SB185-SSA1-SA3,1,11
6"(d) The commission shall promulgate rules requiring the owner of a wind
7energy system to maintain proof of financial responsibility ensuring the availability
8of funds for decommissioning the wind energy system upon discontinuance of use of
9the wind energy system. The rules may require that the proof can be established by
10a bond, deposit, escrow account, irrevocable letter of credit, or other financial
11commitment specified by the commission.".
SB185-SSA1-SA3,2,4
2"
(1m) The treatment of section 196.378 (4g) (d) of the statutes first applies to
3wind energy systems that commence operation on the effective date of this
4subsection.".