TABLE 2 
Fee Schedule – All Facilities Except Landfills And and Surface Impoundments 
Facility Type 
Initial Site & Construction Inspection Fees (1)1 
Plan Review Fee (2) 
Plan 
Modification or Exemption Request 
Construction  
Documentation Review Fee 
Annual 
License Fee  
Beneficial Use 
$550 
$550 
$550 
$550 
N/A 
Collection and Transportation 
N/A 
N/A 
N/A 
N/A 
$110 
    Each Additional Truck 
N/A 
N/A 
N/A 
N/A 
$33 
Transfer Facility (3) 
 
 
 
 
 
    Exempt (up to 50 tons/day) 
$550 
N/A 
N/A 
N/A 
$165 
    Small (>50 to 100 tons/day) 
$550 
$660 
$330 
$330 
$165 
    Large (>100 tons/day) 
$550 
$1,650 
$550 
$660 
$550 
Processing Facility (4) 
$550 
$3,300 
$1,100 
$1,100 
$550 
Storage Facility (3) 
 
 
 
 
 
    Exempt (up to 50 tons/day) 
$550 
N/A 
N/A 
N/A 
$550 
    Non-Exempt (>50 tons/day) 
$550 
$1,650 
$550 
$660 
$550 
Incineration Facility(4) 
$550 
$7,700 
$1,650 
$1,100 
$7,700 
Air Curtain Destructor 
$550 
$330 
$330 
$165 
$165 
Woodburning Facility 
$550 
$165 
$165 
N/A 
$165 
One-Time Disposal
$550
$660
$660
N/A
N/A
Municipal Waste Combustor 
 
 
 
 
 
    Small 
$550 
$1,650 
$550 
$660 
$660 
    Large (>10 tons/day) 
$550 
$7,700 
$1,650 
$1,100 
$7,700 
Landspreading Facility 
 
 
 
 
 
    Exempt 
$550 
$660 
$550 
N/A 
N/A 
    Non-Exempt 
$550 
$1,650 
$550 
N/A 
N/A 
Infectious Waste Transport 
N/A 
N/A 
N/A 
N/A 
$275 
    Each Additional Truck 
N/A 
N/A 
N/A 
N/A 
$22 
Infect. Waste Annual Report 
N/A 
N/A 
N/A 
N/A 
$55 (5)2 
Medical Waste Reduction Plan 
N/A 
$660 (6)3 
$550 
N/A 
N/A 
Low Hazard Exemption under s. NR 500.08 (3m) and (4) or s. 289.43 (8), Stats.
N/A 
$2,000 
N/A 
N/A 
N/A 
(1)1  The initial site inspection fee doubles to $1,100 if preliminary screening prior to field inspection indicates the possible presence of endangered resources or sites of historical or archeological significance.  This fee also applies to each compliance inspection performed per s. NR 502.05 (3) (k) 8. or 502.07 (2r) (g).  
(2)  The plan review fees specified in Table 2 cover the department’s review from initial submittal through approval or denial of the report or plan.  An applicant may withdraw and revise or supplement a report or plan prior to it being deemed complete and resubmit it without paying an additional review fee.  The applicant shall pay an additional plan review fee as specified in Table 2 for resubmittal of a plan which has been withdrawn after having been determined to be complete, or for review of a report that has twice been declared incomplete. 
(3)  A plan modification, as referred to in Table 2, is a submittal which proposes to modify a plan of operation or closure plan previously approved by the department. 
(4)  The department shall waive the plan review fees and license fees for a processing facility, including a composting facility, an electronics processing facility, or an incinerator that has a primary purpose of converting solid waste into usable materials, products, or energy. The waiver does not include the initial site and construction inspection fees or the construction documentation review fee. 
(5)2 This is an annual filing fee.  A $25 late fee will be added for annual reports received after March 1 of the following calendar year.    
(6)3 If the department requires a medical facility to submit its medical waste reduction plan under s. NR 526.22, the plan review fee shall also be submitted. 
227Section 227   NR 520.15 Table 3 is repealed and recreated to read:
      Table 3
Fee Schedule – Landfills and Surface Impoundments
Submittal, Inspection, or License Type
Landfill Type
All Landfills and Surface Impoundments
except ch. NR 503 Landfills
Small Size Construction & Demo Waste Landfills
(s. NR 503.09) and
One-time Disposal Landfills
(s. NR 503.08)
Intermediate Size Construction & Demo Waste Landfills
(s. NR 503.10)
Initial Site Report - Fee applies to each location (ch. NR 509) 
$3,300
N/A
N/A
Feasibility Report
(ch. NR 512) 
$22,000 until 12/31/2026
$33,000 effective 1/1/2027
$44,000 effective 1/1/2028
$40,000 for vertical-only expansion,
effective 1/1/2028
N/A
N/A
Additional $2,000 per each s. NR 504.04 (3) locational item exemption request
Additional $2,000 for combined ch. NR 140 groundwater standard exemption requests
Modification to a previously approved Feasibility Report 
$5,000
N/A
N/A
Plan of Operation
(chs. NR 503 and 514) 
$7,700 until 12/31/2026
$16,500 effective 1/1/2027
$22,000 effective 1/1/2028
$20,000 for vertical-only expansion,
effective 1/1/2028
$1,100
$7,700
Modification to previously approved Plan of Operation 
(chs. NR 503 and 514, and
s. NR 520.04 (4) (h))
$1,650 until 12/31/2026
$2,625 effective 1/1/2027
$3,500 effective 1/1/2028
$550
$1,650
$30,500 for plan of operation modification for initial permitting of CCR Landfills under
s. NR 514.045 (1)
Supplemental Review
(s. NR 520.04 (4) (i)) 
$1,650 until 12/31/2026
$2,625 effective 1/1/2027
$3,500 effective 1/1/2028
$550
$1,650 
Expedited Plan Modification
(s. NR 514.09) 
$1,000 until 12/31/2026
$1,750 effective 1/1/2027
N/A
N/A
Construction Documentation
(chs. NR 503 and 516)1 
$1,100 until 12/31/2026
$2,250 effective 1/1/2027
$3,000 effective 1/1/2028
$220
$1,100
Closure Plan (ch. NR 514) 
$5,500
N/A
N/A
Landfill Stability Plan
(s. NR 514.07 (9))   
submitted separately from a plan of operation report 
$2,500
N/A
N/A
Inspection   
Including the following: 
Initial Site Inspections
(chs. NR 503
and 509)2
Construction Inspections3
(chs. NR 503
and 516) 
$550 until 12/31/2026
$900 effective 1/1/2027
$1,210 effective 1/1/2028
$550
$550
Annual Operating License4
(s. NR 520.04 (1) (c))
or Long-term Care License Transfer Fee (s. NR 520.04 (2))
$7,700
N/A
N/A
Annual Operation Inspection Fee
(ss. NR 503.09 (9) and
503.10 (9) (b))
N/A
$1,650
$3,850
Authorization to Begin Long-term Care Period
(s. NR 520.04 (3))
N/A
N/A
$6,600
Long-term Care License
(s. NR 520.04 (3))
$6,600 until 12/31/2026
$7,700 effective 1/1/2027
N/A
N/A
Annual Report
(chs. NR 503 and 506)
$500
$500
$500
Research, Development, and Demonstration Plan 
(s. NR 514.10) 
if submitted separate from a plan of operation 
$2,500 initial plan submittal
$2,500 each renewal submittal
N/A
N/A
 
