AB632-ASA1, s. 34 17Section 34. 196.49 (4) of the statutes is created to read:
AB632-ASA1,18,2118 196.49 (4) The commission may not issue a certificate under sub. (1), (2), or (3)
19for the construction of electric generating equipment and associated facilities unless
20the commission determines that brownfields, as defined in s. 560.13 (1) (a), are used
21to the extent practicable.
AB632-ASA1, s. 35 22Section 35. 196.491 (3) (a) 1. of the statutes is amended to read:
AB632-ASA1,19,723 196.491 (3) (a) 1. No Except as provided in sub. (3b), no person may commence
24the construction of a facility unless the person has applied for and received a
25certificate of public convenience and necessity from the commission as provided in

1this section
under this subsection. An application for a certificate issued under this
2subsection shall be
in the form and containing contain the information required by
3commission rules for such certificate and shall be filed with the commission not less
4than 6 months prior to the commencement of construction of a facility. Within 10
5days after filing the an application under this subdivision, the commission shall send
6a copy of the application to the clerk of each municipality and town in which the
7proposed facility is to be located and to the main public library in each such county.
AB632-ASA1, s. 36 8Section 36. 196.491 (3) (a) 3. a. of the statutes is amended to read:
AB632-ASA1,19,209 196.491 (3) (a) 3. a. At least 60 days before a person files an application under
10subd. 1., the person shall provide the department with an engineering plan showing
11if the facility is a large electric generating facility or a detailed project plan if the
12facility is a high-voltage transmission line. The engineering or project plan shall
13show
the location of the facility, a description of the facility, including the major
14components of the facility that have a significant air, water or solid waste pollution
15potential, and a brief description of the anticipated effects of the facility on air and
16quality, water quality, wetlands, solid waste disposal capacity, and other natural
17resources
. Within 30 days after a person provides an engineering or project plan, the
18department shall provide the person with a listing of each department permit or
19approval which, on the basis of the information contained in the engineering or
20project
plan, appears to be required for the construction or operation of the facility.
AB632-ASA1, s. 37 21Section 37. 196.491 (3) (b) of the statutes is amended to read:
AB632-ASA1,19,2522 196.491 (3) (b) The commission shall hold a public hearing on an application
23filed under par. (a) 1. that is determined or considered to be complete in the area
24affected pursuant to s. 227.44. A class 1 notice, under ch. 985, shall be given at least
2530 days prior to the hearing.
AB632-ASA1, s. 38
1Section 38. 196.491 (3) (d) (intro.) of the statutes is amended to read:
AB632-ASA1,20,52 196.491 (3) (d) (intro.) Except as provided under par. (e) and s. 196.493, the
3commission shall approve an application filed under par. (a) 1. for a certificate of
4public convenience and necessity only if the commission determines all of the
5following:
AB632-ASA1, s. 39 6Section 39. 196.491 (3) (d) 8. of the statutes is created to read:
AB632-ASA1,20,87 196.491 (3) (d) 8. For a large electric generating facility, brownfields, as defined
8in s. 560.13 (1) (a), are used to the extent practicable.
AB632-ASA1, s. 40 9Section 40. 196.491 (3) (e) of the statutes is amended to read:
AB632-ASA1,20,1610 196.491 (3) (e) If the an application filed under par. (a) 1. does not meet the
11criteria under par. (d), the commission shall reject the application or approve the
12application with such modifications as are necessary for an affirmative finding under
13par. (d). The commission may not issue a certificate of public convenience and
14necessity under this subsection until the department has issued all permits and
15approvals identified in the listing specified in par. (a) 3. a. that are required prior to
16construction.
AB632-ASA1, s. 41 17Section 41. 196.491 (3) (g) 1. of the statutes is renumbered 196.491 (3) (g) and
18amended to read:
AB632-ASA1,21,419 196.491 (3) (g) The commission shall take final action on an application filed
20under par. (a) 1.
within 180 days after the application is determined or considered
21to be complete under par. (a) 2. If the commission fails to take final action within the
22180-day period, the commission is considered to have issued a certificate of public
23convenience and necessity with respect to the application, unless the commission,
24within the 180-day period, petitions the circuit court for Dane County for an
25extension of time for taking final action on the application and the court grants an

