SB70-SSA2,402,95 (i) In 2019 Wisconsin Act 9, section 9104 (1) (j) 1. c., under projects financed by
6general fund supported borrowing, the amount authorized for the project identified
7as “Wisconsin Veterans Home at Union Grove — Southern Wisconsin Veterans
8Memorial Cemetery Administration Building expansion and fire protection” is
9decreased from $2,176,000 to $0 and the appropriate totals are adjusted accordingly.
SB70-SSA2,402,1210 (j) In 2019 Wisconsin Act 9, section 9104 (1) (j) 3., under projects financed by
11program revenue, the following new subd. 3. c. is created and the appropriate totals
12are increased by the amount shown: - See PDF for table PDF
SB70-SSA2,402,1513 (k) In 2019 Wisconsin Act 9, section 9104 (1) (j), under department of veterans
14affairs, the following new subdivision is created and the appropriate totals are
15increased by the amount shown: - See PDF for table PDF
SB70-SSA2,403,11 (7) 2021-23 Authorized State Building Program changes.
SB70-SSA2,403,62 (a) In 2021 Wisconsin Act 58, section 9104 (1) (c) 1. a., under projects financed
3by general fund supported borrowing, the amount authorized for the project
4identified as “Winnebago Mental Health Institute — patient admissions area —
5Oshkosh” is decreased from $16,795,000 to $0 and the appropriate totals are
6adjusted accordingly.
SB70-SSA2,403,117 (b) In 2021 Wisconsin Act 58, section 9104 (1) (c) 1. b., under projects financed
8by general fund supported borrowing, the amount authorized for the project
9identified as “Sand Ridge Secure Treatment Center — skilled care unit remodel —
10Mauston” is decreased from $12,612,000 to $0 and the appropriate totals are
11adjusted accordingly.
SB70-SSA2,403,1612 (c) In 2021 Wisconsin Act 58, section 9104 (1) (c) 1. d., under projects financed
13by general fund supported borrowing, the amount authorized for the project
14identified as “Mendota Mental Health Institute — utility improvements — Madison”
15is decreased from $14,920,000 to $0 and the appropriate totals are adjusted
16accordingly.
SB70-SSA2,403,1917 (d) In 2021 Wisconsin Act 58, section 9104 (1) (c), under department of health
18services, the following new subdivision is created and the appropriate totals are
19increased by the amounts shown: - See PDF for table PDF
SB70-SSA2,404,31 (e) In 2021 Wisconsin Act 58, section 9104 (1) (c), under department of health
2services, the following new subdivision is created and the appropriate totals are
3increased by the amounts shown: - See PDF for table PDF
SB70-SSA2,405,24 (f) In 2021 Wisconsin Act 58, section 9104 (1) (d) 1. d., under projects financed
5by general fund supported borrowing, the amount authorized for the project
6identified as “New motor vehicle storage buildings — Marinette and Waupaca” is
7amended to read “New motor vehicle storage buildings — Clintonville and Waupaca”

1and is decreased from $720,900 to $0 and the appropriate totals are adjusted
2accordingly.
SB70-SSA2,405,73 (g) In 2021 Wisconsin Act 58, section 9104 (1) (d) 2. c., under projects financed
4by federal funds, the amount authorized for the project identified as “New motor
5vehicle storage buildings — Marinette and Waupaca” is amended to read “New motor
6vehicle storage buildings — Clintonville and Waupaca” and is increased from
7$1,840,100 to $2,002,000 and the appropriate totals are adjusted accordingly.
SB70-SSA2,405,108 (h) In 2021 Wisconsin Act 58, section 9104 (1) (d), under department of military
9affairs, the following new subdivision is created and the appropriate totals are
10increased by the amount shown: - See PDF for table PDF
SB70-SSA2,405,1311 (i) In 2021 Wisconsin Act 58, section 9104 (1) (d), under department of military
12affairs, the following new subdivision is created and the appropriate totals are
13increased by the amount shown: - See PDF for table PDF
SB70-SSA2,406,214 (j) In 2021 Wisconsin Act 58, section 9104 (1) (h) 1. i., under projects financed
15by general fund supported borrowing, the amount authorized for the project
16identified as “Madison — Wisconsin Veterinary Diagnostic Laboratory renovation

