AB426-SSA2,91,1917 L. Leachate collection, control, and treatment systems, including any pipes,
18manholes, trenches, berms, collection sumps or basins, pumps, risers, liners, and
19liner splices.
AB426-SSA2,91,2020 m. Leachate and groundwater monitoring devices and systems.
AB426-SSA2,91,2121 n. Disposal areas for severe weather operations.
AB426-SSA2,91,2222 o. Support buildings, utilities, gates, and signs.
AB426-SSA2,91,2323 p. Handling areas for the segregation of various types of mining waste.
AB426-SSA2,91,2424 q. Construction notes and references to details.
AB426-SSA2,92,2
1r. On the appropriate plan sheet, the location of each cross-section under subd.
29., with the section labeled using the mining waste site grid system.
AB426-SSA2,92,123 9. A series of mining waste site cross-sections, drawn perpendicular and
4parallel to the mining waste site baseline at a maximum distance of 500 feet between
5cross-sections and at points of important construction features, each cross-section
6showing, where applicable: existing and proposed base and final grades; soil borings
7and monitoring wells that the section passes through or is adjacent to; soil types,
8bedrock, and water table; leachate control, collection, and monitoring systems;
9quantity of mining waste and area filled by each major mining waste type; drainage
10control structures; access roads and ramps on the mining waste site perimeter and
11within the active fill area; the filling sequence or phases; and other appropriate site
12features.
AB426-SSA2,92,1513 10. Drawings and typical sections for, as appropriate, drainage control
14structures, tailings distribution systems, access roads, fencing, leachate control
15systems and monitoring devices, buildings, signs, and other construction details.
AB426-SSA2,92,2116 (b) A plan for initial site preparations, including a discussion of the field
17measurements, photographs to be taken, and sampling and testing procedures to be
18used to verify that the in-field conditions encountered were the same as those
19defined in the mining waste site feasibility study and plan of operation and to
20document that the mining waste site was constructed according to the engineering
21plans and specifications submitted for department approval.
AB426-SSA2,93,322 (c) A description of typical daily operations, including a discussion of the
23timetable for development; methods for determining mining waste types disposed of
24or excluded; typical mining waste handling techniques; hours of operation; traffic
25routing; drainage and erosion control; windy, wet, and cold weather operations; fire

1protection equipment; methods for dust control; method of placing mining waste
2materials; monitoring; closure of filled areas; leachate control methods; and critical
3backup equipment.
AB426-SSA2,93,64 (d) An analysis of the financial responsibility for closure and long-term care
5from the time of closing of the mining waste site to termination of the obligation to
6maintain proof of financial responsibility for long-term care.
AB426-SSA2,93,87 (e) A description of procedures for backfilling all soil borings and monitoring
8wells when they are abandoned.
AB426-SSA2,93,129 (f) A contingency plan to prevent or minimize damage to human health or the
10environment in the event of an accidental or emergency discharge or other condition
11that does not comply with conditions of the mining permit or other applicable
12standards. The applicant shall ensure that the plan does all of the following:
AB426-SSA2,93,1413 1. Follows the spill prevention, control, and countermeasures plan in
14regulations promulgated under 33 USC 1321.
AB426-SSA2,93,1715 2. Indicates, for the monitoring programs required under sub. (5) (o) 8., the
16levels of substances that if exceeded require the operator to activate the contingency
17plan.
AB426-SSA2,93,1918 3. Includes a provision for more concentrated and frequent monitoring in the
19area of any excessive measurement.
AB426-SSA2,93,2220 4. Describes possible accidental or emergency discharges or other unplanned
21events and identifies the corresponding corrective action or alternative action to be
22implemented should the criteria for action be exceeded.
AB426-SSA2,93,2423 5. Specifies the action to be taken if an analysis of groundwater samples
24requires a response.
AB426-SSA2,94,4
1(g) A list of the groundwater and surface water quality parameters for which
2the applicant will monitor under s. 295.643 and a description of the methods for
3groundwater and surface water sample collection, preservation, and analysis that
4will be used.
