LRB-3973/2
RPN&RNK:wlj&kjf:jf
2005 - 2006 LEGISLATURE
November 22, 2005 - Introduced by Senators Olsen, Stepp, Harsdorf, Schultz,
Zien, Kedzie, Lazich, Leibham, Roessler, S. Fitzgerald, Darling, Brown
and
Kanavas, cosponsored by Representatives Wieckert, Loeffelholz, Shilling,
Owens, Musser, Kestell, Jeskewitz, F. Lasee, Montgomery, Gard, Albers,
Townsend, Davis, Petrowski, Pettis, Nelson, Kreibich, Ott, Hahn, Suder,
Lamb, J. Fitzgerald, Vos, LeMahieu, Gundrum, Rhoades, Gronemus, Vruwink

and Huebsch. Referred to Committee on Housing and Financial Institutions.
SB448,1,3 1An Act to create 101.148 and 895.07 of the statutes; relating to: contractor's
2notices, claims against certain contractors and suppliers of dwellings, and
3providing a penalty.
Analysis by the Legislative Reference Bureau
This bill requires contractors and subcontractors who contract to construct a
home or to remodel a home or manufactured home to provide a notice to the
homeowner telling the homeowner that he or she must follow the procedure in this
bill before suing a contractor, subcontractor, or door or window supplier. Under the
bill, if a homeowner, which includes condominium associations, is concerned about
a possible construction defect, the homeowner must give written notice of the claim
to the contractor at least 90 working days before starting an action against the
contractor. The bill requires the written notice of the claim to detail the nature of the
alleged defect, including any evidence and information the homeowner has that
depicts the nature and cause of the defect.
After the contractor receives the notice, the bill gives the contractor time to
respond to the notice with a written offer to inspect the property, make repairs, settle
the claim with a monetary payment, or reject the claim. Under the bill, if the claim
is rejected at this point, the homeowner can start an action against the contractor.
The bill requires the homeowner to allow the contractor access to the home if the
contractor wants to inspect the alleged defect. If the contractor makes a settlement
offer and the homeowner rejects the offer, the homeowner must do so with a written
statement that includes the factual reasons for the rejection and any known legal