1and expansion — Barron” and is decreased from $9,555,000 to $0 and the
2appropriate totals are adjusted accordingly.
SB70-SSA2,406,63 (k) In 2021 Wisconsin Act 58, section 9104 (1) (h) 3., under University of
4Wisconsin System, under projects financed by existing program revenue supported
5borrowing, the following new subd. 3. c. is created and the appropriate totals are
6increased by the amount shown: - See PDF for table PDF
SB70-SSA2,406,97 (l) In 2021 Wisconsin Act 58, section 9104 (1) (h), under University of Wisconsin
8System, the following new subdivision is created and the appropriate totals are
9increased by the amount shown: - See PDF for table PDF
SB70-SSA2,406,1410 (8) Design work on a new Type 1 juvenile correctional facility. In the
112023-25 fiscal biennium, the building commission shall allocate in segregated
12revenue, for project planning, development, design, site selection, and land and
13property acquisition for a new 72,000 gross square foot Type 1 juvenile correctional
14facility, as defined in s. 938.02 (19), $6,000,000.
SB70-SSA2,407,215 (9) Design work on the Wisconsin National Guard Challenge Academy at
16Fort McCoy.
In the 2023-25 fiscal biennium, the building commission shall allocate
17in segregated revenue, to develop preliminary plans and specifications for the

1construction of the 71,000 gross square foot Wisconsin National Guard Challenge
2Academy located at Fort McCoy, $700,000.
SB70-SSA2,407,63 (10) University of Wisconsin System Facilities. In the 2023-25 fiscal
4biennium, the building commission shall allocate segregated revenue as follows to
5develop preliminary plans and specifications for the construction of University of
6Wisconsin System facilities:
SB70-SSA2,407,87 (a) For renovations related to health sciences programs and to complete
8renovations in the Northwest Quadrant at UW–Milwaukee, $5,000,000.
SB70-SSA2,407,119 (b) For renovations at Winther Hall, replacement of the Heide Hall roofing and
10exterior windows, and construction of new entrances/vertical circulation towers for
11both of those facilities at UW–Whitewater, $3,000,000.
SB70-SSA2,407,1712 (11) State capitol fiber and cable upgrades. In the 2023-25 fiscal biennium,
13the building commission shall allocate in segregated revenue, to develop preliminary
14plans and specifications for fiber and cable upgrades at the state capitol, $1,200,000.
15The division of facilities development in the department of administration shall
16coordinate with the chief clerk of each house of the legislature and the legislative
17technology services bureau in developing those plans and specifications.
SB70-SSA2,407,2118 (12) Central Wisconsin Center food service building renovation. In the
192023-25 fiscal biennium, the building commission shall allocate in segregated
20revenue, to develop preliminary plans and specifications for the renovation of a food
21service building at the Central Wisconsin Center, $5,000,000.
SB70-SSA2,408,222 (13) Winnebago Mental Health Institute utility and service tunnel
23improvements.
In the 2023-25 fiscal biennium, the building commission shall
24allocate in segregated revenue, to develop preliminary plans and specifications for

