ASA1, s. 740
3Section
740. 29.89 (5) (title) of the statutes is amended to read:
SB55-ASA1,492,44
29.89
(5) (title)
Grants; amounts Reimbursement; funding.
SB55-ASA1,492,96
29.89
(5) (a)
Reimbursement Subject to par. (c), reimbursement under this
7section shall equal the
amount that it costs costs, including administrative costs,
8that a county
to process incurs in processing the venison
and in donating the
9processed venison under sub. (4).
SB55-ASA1,492,1411
29.89
(5) (b) The department shall reimburse counties under this section from
12the appropriation under s. 20.370 (5)
(fq) after first deducting from s. 20.370 (5) (fq)
13payments made for county administrative costs, payments made for wildlife damage
14abatement assistance and wildlife damage claim payments under s. 29.889 (ft).
SB55-ASA1,492,1916
29.89
(5) (c) If the total amount of reimbursable costs under par. (a) exceeds the
17amount available
after making the deductions under par. (b), the department shall
18establish a system to prorate the reimbursement payments among the eligible
19counties.
SB55-ASA1,493,221
29.971
(11m) (c) Any person who is convicted of hunting bear or engaging in
22any of the activities under s. 29.184 (3) (br)
with a dog that and who is not in
23compliance with s. 29.184 (4) or the licensing requirements under s. 174.053 or
24174.07 may have his or her Class A or Class B bear hunting license revoked; and if
1the license is revoked, no Class A or Class B bear hunting license may be issued to
2the person for a period of 3 years after the date of conviction.
SB55-ASA1,493,64
30.12
(3) (br) A riparian owner is exempt from the permit requirements under
5sub. (2) and this subsection for a structure that the riparian owner places beyond the
6high-water mark of a navigable water if all of the following conditions apply:
SB55-ASA1,493,87
1. The structure is a vertical wall designed to prevent land from eroding into
8the navigable water.
SB55-ASA1,493,109
2. The area exposed by grading or removing top soil for construction of the
10structure does not exceed 10,000 square feet.
SB55-ASA1,493,1511
3. No later than 30 days after the date on which the riparian owner completes
12placement of the structure, the riparian owner replaces any material that was
13removed from the bed of the navigable water in the course of placement of the
14structure with comparable material or riprap, if the material removed was between
15the structure and the ordinary high-water mark.
SB55-ASA1,493,1716
4. The structure incorporates adequate bracing and anchors to ensure
17structural stability.
SB55-ASA1,493,1918
5. A filter fabric lining containing a layer of gravel extends from the landward
19side of the structure to facilitate drainage.
SB55-ASA1,493,2220
6. The base of the structure extends to a sufficient depth into the bed of the
21navigable water to ensure the structure's stability and to prevent the structure from
22failing.
SB55-ASA1,493,2423
7. The structure is secured into the bank of the navigable water in a manner
24that prevents erosion or scouring.
SB55-ASA1,494,4
130.12
(3) (bt) A riparian owner is exempt from the permit requirements under
2sub. (2) and this subsection for a structure that is placed on the bed of a navigable
3water in the Wolf River and Fox River basin area, as described in s. 30.207 (1), and
4that extends beyond the ordinary high-water mark, if the following conditions apply:
SB55-ASA1,494,65
1. The structure is a vertical wall designed to prevent land from eroding into
6a navigable water.
SB55-ASA1,494,107
2. The structure is not a replacement for an existing structure and is placed on
8the bed of an artificial enlargement of a navigable water, or the structure is a
9replacement for an existing structure placed on the bed of a navigable water,
10including the bed of an artificial enlargement of a navigable water.
SB55-ASA1,494,1311
3. If the structure is a replacement for an existing structure placed on the bed
12of a navigable water, including the bed of an artificial enlargement of a navigable
13water, it is placed not more than 2 feet waterward of the structure that it is replacing.
SB55-ASA1,494,1514
4. The structure incorporates adequate bracing and anchors to ensure
15structural stability.
SB55-ASA1,494,1716
5. A filter fabric lining containing a layer of gravel extends from the landward
17side of the structure to facilitate drainage.
SB55-ASA1,494,2018
6. The base of the structure extends to a sufficient depth into the bed of the
19navigable water to ensure the structure's stability and to prevent the structure from
20failing.
SB55-ASA1,494,2221
7. The structure is secured into the bank of the navigable water in a manner
22that prevents erosion or scouring.
SB55-ASA1,495,223
8. The riparian owner places riprap at the base of the waterward side of the
24structure up to the waterline or, if the structure is placed in a location where
25watercraft are moored, the riparian owner places riprap at the base of the waterward
1side of the structure up to a point that allows adequate space for the mooring of
2watercraft.
