TABLE 2 Fee Schedule – All Facilities Except Landfills And and Surface Impoundments |
Facility Type | Initial Site & Construction Inspection Fees (1)1 | Plan Review Fee (2) | Plan Modification or Exemption Request | Construction Documentation Review Fee | Annual License Fee |
Beneficial Use | $550 | $550 | $550 | $550 | N/A |
Collection and Transportation | N/A | N/A | N/A | N/A | $110 |
Each Additional Truck | N/A | N/A | N/A | N/A | $33 |
Transfer Facility (3) |
Exempt (up to 50 tons/day) | $550 | N/A | N/A | N/A | $165 |
Small (>50 to 100 tons/day) | $550 | $660 | $330 | $330 | $165 |
Large (>100 tons/day) | $550 | $1,650 | $550 | $660 | $550 |
Processing Facility (4) | $550 | $3,300 | $1,100 | $1,100 | $550 |
Storage Facility (3) |
Exempt (up to 50 tons/day) | $550 | N/A | N/A | N/A | $550 |
Non-Exempt (>50 tons/day) | $550 | $1,650 | $550 | $660 | $550 |
Incineration Facility(4) | $550 | $7,700 | $1,650 | $1,100 | $7,700 |
Air Curtain Destructor | $550 | $330 | $330 | $165 | $165 |
Woodburning Facility | $550 | $165 | $165 | N/A | $165 |
One-Time Disposal | $550 | $660 | $660 | N/A | N/A |
Municipal Waste Combustor |
Small | $550 | $1,650 | $550 | $660 | $660 |
Large (>10 tons/day) | $550 | $7,700 | $1,650 | $1,100 | $7,700 |
Landspreading Facility |
Exempt | $550 | $660 | $550 | N/A | N/A |
Non-Exempt | $550 | $1,650 | $550 | N/A | N/A |
Infectious Waste Transport | N/A | N/A | N/A | N/A | $275 |
Each Additional Truck | N/A | N/A | N/A | N/A | $22 |
Infect. Waste Annual Report | N/A | N/A | N/A | N/A | $55 (5)2 |
Medical Waste Reduction Plan | N/A | $660 (6)3 | $550 | N/A | N/A |
Low Hazard Exemption under s. NR 500.08 (3m) and (4) or s. 289.43 (8), Stats. | N/A | $2,000 | N/A | N/A | N/A |
(1)1 The initial site inspection fee doubles to $1,100 if preliminary screening prior to field inspection indicates the possible presence of endangered resources or sites of historical or archeological significance. This fee also applies to each compliance inspection performed per s. NR 502.05 (3) (k) 8. or 502.07 (2r) (g). |
(2) The plan review fees specified in Table 2 cover the department’s review from initial submittal through approval or denial of the report or plan. An applicant may withdraw and revise or supplement a report or plan prior to it being deemed complete and resubmit it without paying an additional review fee. The applicant shall pay an additional plan review fee as specified in Table 2 for resubmittal of a plan which has been withdrawn after having been determined to be complete, or for review of a report that has twice been declared incomplete. |
(3) A plan modification, as referred to in Table 2, is a submittal which proposes to modify a plan of operation or closure plan previously approved by the department. |
(4) The department shall waive the plan review fees and license fees for a processing facility, including a composting facility, an electronics processing facility, or an incinerator that has a primary purpose of converting solid waste into usable materials, products, or energy. The waiver does not include the initial site and construction inspection fees or the construction documentation review fee. |
(5)2 This is an annual filing fee. A $25 late fee will be added for annual reports received after March 1 of the following calendar year. |
(6)3 If the department requires a medical facility to submit its medical waste reduction plan under s. NR 526.22, the plan review fee shall also be submitted. |
Submittal, Inspection, or License Type | Landfill Type |
All Landfills and Surface Impoundments except ch. NR 503 Landfills | Small Size Construction & Demo Waste Landfills (s. NR 503.09) and One-time Disposal Landfills (s. NR 503.08) | Intermediate Size Construction & Demo Waste Landfills (s. NR 503.10) |
Initial Site Report - Fee applies to each location (ch. NR 509) | $3,300 | N/A | N/A |
Feasibility Report (ch. NR 512) | $22,000 until 12/31/2026 $33,000 effective 1/1/2027 $44,000 effective 1/1/2028 $40,000 for vertical-only expansion, effective 1/1/2028 | N/A | N/A |
Additional $2,000 per each s. NR 504.04 (3) locational item exemption request Additional $2,000 for combined ch. NR 140 groundwater standard exemption requests |
Modification to a previously approved Feasibility Report | $5,000 | N/A | N/A |
Plan of Operation (chs. NR 503 and 514) | $7,700 until 12/31/2026 $16,500 effective 1/1/2027 $22,000 effective 1/1/2028 $20,000 for vertical-only expansion, effective 1/1/2028 | $1,100 | $7,700 |
Modification to previously approved Plan of Operation (chs. NR 503 and 514, and s. NR 520.04 (4) (h)) | $1,650 until 12/31/2026 $2,625 effective 1/1/2027 $3,500 effective 1/1/2028 | $550 | $1,650 |
$30,500 for plan of operation modification for initial permitting of CCR Landfills under s. NR 514.045 (1) |
Supplemental Review (s. NR 520.04 (4) (i)) | $1,650 until 12/31/2026 $2,625 effective 1/1/2027 $3,500 effective 1/1/2028 | $550 | $1,650 |
Expedited Plan Modification (s. NR 514.09) | $1,000 until 12/31/2026 $1,750 effective 1/1/2027 | N/A | N/A |
Construction Documentation (chs. NR 503 and 516)1 | $1,100 until 12/31/2026 $2,250 effective 1/1/2027 $3,000 effective 1/1/2028 | $220 | $1,100 |
Closure Plan (ch. NR 514) | $5,500 | N/A | N/A |
Landfill Stability Plan (s. NR 514.07 (9)) submitted separately from a plan of operation report | $2,500 | N/A | N/A |
Inspection Including the following: Initial Site Inspections (chs. NR 503 and 509)2 Construction Inspections3 (chs. NR 503 and 516) | $550 until 12/31/2026 $900 effective 1/1/2027 $1,210 effective 1/1/2028 | $550 | $550 |
Annual Operating License4 (s. NR 520.04 (1) (c)) or Long-term Care License Transfer Fee (s. NR 520.04 (2)) | $7,700 | N/A | N/A |
Annual Operation Inspection Fee (ss. NR 503.09 (9) and 503.10 (9) (b)) | N/A | $1,650 | $3,850 |
Authorization to Begin Long-term Care Period (s. NR 520.04 (3)) | N/A | N/A | $6,600 |
Long-term Care License5 (s. NR 520.04 (3)) | $6,600 until 12/31/2026 $7,700 effective 1/1/2027 | N/A | N/A |
Annual Report6 (chs. NR 503 and 506) | $500 | $500 | $500 |
Research, Development, and Demonstration Plan (s. NR 514.10) if submitted separate from a plan of operation | $2,500 initial plan submittal $2,500 each renewal submittal | N/A | N/A |