AB426-SSA2,94,9 5(7) Required demonstrations. Through the mining waste site feasibility study
6and plan of operation, the applicant shall demonstrate that all of the following apply
7or will apply with respect to the operation of the mining waste site, excluding the area
8from which ferrous minerals will be extracted and that is backfilled with mining
9waste:
AB426-SSA2,94,1310 (a) No mining waste will be deposited in such a way that the mining waste or
11leachate from the mining waste will result in a violation of any applicable surface
12water quality criteria or standards, applicable wetland water quality standards, or
13applicable groundwater quality standards.
AB426-SSA2,94,1514 (b) Surface water drainage will be diverted away from and off the active fill
15area.
AB426-SSA2,94,1716 (c) Access to the mining waste site will be restricted through the use of fencing,
17natural barriers, or other methods approved by the department.
AB426-SSA2,94,1918 (d) The entire perimeter of the mining waste site will be made accessible for
19inspection and for earth moving equipment required for emergency maintenance.
AB426-SSA2,94,2220 (e) Any area to be used for the disposal of mining waste and any borrow areas
21will first be stripped of all topsoil to ensure that adequate amounts are available for
22reclamation and closure activities.
AB426-SSA2,94,2423 (f) Effective means will be taken to control dust resulting from the mining
24waste site.
AB426-SSA2,95,2
1(g) Provisions will be made for back-up equipment in the event of the
2breakdown of critical operating equipment.
AB426-SSA2,95,63 (h) The design and operation specifications for mining waste site facilities
4include contingency measures, which may include emergency power supplies,
5redundant equipment, or temporary holding facilities, to deal with emergency
6conditions.
AB426-SSA2,95,117 (hm) Any mining waste site designed with a liner or situated in soils with
8sufficiently low permeability to either partially or completely contain leachate is
9designed with a leachate management system that can effectively remove leachate,
10prevent surface seepage, and promote adequate settlement to permit final
11reclamation.
AB426-SSA2,95,1512 (i) All surface water drainage ditches, culverts, and other drainage control
13structures are designed for a rainfall event measured in terms of the depth of the
14rainfall occurring within a 24-hour period and having an expected recurrence
15interval of once in 100 years.
AB426-SSA2,95,1816 (j) The final slopes of the completed mining waste site will be no less than 2
17percent and no greater than 50 percent, unless the mining waste site is specifically
18designed for a final use compatible with other slopes.
AB426-SSA2,95,2119 (k) The final cover design for the mining waste site is based on the results of
20the mining waste characterization and engineering needs identified in studying the
21mining waste site feasibility.
AB426-SSA2,95,2322 (L) Provisions are made for collection and treatment of leachate for all areas
23designed to contain leachate.
AB426-SSA2,96,3
1(m) The mining waste site is located and designed, and will be constructed and
2operated, so that any liner system or naturally occurring soil barrier is compatible
3with all mining waste that is disposed of or stored in the mining waste site.
AB426-SSA2,96,84 (n) For any dam, sufficient freeboard, measured from the inside of the top of
5the dam, to contain a rainfall event measured in terms of the depth of the rainfall
6occurring within a 24-hour period and having an expected recurrence interval of
7once in 100 years and to prevent overtopping by waves during such a rainfall event
8or a minimum of 2 feet of freeboard, whichever is greater, will be provided.
AB426-SSA2,96,109 (o) Drainage or filter bed material has been selected and designed to promote
10drainage, reduce the potential for piping, and be stable under leaching conditions.
AB426-SSA2,96,1411 (p) Material used in earth embankments, drainage, or filter beds, will be free
12of vegetation, organic soils, frozen soils, and other extraneous matter that could
13affect the compactibility, density, permeability, or shear strength of the finished
14embankment.
AB426-SSA2,96,2015 (q) Embankment materials and drainage or filter bed materials will be
16compacted to 90 percent of the maximum dry density as determined by the standard
17proctor compaction test, ASTM D698, or to a greater density as necessitated by the
18embankment height, and the materials will be compacted in appropriate layers as
19determined through the slope stability analysis, except that compaction and
20crushing of waste rock for use outside an earth core is not required.