reasons for the rejection. The bill allows the contractor to submit a timely
supplemental offer in response to the homeowner's rejection and requires the
homeowner to respond to the supplemental offer under the same procedures as he
or she responds to an original offer.
If the property is inspected and requires some destructive testing, the bill
requires the contractor to return the dwelling to its preinspection condition after
finishing the inspection and testing. After the inspection, the bill gives the
contractor an opportunity to remedy the defect, settle the claim with a monetary
settlement, or refuse to remedy the alleged defect. Under the bill, if the contractor
refuses to remedy the alleged defect, after notification the homeowner may start an
action regarding the defect. If the homeowner agrees to a contractor's settlement
offer, and the contractor does not follow through as agreed, the bill allows the
homeowner to include in its court action the offer and acceptance as rebuttable
evidence of an agreement.
Under the bill, if a homeowner rejects a reasonable settlement offer or does not
permit the contractor to repair the defect, the homeowner's damages are limited to
the fair market value of the offer of settlement or the actual costs of the repairs,
whichever is less, or the amount of the monetary offer of settlement.
The bill allows a homeowner to repair a defect immediately without giving
notice if the repair is necessary for health or safety.
The bill also provides that the contractor or supplier may not be liable for
damages for a defect if the damage is caused by normal shrinkage or settlement of
the construction, if the contractor or supplier relied on written information from a
public agency, if the defect was known by or disclosed to the homeowner before the
purchase, the dwelling was purchased "as is," the defect could have been discovered
by the homeowner with due diligence before purchasing the dwelling, or the
contractor or supplier was not allowed to perform warranty service work.
Condominium associations and other homeowner associations are required by
the bill to follow additional procedures before bringing an action for a construction
defect, including receiving approval from each unit's owner who is affected by that
action, the majority of the unit owners vote for the action, and the association's board
of directors negotiated in good faith with the contractor to resolve the defect.
Under the bill, a contractor may obtain contribution from a window or door
supplier for the cost of repairing the defect if the contractor follows procedures in the
bill similar to those that apply to the contractor and homeowner regarding a defect,
including notifying the supplier of the alleged defect and giving the supplier an
opportunity to remedy the defect or to make an offer of settlement.
The bill requires the Department of Commerce to prepare a draft of a brochure
that explains the process in this bill and provide that draft to contractors.
Contractors are required to give a copy of the brochure to homeowners.
The people of the state of Wisconsin, represented in senate and assembly, do
enact as follows:
SB448, s. 1
1Section 1. 101.148 of the statutes is created to read:
SB448,3,2 2101.148 Contractor notices. (1) Definitions. In this section:
SB448,3,33 (a) "Claimant" has the meaning given in s. 895.07 (1) (c).
SB448,3,84 (b) "Contractor" means a person that enters into a contract with a potential
5claimant to construct a dwelling on the potential claimant's land, to complete a
6remodeling project on a dwelling on the potential claimant's land, or to complete a
7remodeling project on the potential claimant's manufactured home. "Contractor"
8includes a subcontractor.
SB448,3,119 (c) "Dwelling" means any structure or part of a structure that is intended for
10use as a home, residence, or sleeping place by one or more persons maintaining a
11common household, to the exclusion of all others.
SB448,3,1212 (d) "Manufactured home" has the meaning given in s. 101.91 (2).
SB448,3,1313 (e) "Remodel" does not include maintenance and repair work.
SB448,3,1514 (f) "Supplier" means a person that manufactures or supplies windows or doors
15for a dwelling.
SB448,3,20 16(2) Notice required at time of contracting. (a) Upon entering into a contract
17to construct a dwelling, to complete a remodeling project on a dwelling, or to complete
18a remodeling project on a manufactured home, the contractor shall give the potential
19claimant, if any, a copy of the brochure prepared under s. 895.07 (12) and a notice
20worded substantially as follows:
SB448,3,2221 NOTICE CONCERNING CONSTRUCTION
22 DEFECTS
SB448,4,823 Wisconsin law contains important requirements you must follow before you
24may file a lawsuit for defective construction against the contractor who constructed
25your dwelling or completed your remodeling project or against window or door

1suppliers. For example, section 895.07 (2) and (3) of the Wisconsin statutes requires
2you to deliver to the contractor a written notice of any construction conditions you
3allege are defective before you file your lawsuit, and you must provide your
4contractor or window or door suppliers the opportunity to make an offer to repair or
5pay for the construction defects. You are not obligated to accept any offer made by
6the contractor or window or door suppliers, but failure to accept a reasonable offer
7may limit your recoverable damages. All parties are bound by applicable warranty
8provisions.
SB448,4,119 (b) The notice required under par. (a) shall be conspicuous and in writing and
10may be included within the contract between the contractor and the potential
11claimant.
SB448, s. 2 12Section 2. 895.07 of the statutes is created to read:
SB448,4,14 13895.07 Claims against contractors and suppliers. (1) Definitions. In this
14section:
SB448,4,1515 (a) "Action" means a civil action or an arbitration under ch. 788.
SB448,4,1716 (b) "Claimant" means a homeowner, other than a developer or builder, who
17asserts a claim against a contractor or supplier concerning a construction defect.
SB448,4,2218 (c) "Construction defect" has the meaning assigned by a written, express
19warranty provided by the contractor or, if no such meaning is assigned by warranty,
20means a deficiency in the specifications, planning, supervision, construction, or
21remodeling of a dwelling or in the remodeling of a manufactured home that results
22from any of the following:
SB448,4,2323 1. Defective material.
SB448,4,2424 2. Violation of applicable codes.
SB448,4,2525 3. Failure to follow accepted trade standards for workmanlike construction.
SB448,5,3
1(d) "Contractor" means a person including a subcontractor, that enters into a
2contract with a potential claimant to construct a dwelling or to complete a
3remodeling project on a dwelling or manufactured home.
SB448,5,64 (e) "Dwelling" means any structure or part of a structure that is intended for
5use as a home, residence, or sleeping place by one or more persons maintaining a
6common household, to the exclusion of all others.
SB448,5,77 (f) "Manufactured home" has the meaning given in s. 101.91 (2).
SB448,5,98 (g) "Serve" or "service" means personal service or delivery by certified mail,
9return receipt requested, to the last-known address of the addressee.
SB448,5,1110 (h) "Supplier" means a person that manufactures or supplies windows or doors
11for a dwelling.
SB448,5,1312 (j) "Working day" means any day except Saturday, Sunday, and holidays
13designated in s. 230.35 (4) (a).
SB448,5,20 14(2) Action; dismissal without prejudice. Before filing an action against a
15contractor or supplier for a construction defect, the claimant shall serve the
16contractor with a written notice of the claim that describes the claim in sufficient
17detail to determine the general nature of the construction defect. If the claimant files
18an action but fails to serve the notice of claim, the circuit court shall dismiss the
19action without prejudice, and the action may not be refiled until the claimant has
20complied with the requirements of this subsection.
SB448,6,7 21(3) Notice and opportunity to repair. (a) No later than 90 working days before
22initiating an action against a contractor or supplier under this section, the claimant
23shall serve written notice of claim under sub. (2) on the contractor. The notice of
24claim shall state that the claimant asserts a construction defect claim or claims and
25is providing notice under this paragraph. The notice of claim shall describe the claim