1utility and service tunnel improvements at the Winnebago Mental Health Institute,
2$3,000,000.
SB70-SSA2,408,53 (14) University of Wisconsin System minor facilities renewal program. The
4amounts specified under sub. (1 ) (i) 1. a., 3. a., and 4. a. shall be expended for the
5following projects:
SB70-SSA2,408,76 (a) UW–Green Bay — campus-wide fire alarm and smoke detection system
7replacement.
SB70-SSA2,408,98 (b) UW–Milwaukee — Kenilworth Square east exterior envelope maintenance
9and repairs.
SB70-SSA2,408,1110 (c) UW–Parkside — facilities management center health and safety
11renovations.
SB70-SSA2,408,1312 (d) UW–Stout — Swanson Library electrical system replacement/exterior
13envelope maintenance and repairs.
SB70-SSA2,408,1514 (e) UW–La Crosse — Graff Main Hall/Mitchell Hall exterior envelope
15maintenance and repairs.
SB70-SSA2,408,1716 (f) UW–Milwaukee — Chapman Hall/Cunningham Hall exterior envelope
17maintenance and repairs.
SB70-SSA2,408,1918 (g) UW–Platteville — Williams Fieldhouse exterior envelope maintenance and
19repairs.
SB70-SSA2,408,2020 (h) UW–Stout — multi-building exterior envelope maintenance and repairs.
SB70-SSA2,408,2121 (i) UW–Whitewater — Wells Hall elevator modernization.
SB70-SSA2,408,2222 (j) UW–Madison — Nielsen Tennis Center roof replacement.
SB70-SSA2,408,2323 (k) UW–Parkside — multi-building telecommunications cable replacement.
SB70-SSA2,408,2424 (l) UW–Madison — lifesaving station erosion repairs and prevention.
SB70-SSA2,408,2525 (m) UW–Madison — University Bay Fields enhancements.
SB70-SSA2,409,1
1(n) UW–Madison — lake-shore path pedestrian bridge.
SB70-SSA2,409,42 (15) University of Wisconsin System instructional space projects program.
3The amount specified under sub. (1 ) (i) 3. b. shall be expended for the following
4projects:
SB70-SSA2,409,55 (a) UW–Parkside — Health Science Laboratory renovations.
SB70-SSA2,409,76 (b) UW–River Falls — agricultural engineering and agricultural science
7laboratory renovations.
SB70-SSA2,409,98 (c) UW–Platteville — Boebel Hall biochemistry laboratory renovation (room
9327).
SB70-SSA2,409,1010 (d) UW–Whitewater — Center of the Arts metals lab renovation (room 2054).
SB70-SSA2,409,1111 (e) UW–Oshkosh — Arts and Communication Center music hall renovation.
SB70-SSA2,409,1212 (f) UW–Green Bay — studio arts 4th floor visual arts laboratory renovations.
SB70-SSA2,409,1313 (g) UW–Eau Claire — Haas Fine Arts art and design studio renovation.
SB70-SSA2,409,1414 (h) UW–Stout — communications technology classroom renovations.
SB70-SSA2,409,1515 (i) UW–Madison — Van Hise Hall first floor classroom renovations.
SB70-SSA2,409,1716 (j) UW–La Crosse — Wing Technology Center computer science laboratory
17renovation.
SB70-SSA2,409,1818 (k) UW–Eau Claire — Hibbard Hall classroom renovations.
SB70-SSA2,409,1919 (l) UW–Madison — Steenbock Library active learning space renovation.
SB70-SSA2,409,2020 (m) UW–Madison — Brogden psychology lecture hall 105 renovation.
SB70-SSA2,410,221 (16) Versiti Blood Research Institute expansion. Notwithstanding s. 13.48
22(48) (b), the building commission is prohibited from making the grant enumerated
23in sub. (1) (j), under s. 13.48 (48), unless the department of administration has
24reviewed and approved plans for the project. Notwithstanding ss. 16.85 (1) and
2516.855 (1m), the department of administration is prohibited from supervising any

1services or work or let any contract for the project. Section 16.87 does not apply to
2the project.
SB70-SSA2,410,103 (17) Children's hospital and health system dental clinic expansion.
4Notwithstanding s. 13.48 (37m) (b), the building commission is prohibited from
5awarding a grant to Children's Hospital and Health System, Inc., for expansion of
6its dental clinic, as enumerated in sub. (1 ) (k), under s. 13.48 (37m), unless the
7department of administration has reviewed and approved plans for the project.
8Notwithstanding ss. 16.85 (1) and 16.855 (1m), the department of administration is
9prohibited from supervising any services or work or let any contract for the project.
10Section 16.87 does not apply to the project.
SB70-SSA2,410,1811 (18) Marquette University School of Dentistry upgrades. Notwithstanding
12s. 13.48 (32c) (b), the building commission is prohibited from awarding a grant to
13Marquette University for construction and equipment upgrades to its School of
14Dentistry, as enumerated in sub. (1 ) (L), under s. 13.48 (32c), unless the department
15of administration has reviewed and approved plans for the project. Notwithstanding
16ss. 16.85 (1) and 16.855 (1m), the department of administration is prohibited from
17supervising any services or work or let any contract for the project. Section 16.87
18does not apply to the project.
SB70-SSA2,410,2519 (19) Regional forensic science center. Notwithstanding s. 13.48 (49) (b), the
20building commission is prohibited from awarding a grant to Marathon County for the
21construction of a regional forensic science center enumerated in sub. (1) (m), under
22s. 13.48 (49), unless the department of administration has reviewed and approved
23plans for the project. Notwithstanding ss. 16.85 (1) and 16.855 (1m), the department
24of administration is prohibited from supervising any services or work or let any
25contract for the project. Section 16.87 does not apply to the project.
SB70-SSA2,411,6
1(20) Food and Farm Exploration Center. Notwithstanding s. 13.48 (46s) (b),
2the building commission is prohibited from making the grant enumerated in sub. (1)
3(n), under s. 13.48 (46s), unless the department of administration has reviewed and
4approved plans for the project. Notwithstanding ss. 16.85 (1) and 16.855 (1n), the
5department of administration is prohibited from supervising any services or work or
6let any contract for the project. Section 16.87 does not apply to the project.
SB70-SSA2,411,147 (21) Badgerland After School Enrichment Program facility.
8Notwithstanding s. 13.48 (41m) (b), the building commission is prohibited from
9awarding a grant to the Badgerland After School Enrichment Program, Inc., for the
10purchase and renovation of a facility for out-of-school care, as enumerated in sub.
11(1) (o), under s. 13.48 (41m), unless the department of administration has reviewed
12and approved plans for the project. Notwithstanding ss. 16.85 (1) and 16.855 (1m),
13the department of administration is prohibited from supervising any services or
14work or let any contract for the project. Section 16.87 does not apply to the project.
SB70-SSA2,9106 15Section 9106. Nonstatutory provisions; Children and Families.
SB70-SSA2,411,2116 (1) Online positive parenting program. From the appropriation under s.
1720.437 (1) (nL), the department shall award in each fiscal year of the 2023-25 fiscal
18biennium a grant to Children's Wisconsin for the purpose of making available
19statewide an online evidence-based parenting program that provides support to
20parents, reduces childhood behavioral issues, and increases family stability in the
21amount of $2,000,000.
SB70-SSA2,9107 22Section 9107. Nonstatutory provisions; Circuit Courts.
SB70-SSA2,412,223 (1) Circuit courts designated to begin operation in 2022. The circuit court
24branches added in s. 753.06 (4) (dm), (7) (ag), (9) (L), and (10) (g) are the additional