SB55-ASA1,495,43
9. The structure is constructed of treated wood and built so that the top of the
4structure meets the lower of the following:
SB55-ASA1,495,55
a. The natural topography of the bank of the navigable water.
SB55-ASA1,495,76
b. A point that is 4 feet above the ordinary high-water mark of the navigable
7water.
SB55-ASA1,495,88
c. The minimum height required to prevent overtopping by wave action.
SB55-ASA1, s. 743
9Section
743. 30.124 (1) (intro.) of the statutes is amended to read:
SB55-ASA1,495,1410
30.124
(1) (intro.) Notwithstanding ss. 30.12,
30.125, 30.20, 30.44
, and 30.45
, 11and if the department finds that the activity will not adversely affect public or private
12rights or interests in fish and wildlife populations, navigation
, or waterway flood
13flow capacity and will not result in environmental pollution, as defined in s. 299.01
14(4), the department may do all of the following on public lands or waters:
SB55-ASA1,495,1816
30.124
(1) (a) Cut aquatic
vegetation
plants, as defined in s. 30.715 (1) (a), 17without removing
the vegetation them from the water, for the purpose of improving
18waterfowl nesting, brood
, and migration habitat.
SB55-ASA1,495,23
2130.2025 Lake Koshkonong comprehensive project. (1) Definition. In
22this section, "district" means the Rock-Koshkonong public inland lake protection
23and rehabilitation district.
SB55-ASA1,496,3
1(2) Authorization. The district may implement a project developed and
2approved by the U.S. army corps of engineers to place structures, or fill, or both on
3the bed of Lake Koshkonong for any of the following purposes:
SB55-ASA1,496,44
(a) To improve navigation or to provide navigation aids.
SB55-ASA1,496,55
(b) To restore or protect wetland habitat or water quality.
SB55-ASA1,496,66
(c) To create, restore, or protect fish and wildlife habitat.
SB55-ASA1,496,87
(d) To enhance the natural aesthetic value or improve the recreational use of
8the lake.
SB55-ASA1,496,11
9(3) Location of structures and fill. Any structure or fill placed as part of the
10project authorized under sub. (2) shall be located in Lake Koshkonong within the
11area that consists of Secs. 10, 13, 18, 19, 20, 24, 33, and 35, T 5 N., R 13.
SB55-ASA1,496,15
12(4) Preliminary requirements. (a) Before beginning any activity involving the
13placement of a structure or fill as part of the project authorized under sub. (2), the
14district shall submit plans and specifications for the project to the department and
15obtain the department's approval for the project.
SB55-ASA1,496,1716
(b) Before the department gives its approval for a project authorized under sub.
17(2), the department shall do all of the following:
SB55-ASA1,496,1818
1. Comply with the requirements under s. 1.11.
SB55-ASA1,496,2119
2. Review the plans and specifications submitted to the department under par.
20(a) and obtain any other information that it determines is necessary to effectively
21evaluate the structural and functional integrity of the structure or fill.
SB55-ASA1,496,2322
3. Hold a public informational meeting to discuss the plans and specifications
23submitted under par. (a).
SB55-ASA1,496,2524
4. Determine that the structure or fill is structurally and functionally sound
25and that the structure or fill will comply with the requirements under sub. (5).
SB55-ASA1,497,2
1(5) Requirements for structures and fill. A structure or fill placed as part
2of a project authorized under sub. (2) shall meet all of the following requirements:
SB55-ASA1,497,33
(a) It may not materially affect the flood flow capacity of the Rock River.
SB55-ASA1,497,44
(b) It may not materially obstruct navigation.
SB55-ASA1,497,75
(c) It may not cause material injury to the rights of an owner of lands
6underlying the structure or fill or to the rights of a riparian owner who owns lands
7affected by the project.
SB55-ASA1,497,88
(d) It may not cause environmental pollution, as defined in s. 299.01 (4).
SB55-ASA1,497,99
(e) It may not be detrimental to the public interest.
SB55-ASA1,497,1010
(f) It must further a purpose specified in sub. (2).
SB55-ASA1,497,13
11(6) Maintenance by the district. (a) The district shall maintain the structures
12and the fill that are part of the project authorized under sub. (2) to ensure that the
13structures and fill do not impair the safety of the public.
SB55-ASA1,497,1614
(b) The district shall maintain the structures and the fill that are part of the
15project authorized under sub. (2) so that the structures and fill remain in compliance
16with the requirements listed under sub. (5).