1or claims in sufficient detail to explain the nature of the alleged construction defect
2and the results of the construction defect. The claimant shall provide to the
3contractor all evidence the claimant knows or possesses, including expert reports,
4photographs, electronic mail, and videotapes that depict the nature and cause of the
5alleged construction defect. In addition, the claimant shall provide to the contractor
6any evidence discoverable under ch. 804 that depicts the nature and cause of the
7construction defect, including expert reports, photographs, and videotapes.
SB448,6,158 (b) Within 15 working days after the claimant serves notice of claim under par.
9(a), or within 25 working days if the contractor makes a claim for contribution from
10a supplier under sub. (9) (a), each contractor that has received the notice of claim may
11serve on the claimant, and on any other contractor that has received the notice of
12claim and on any supplier that has received a claim for contribution under sub. (9)
13(a), a written response to the claim or claims that either offers to settle the claim by
14monetary payment, the making of repairs, or a combination of both, without
15inspection, or proposes to inspect the dwelling that is the subject of the claim.
SB448,6,2316 (c) Within 15 working days after a supplier has received notice that a contractor
17is seeking contribution under sub. (9) (a), the supplier may serve the contractor with
18a written response that offers to settle the contribution claim by payment, by repair,
19or by both payment and repair without inspection or that offers to inspect the
20dwelling that is the subject of the contribution claim. If a contribution claim is made,
21the contractor shall forward all responses from the supplier to the claimant. The
22supplier and contractor shall use their best efforts to coordinate their responses to
23claims and contribution claims.
SB448,7,224 (d) If the contractor wholly rejects the claim and will neither remedy the alleged
25construction defect nor settle the claim, or does not respond to the claimant's notice

1of claim within the time under par. (b), the claimant may bring an action against the
2contractor for the claims described in the notice of claim without further notice.
SB448,7,113 (e) If the claimant rejects a settlement offer made by the contractor, the
4claimant shall provide written notice of the claimant's rejection to the contractor.
5The notice shall include the specific factual and, if known, legal reasons for the
6claimant's rejection of the contractor's proposal or offer. If the claimant believes that
7the settlement offer omits reference to any portion of the claim, or was unreasonable,
8the claimant shall in its written notice include those items that the claimant believes
9were omitted and set forth in detail all reasons why the claimant believes the
10settlement offer is unreasonable. The contractor shall forward the claimant's
11response to a supplier upon whom a contribution claim has been made.