1branches authorized to be added and allocated by the director of state courts under
2s. 753.0605 (2) to begin operation on August 1, 2022.
SB70-SSA2,412,63 (2) Circuit courts designated to begin operation in 2023. The circuit court
4branches added in s. 753.06 (4) (c), (7) (ar), (9) (m), and (10) (L) are the additional
5branches authorized to be added and allocated by the director of state courts under
6s. 753.0605 (3) to begin operation on August 1, 2023.
SB70-SSA2,9108 7Section 9108. Nonstatutory provisions; Corrections.
SB70-SSA2,412,88 (1) Transfer of security operations at the Wisconsin Resource Center.
SB70-SSA2,412,139 (a) Assets and liabilities. On the effective date of this paragraph, the assets and
10liabilities of the department of corrections that are primarily related to security
11operations at the Wisconsin Resource Center, as determined by the secretary of
12administration, become the assets and liabilities of the department of health
13services.
SB70-SSA2,412,1814 (b) Positions and employees. On the effective date of this paragraph, 110.0 FTE
15GPR positions, and the incumbent employees holding those positions, in the
16department of corrections responsible for the performance of security operations at
17the Wisconsin Resource Center under s. 46.056 (2), 2021 stats., as determined by the
18secretary of administration, are transferred to the department of health services.
SB70-SSA2,412,2319 (c) Employee status. Employees transferred under par. (b ) have all the rights
20and the same status under ch. 230 of the statutes in the department of health
21services that they enjoyed in the department of corrections immediately before the
22transfer. Notwithstanding s. 230.28 (4), no employee transferred under par. (b) who
23has attained permanent status in class is required to serve a probationary period.
SB70-SSA2,413,324 (d) Tangible personal property. On the effective date of this paragraph, all
25tangible personal property, including records, of the department of corrections that

1are primarily related to security operations at the Wisconsin Resource Center, as
2determined by the secretary of administration, is transferred to the department of
3health services.
SB70-SSA2,413,104 (e) Pending matters. Any matter pending with the department of corrections
5on the effective date of this paragraph that is primarily related to security operations
6at the Wisconsin Resource Center, as determined by the secretary of administration,
7is transferred to the department of health services. All materials submitted to or
8actions taken by the department of corrections with respect to the pending matter
9are considered as having been submitted to or taken by the department of health
10services.
SB70-SSA2,413,1611 (f) Contracts. All contracts entered into by the department of corrections
12primarily related to security operations at the Wisconsin Resource Center, as
13determined by the secretary of administration, in effect on the effective date of this
14paragraph remain in effect and are transferred to the department of health services.
15The department of health services shall carry out any obligations under those
16contracts unless modified or rescinded to the extent allowed under the contract.
SB70-SSA2,413,2117 (2) Opening avenues to reentry success program. In fiscal year 2023-24, of
18the moneys newly appropriated under s. 20.410 (1) (ds), $760,300 shall be allocated
19to the original opening avenues to reentry success (OARS) program. In fiscal year
202024-25, of the moneys newly appropriated under s. 20.410 (1) (ds), $1,512,000 shall
21be allocated to the original opening avenues to reentry success (OARS) program.
SB70-SSA2,9113 22Section 9113. Nonstatutory provisions; Employee Trust Funds.
SB70-SSA2,413,2323 (1) Position authorizations for the department of employee trust funds.
SB70-SSA2,414,1324 (a) Before July 1, 2029, the secretary of employee trust funds may request the
25governor to create or abolish a full-time equivalent position or portion thereof that

