AB261-AA1,1,13
8“
(4m) Removal of obstructions. (a) If a person who intends to use the route
9described in sub. (2) for a high-wide load notifies a political subdivision in which any
10portion of the route is located of this intent, the political subdivision, not later than
115 days after receiving an intent notification, shall notify persons who own conflicting
12obstructions to the use of the route by a high-wide load that the conflicting
13obstructions must be removed.
AB261-AA1,2,5
1(b) Not later than 8 business days after receiving a removal notification under
2par. (a) from a political subdivision, the owner of a conflicting obstruction to the use
3of the route described in sub. (2) by a high-wide load shall remove the obstruction.
4No person may replace a conflicting obstruction removed under this paragraph until
5the use of the route for which the removal was required has been completed.”
.
AB261-AA1,2,11
10“
(7) Other law. This section does not affect the limitations on size, weight, and
11load under ch. 348.”.