AB426-SSA2,96,2221 (r) Emergency spill containment areas will be provided near the tailings
22pipeline in case of power or pipeline failure.
AB426-SSA2,96,2423 (s) Tailings pipelines will be self-draining to the tailings area or to an
24emergency spill containment area.
AB426-SSA2,97,4
1(t) The mining waste site is located in the same watershed as the surface
2facilities for the mining unless it is not practicable to locate the mining waste site in
3the same watershed as the surface facilities for the mining, as determined on a site
4specific basis.
AB426-SSA2,97,65 (u) The disposal of the mining waste will minimize the discharge of
6environmental pollutants to groundwater to the extent practicable.
AB426-SSA2,97,77 (w) Tailings pipelines are as short as practicable.
AB426-SSA2,97,88 (x) Upstream rainfall catchment areas are minimized.
AB426-SSA2,97,109 (y) The outside of the top of any dam is higher than the inside of the top of the
10dam so that runoff from the top is forced to the inside of the dam.
AB426-SSA2,97,1111 (z) The mining waste site design includes staged reclamation, if practicable.
AB426-SSA2,97,15 12(8) Limitation on regulation of certain mining waste. The department may
13not regulate the use of mining waste in reclamation or the construction of any facility
14or structure except through the department's review of the mining plan and
15reclamation plan and the approval of the application for the mining permit.
AB426-SSA2,97,19 16(9) Applicability of other laws. Subchapters I to V and VIII of ch. 289 and
17rules promulgated under those subchapters do not apply to a mining waste site, to
18the disposal of mining waste in a mining waste site, or to mining wastes used in the
19reclamation or construction of facilities and structures on the mining site.
AB426-SSA2,97,23 20295.53 Environmental impact statement. (1) Consultants. The
21department may enter into contracts for environmental consultant services under
22s. 23.41 to assist in the preparation of an environmental impact statement or to
23provide assistance to applicants.
AB426-SSA2,98,2 24(2) Notice. After the department receives an application for a mining permit,
25it shall notify the public and affected agencies that an environmental impact

1statement will be prepared for the proposed mine and that the process of identifying
2major issues under s. NR 150.21 (3), Wis. Adm. Code, is beginning.
AB426-SSA2,98,15 3(3) Environmental impact report. (a) An applicant shall prepare an
4environmental impact report for the mining project. In the environmental impact
5report, the applicant shall provide a description of the proposed mining project, the
6present environmental conditions in the area and the anticipated environmental
7impacts of the proposed mining project, the present socioeconomic conditions in the
8area and the anticipated socioeconomic impacts of the proposed mining project,
9details of any wetlands mitigation program under s. 295.60 (8), any measures for
10navigable waters under s. 295.605 (4), any proposed changes to the forest
11designations specified in sub. (4) (c), and the alternatives to the proposed mining
12project. As the applicant provides more information or makes modifications to the
13proposed mining project, the department may revise the requirements it specified
14under s. 295.465 (1) (b) to ensure the potential environmental effects can be
15identified in the department's environmental impact statement.
AB426-SSA2,98,2116 (b) The department shall assist the applicant in meeting the deadlines for
17ultimate submission and review of those analyses consistent with this subchapter.
18If a particular scientific analysis is not completed as of the date the environmental
19impact report is required to be submitted, the applicant shall identify in the
20environmental impact report the scope of the analysis and anticipated date that it
21will be submitted.
AB426-SSA2,98,2322 (c) 1. The applicant shall submit the environmental impact report with the
23application for the mining permit.
AB426-SSA2,99,324 3. Upon receipt of the environmental impact report, the department shall
25review the environmental impact report and, if the department finds that the

1environmental impact report does not contain information reasonably necessary for
2the department to evaluate the proposed mining project and its environmental
3effects, the department may request additional information from the applicant.
AB426-SSA2,99,94 (d) The department shall accept original data from an environmental impact
5report for use in the environmental impact statement and need not verify all original
6data provided by the applicant to accept the data as accurate. The department shall
7use original data from an environmental impact report in the environmental impact
8statement if the data contains the information identified under s. 295.465 (1) (b) and
9any of the following conditions is met:
AB426-SSA2,99,1310 1. The department, its consultant, or a cooperating state or federal agency
11collects sufficient data to perform a limited statistical comparison with data from the
12environmental impact report that demonstrates that the data sets are statistically
13similar within a reasonable confidence limit.