1extension. Upon a showing of good cause, the court may extend the 180-day period
2for no more than an additional 180 days . If the commission fails to take final action
3within the extended period, the commission is considered to have issued a certificate
4of public convenience and necessity with respect to the application.
AB632-ASA1, s. 42 5Section 42. 196.491 (3) (g) 1m. of the statutes is repealed.
AB632-ASA1, s. 43 6Section 43. 196.491 (3) (gm) of the statutes is amended to read:
AB632-ASA1,21,217 196.491 (3) (gm) The commission may not approve an application filed after
8October 29, 1999, under this section subsection for a certificate of public convenience
9and necessity for a high-voltage transmission line that is designed for operation at
10a nominal voltage of 345 kilovolts or more unless the approval includes the condition
11that the applicant shall pay the fees specified in sub. (3g) (a). If the commission has
12approved an application under this section subsection for a certificate of public
13convenience and necessity for a high-voltage transmission line that is designed for
14operation at a nominal voltage of 345 kilovolts or more that was filed after
15April 1, 1999, and before October 29, 1999, the commission shall require the
16applicant to pay the fees specified in sub. (3g) (a). For any application subject to this
17paragraph, the commission shall determine the cost of the high-voltage
18transmission line, identify the counties, towns, villages and cities through which the
19high-voltage transmission line is routed and allocate the amount of investment
20associated with the high-voltage transmission line to each such county, town, village
21and city.
AB632-ASA1, s. 44 22Section 44. 196.491 (3) (h) of the statutes is renumbered 196.491 (6).
AB632-ASA1, s. 45 23Section 45. 196.491 (3) (j) of the statutes is amended to read:
AB632-ASA1,22,324 196.491 (3) (j) Any person whose substantial rights may be adversely affected
25or any county, municipality or town having jurisdiction over land affected by a

1certificate of public convenience and necessity for which an application is filed under
2par. (a) 1.
may petition for judicial review, under ch. 227, of any decision of the
3commission regarding the certificate.
AB632-ASA1, s. 46 4Section 46. 196.491 (3b) of the statutes is created to read:
AB632-ASA1,22,95 196.491 (3b) Expedited review. (a) A person who proposes to construct a
6high-voltage transmission line may apply for a certificate under this subsection if
7the construction is limited to adding conductors to existing transmission poles or
8towers and if all related construction activity takes place entirely within the area of
9an existing electric transmission line right-of-way.
AB632-ASA1,22,1310 (b) The commission shall promulgate rules specifying the information that
11must be included in an application under this subsection. If the commission receives
12an application that complies with rules, the commission shall, as soon as practicable,
13notify the applicant that the commission has received a complete application.
AB632-ASA1,22,1914 (c) The commission is considered to have issued a certificate of public
15convenience and necessity under sub. (3) for construction specified in an application
16under par. (a) unless the commission notifies the applicant, no later than 30 business
17days after the date on which the commission notifies an applicant under par. (b) that
18the application is complete, that the commission has determined that the public
19interest requires the applicant to obtain a certificate under s. 196.49.
AB632-ASA1, s. 47 20Section 47. 196.491 (4) (c) of the statutes is renumbered 196.491 (4) (c) 1. and
21amended to read:
AB632-ASA1,22,2522 196.491 (4) (c) 1. A certificate under sub. (3) is not required for a person to
23construct a high-voltage transmission line designed for operation at a nominal
24voltage of less than 230 345 kilovolts if all related construction activity takes place
25entirely within the area of an existing electric transmission line right-of-way.
AB632-ASA1, s. 48
1Section 48. 196.491 (4) (c) 2. of the statutes is created to read:
AB632-ASA1,23,52 196.491 (4) (c) 2. The commission is not required to prepare an environmental
3impact statement under under s. 1.11 (2) (c) for construction that is specified in subd.
41., but shall prepare an environmental assessment regarding the construction if an
5environmental assessment is required under the commission's rules.
AB632-ASA1, s. 49 6Section 49. 196.491 (4) (c) 3. of the statutes is created to read:
AB632-ASA1,23,97 196.491 (4) (c) 3. If construction or utilization of a high-voltage transmission
8line described in subd. 1. is precluded or inhibited by a local ordinance, the
9construction and utilization of the line may nevertheless proceed.
AB632-ASA1, s. 50 10Section 50. 196.491 (6) (title) of the statutes is created to read:
AB632-ASA1,23,1111 196.491 (6) (title) Waiver.
AB632-ASA1, s. 51 12Section 51. Initial applicability.
AB632-ASA1,23,1513 (1) Utility aid payments. The treatment of section 79.04 (6) (c) 3. and (7) (c) 1m.
14and (d) of the statutes first applies to distributions made on the 4th Monday of July
152005.
AB632-ASA1,23,2016 (2) Department of natural resources procedures. The treatment of sections
1730.02 (1) and (2), 30.025 (title), (1), (1b), (1e), (1m), (1s) (title) and (b), (2), (2g), (2s),
18(3) (intro.), (3m), and (4), and 30.206 (1m) of the statutes first applies to applications
19for permits, as defined in section 30.025 (1b) (b) of the statutes, as created by this act,
20filed with the department of natural resources on the effective date of this subsection.
AB632-ASA1,24,221 (3) Public service commission procedures. The treatment of sections 196.49
22(4) and 196.491 (3) (a) 1. and 3. a., (b), (d) (intro.) and 8., (e), (g) 1. and 1m., (gm), and
23(j), (3b), and (4) (c) 2. and 3. of the statutes and the renumbering and amendment of

1section 196.491 (4) (c) of the statutes first apply to applications submitted on the
2effective date of this subsection.