1is funded from revenues deposited in the public employee trust fund if the employee
2holding the position would perform duties relating to modernizing business
3processes or integrating information technology systems of the department of
4employee trust funds. Upon receiving such a request, the governor may approve or
5modify the request. If the governor proposes to approve or modify the request, the
6governor shall notify the joint committee on finance in writing of his or her proposed
7action. If, within 14 working days after the date of the governor's notification, the
8cochairpersons of the committee do not notify the governor that the committee has
9scheduled a meeting for the purpose of reviewing the proposed action, the position
10changes may be made as proposed by the governor. If the cochairpersons notify the
11governor that the committee has scheduled a meeting for the purpose of reviewing
12the proposed action, the position changes may be made only upon approval of the
13committee.
SB70-SSA2,414,1614 (b) If a full-time equivalent position or portion thereof is created under par. (a),
15the appropriation that is used to pay salary and fringe benefit costs for the position
16is supplemented to cover the salary and fringe benefit costs for the position.
SB70-SSA2,415,517 (2) Supplementation of appropriations. Before July 1, 2029, the secretary of
18employee trust funds may request the governor to supplement any sum certain
19appropriation from the public employee trust fund for the purpose of modernizing
20business processes or integrating information technology systems of the department
21of employee trust funds. Upon receiving such a request, the governor may approve
22or modify the request. If the governor proposes to approve or modify the request, the
23governor shall notify the joint committee on finance in writing of his or her proposed
24action. If, within 14 working days after the date of the governor's notification, the
25cochairpersons of the committee do not notify the governor that the committee has

1scheduled a meeting for the purpose of reviewing the proposed action, the
2supplements proposed by the governor are approved. If the cochairpersons notify the
3governor that the committee has scheduled a meeting for the purpose of reviewing
4the proposed action, the supplements may be made only upon approval of the
5committee.
SB70-SSA2,9119 6Section 9119. Nonstatutory provisions; Health Services.
SB70-SSA2,415,97 (1) Deadline for implementing dental services reimbursement rate increase.
8The department of health services shall, by October 1, 2023, implement the Medical
9Assistance reimbursement rate increase under s. 49.45 (24n) (a).
SB70-SSA2,415,1610 (2) Fee increase plan for bureau of assisted living staff. No later than the
11first day of the 7th month beginning after the effective date of this subsection, the
12department of health services shall submit a plan to the joint committee on finance
13to increase licensing fees for assisted living facilities and outpatient mental health
14clinics to cover the cost of staffing within the bureau of assisted living necessary to
15ensure adequate protection of the health and well-being of vulnerable individuals,
16as determined by the department.
SB70-SSA2,415,2117 (3) Nursing home support services. The department of health services shall,
18for purposes of reimbursement under the Medical Assistance program for nursing
19homes, establish and implement a priced rate for nursing home support services that
20matches the median facility costs plus 25 percent priced rate implemented by the
21department of health services for direct care nursing services.
SB70-SSA2,415,2522 (4) Nursing home incentives. For purposes of the methodology for setting
23nursing home payment rates under the Medical Assistance program, the department
24of health services shall exclude provider incentives when determining the total rate
25adjustment to allowable costs.
SB70-SSA2,416,6
1(5) Reimbursement rate for ventilator-dependent residents. Beginning July
21, 2023, the department of health services shall increase by $200 per patient day the
3all-encompassing ventilator-dependent resident reimbursement rate under the
4Medical Assistance program for an authorized facility treating a resident of the
5facility who has received prior authorization for ventilator-dependent care
6reimbursed under that rate.
SB70-SSA2,416,107 (6) EMS funding assistance program funding formula. The emergency
8medical services board shall adjust the funding formula as required under s. 256.12
9to take into account the newly eligible entities and expanded uses for which funding
10is permitted under s. 256.12 (4).
SB70-SSA2,9127 11Section 9127. Nonstatutory provisions; Justice.
SB70-SSA2,416,1612 (1) Grants to schools for critical incident mapping data. During the 2023-25
13fiscal biennium, the department of justice may not award to a school board or
14governing body of a private school a grant under s. 165.88 for submitting critical
15incident mapping data if the school board or governing body has already received a
16grant under s. 165.88 for that purpose.
SB70-SSA2,9128 17Section 9128. Nonstatutory provisions; Legislature.
SB70-SSA2,416,2018 (1) Required general fund structural balance. Section 20.003 (4m) shall not
19apply to the actions of the legislature in enacting any legislation during the 2023-24
20legislative session.
Loading...