AB426-SSA2,99,1614 2. An expert who is employed by, or is a consultant to, the department or is
15employed by, or is a consultant to, a cooperating state or federal agency determines
16that the data is within the range of expected results.
AB426-SSA2,99,1917 3. The department, its consultant or a cooperating state or federal agency
18determines that the methodology used in the environmental impact report is
19scientifically and technically adequate for the tests being performed.
AB426-SSA2,99,23 20(4) Procedure for environmental impact statement. (a) The department shall
21prepare an environmental impact statement for every application for a mining
22permit. In preparing the environmental impact statement, the department shall
23comply with s. 1.11 (2) and s. NR 150.22 (2), Wis. Adm. Code.
AB426-SSA2,100,3
1(b) The department shall include in the environmental impact statement a
2description of the significant long-term and short-term impacts, including impacts
3after the mining has ended, on all of the following:
AB426-SSA2,100,44 1. Tourism.
AB426-SSA2,100,55 2. Employment.
AB426-SSA2,100,66 3. Schools and medical care facilities.
AB426-SSA2,100,77 4. Private and public social services.
AB426-SSA2,100,88 5. The tax base.
AB426-SSA2,100,99 6. The local economy.
AB426-SSA2,100,1410 (c) The department and other state agencies shall address the application for
11a mining permit, for any approval, and for any action relating to the mining project
12involving other state agencies in one comprehensive analysis in the environmental
13impact statement prepared by the department, including any environmental
14analysis required by the department with regard to any of the following:
AB426-SSA2,100,1715 1. The withdrawal of land entered as county forest land under s. 28.11 and any
16modification of, or amendment to, a county forest land use plan necessitated by the
17withdrawal of the land.
AB426-SSA2,100,1818 2. The withdrawal of land entered as forest cropland under s. 77.10.
AB426-SSA2,100,2119 3. The withdrawal of land designated as managed forest land under subch. VI
20of ch. 77 and any modification of, or amendment to, a managed forest land
21management plan necessitated by the withdrawal of the land.
AB426-SSA2,101,222 4. The transfer of land for which amounts were awarded by the department,
23including under s. 23.09 (17m), 26.38, 28.11 (5r), or 77.895, to fund the acquisition
24of, or to fund activities conducted on, forest land and any modification of, or

1amendment to, a forest stewardship management plan or other plan necessitated by
2the transfer of the land.
AB426-SSA2,101,103 (d) The public notice, informational hearing, and comment provisions in s.
4295.57, the provision concerning the effective date of approvals in s. 295.58 (6), and
5the provisions for review in s. 295.77 apply to an environmental impact statement
6prepared under this subsection. If the department revises and redistributes an
7environmental impact statement or portion of an environmental impact statement
8prepared under this section, the department shall distribute the environmental
9impact statement or portion of the environmental impact statement as provided in
10s. 295.57, but the period for public comment is 30 days, rather than 45 days.
AB426-SSA2,102,211 (e) The department shall conduct its environmental review process jointly with
12any federal or local agency that consents to a joint environmental review process.
13The department may adopt any environmental analysis prepared by another state
14agency or by a federal or local agency. The department may enter into a written
15agreement with any of those agencies that have a major responsibility related to or
16that are significantly affected by the proposed mining. In the written agreement, the
17parties shall define the responsibility of each agency in the development of a single
18environmental impact statement on the proposed mining and outline the procedures
19to be used in the regulatory process. The department shall be the lead agency for any
20environmental review process involving other state agencies. To the extent that any
21federal or local agency's environmental review process conflicts with the provisions
22of this section or s. 295.57, then the department shall follow the provisions of this
23section and s. 295.57 and may only coordinate its environmental review to the extent
24consistent with the provisions of this section and s. 295.57. The department shall
25comment on any federal agency's environmental assessment or environmental

1impact statement associated with a mining project in accordance with s. NR 150.30,
2Wis. Adm. Code.