1 These fees apply to each facility construction documentation report submitted and to construction documentation reports for which a design capacity cannot be applied, such as sedimentation basins or remedial actions.
 2 The initial site inspection fee applies to each inspection location and doubles if preliminary screening prior to field inspection indicates the possible presence of endangered resources or sites of historical or archeological significance. 
3 This fee applies to each inspection performed by the department and to each phase of construction, to a maximum of 10 inspections.
4 Landfills initially licensed before January 1, 2005, that have a total approved design capacity below 50,000 cubic yards shall pay an annual license fee of $1,650. Landfills initially licensed before January 1, 2005, that have a total approved design capacity from 50,000 cubic yards to 500,000 cubic yards shall pay an annual license fee of $3,850.  
5 This fee is a one-time payment for the licensee’s or landfill owner’s perpetual long-term care responsibility. 
6 This fee applies to all annual reports for landfills, including CCR landfill annual reports under s. NR 506.20 (3), unless the report is also a renewal submittal for a research, development, and demonstration plan. 
 
228Section 228   NR 520.15 Table 5 is repealed.
229Section 229   NR 524.02 (2) is amended to read:
NR 524.02 (2)This chapter applies to the solid waste disposal facilities specified in sub. (1) only during the time that the facility is approved by the department to conduct solid waste disposal operations. Certification of persons participating in or responsible for the operation of solid waste disposal facilities is not required at solid waste disposal facilities that have completed closure activities. 
230Section 230   NR 524.05 (intro.) (title), (1) (title) and (intro.), and (3) (title) and (intro.) are amended to read:
NR 524.05Municipal, mixed waste, high volume industrial waste, and small and intermediate size construction and demolition waste disposal facilities.  The owner or operator of a solid waste disposal facility shall comply with one of the following: 
(1)Municipal, and mixed waste, and intermediate size construction and demolition waste disposal facilities.  The owner or operator of a solid waste disposal facility that is not a small size construction and demolition waste disposal facility under s. NR 500.03 (121) (213) or a solid waste disposal facility used primarily for the disposal of high volume industrial waste shall do all of the following: 
(3)Small size construction and demolition waste disposal facilities.  The owner or operator of a small size construction and demolition site waste disposal facility shall do all of the following: 
231Section 231   NR 524.08 (3) (d) is amended to read:
  NR 524.08 (3) (d) Persons seeking certification as facility managers and site operators shall file an examination application with the department and pay fees required under s. NR 520.04 (6). Applications and fees shall be submitted to the department no later than 10 business 14 days prior to the examination date.
232Section 232 Effective Date. This rule takes effect on the first day of the month following publication in the Wisconsin Administrative Register as provided in s. 227.22 (2) (intro.), Stats.
233Section 233 Board adoption. This rule was approved and adopted by the State of Wisconsin Natural Resources Board on January 22, 2025.
Dated at Madison, Wisconsin _____________________________.
        STATE OF WISCONSIN    
          DEPARTMENT OF NATURAL RESOURCES                
          BY ______________________________________
            For Karen Hyun, Ph.D., Secretary
Loading...
Loading...
Links to Admin. Code and Statutes in this Register are to current versions, which may not be the version that was referred to in the original published document.