AB426-SSA2,102,11 3(5) Relationship to other laws. This section and s. 295.57 govern the
4department's obligations under ss. 1.11 and 1.12 with respect to a mining project.
5Sections 23.11 (5) and 23.40 and ss. NR 2.085, 2.09, and 2.157, Wis. Adm. Code, do
6not apply with respect to a mining project. The rest of ch. NR 2, Wis. Adm. Code, only
7applies with respect to a mining project to the extent that it does not conflict with this
8section and s. 295.57. Sections NR 150.24 and 150.25, Wis. Adm. Code, do not apply
9with respect to a mining project. The rest of ch. 150, Wis. Adm. Code, only applies
10with respect to a mining project to the extent that it does not conflict with this section
11and s. 295.57.
AB426-SSA2,102,14 12295.56 Exemptions. (1) The department may grant an exemption, as
13provided in this section, from any of the requirements of this subchapter applicable
14to any of the following:
AB426-SSA2,102,1615 (a) A mining permit application, including the mining plan, reclamation plan,
16and mining waste site feasibility study and plan of operation.
AB426-SSA2,102,1717 (b) A mining permit.
AB426-SSA2,102,1818 (c) Any other approval.
AB426-SSA2,102,22 19(2) (a) An applicant shall submit a request for an exemption in writing and
20shall describe the grounds for the exemption and provide documentation identifying
21the conditions requiring the exemption, the reasons for the exemption, and the
22reasonableness of the exemption.
AB426-SSA2,103,323 (b) An applicant may obtain an exemption only if the applicant submits the
24request no later than the 180th day after the application for the mining permit is
25administratively complete under s. 295.57 (2), unless the condition that is the basis

1for the requested exemption is not known to the applicant before that day, in which
2case the deadline is extended to the 20th day before the deadline under s. 295.57 (7)
3(a).
AB426-SSA2,103,94 (c) The department shall issue a decision on a request for an exemption no later
5than the 15th day after the day on which it received the request under par. (a).
6Subject to par. (b) and except as provided in par. (d), the department shall grant the
7exemption if it is consistent with the purposes of this subchapter and will not violate
8any applicable environmental law outside of this subchapter and if one of the
9following applies:
AB426-SSA2,103,1010 1. The exemption will not result in significant adverse environmental impacts.
AB426-SSA2,103,1411 2. The exemption will result in significant adverse environmental impacts, but
12the applicant will offset those impacts through mitigation, as provided in s. 295.60,
13through the measures provided in s. 295.605, or through the conservation measures
14provided in s. 295.61.
AB426-SSA2,103,1615 (d) 1. The department shall deny a request for an exemption if granting the
16exemption would violate federal law.
AB426-SSA2,103,2217 2. If federal law imposes a standard for an exemption that differs from the
18standard in par. (c) and that cannot be modified by state law, and if that standard has
19been approved by the federal government for use by the state through a delegation
20agreement, federally approved state implementation plan, or other program
21approval, then the department shall determine whether to grant the request for the
22exemption using the federal standard.
AB426-SSA2,103,24 23295.57 Application procedure. (1) Submission. (a) An applicant shall
24submit the application for a mining permit as provided in s. 295.47.
AB426-SSA2,104,6
1(b) The department and the state geologist shall protect as confidential any
2information, other than effluent data, contained in an application for a mining
3permit, upon a showing that the information is entitled to protection as a trade
4secret, as defined in s. 134.90 (1) (c), and any information relating to production or
5sales figures or to processes or production unique to the applicant or that would tend
6to adversely affect the competitive position of the applicant if made public.
AB426-SSA2,104,13 7(2) Determination of administrative completeness. (a) The department shall
8review an application for a mining permit and, within 30 days after the application
9is submitted, shall determine either that the application is complete or that
10additional information is needed. If the department determines that the application
11is complete, the department shall notify the applicant in writing of that fact within
12the 30-day period and the date on which the department sends the notice is the day
13on which the application is administratively complete.
Loading...