281.37(1)(a)6. 6. A habitat used by state or federally designated threatened or endangered species.
281.37(1)(a)7. 7. A state park, forest, trail or recreation area.
281.37(1)(a)8. 8. A state or federal fish and wildlife refuge or fish and wildlife management area.
281.37(1)(a)9. 9. A state or federal designated wilderness area.
281.37(1)(a)10. 10. A state natural area designated or dedicated under ss. 23.27 to 23.29.
281.37(1)(a)11. 11. Wild rice waters.
281.37(1)(a)12. 12. Surface waters identified by the department as outstanding or exceptional resource waters under s. 281.15.
281.37(1)(a)13. 13. Any other area identified by the department by rule.
281.37(1)(b) (b) "Mitigation project" means the restoration, enhancement or creation of wetlands to compensate for adverse impacts to other wetlands. "Mitigation project" includes using credits from a wetlands mitigation bank.
281.37(1)(d) (d) "Wetlands mitigation bank" means a system of accounting for wetland loss and compensation that includes one or more sites where wetlands are restored, enhanced or created to provide transferable credits to be subsequently applied to compensate for adverse impacts to other wetlands.
281.37(1)(e) (e) "Wetland water quality standards" means water quality standards promulgated under s. 281.15 (1) that affect wetlands.
281.37(1)(f) (f) "Working day" has the meaning given in s. 227.01 (14).
281.37(2) (2)Issuing permits.
281.37(2)(a)(a) The department may consider a mitigation project as part of an application, in combination with the requirements under par. (b), for complying with any wetland water quality standards in determining whether to issue a permit for, or to otherwise approve, an activity that affects a wetland under ss. 59.692, 61.351, 62.231, 87.30, 281.11 to 281.47 or 281.49 to 281.85 or ch. 30, 31, 283, 289, 291, 292, 293, 295 or 299. This subsection does not entitle an applicant to a permit or other approval in exchange for conducting a mitigation project.
281.37(2)(b) (b) The department may not consider a mitigation project in reviewing an application under par. (a) unless the applicant demonstrates that all appropriate and practicable measures will be taken to avoid and minimize adverse impacts on the wetland.
281.37(2)(c) (c) The department may not consider a mitigation project in reviewing an application under par. (a) for an activity that adversely affects a wetland in an area of special natural resource interest or for an activity that adversely affects an area of special natural resource interest.
281.37(2)(d) (d) If the department determines that the conditions of a permit or other authorization issued by the U.S. Army Corps of Engineers for an activity that affects a wetland do not meet the requirements of any guidelines established in the memorandum of agreement under sub. (4), the department may impose additional conditions to ensure that the requirements are met. The department may not require that the acreage of a mitigation project considered under par. (a) exceed the acreage that is required for the project under the guidelines established in the memorandum of agreement under sub. (4).
281.37(2m) (2m)Subsequent protection for wetlands.
281.37(2m)(a)1.1. A person who is the holder of a permit or other approval that authorizes a mitigation project shall grant a conservation easement under s. 700.40 to the department to ensure that a wetland that is being restored, enhanced, or created will not be destroyed or substantially degraded by any subsequent proprietor of or holder of interest in the property on which the wetland is located. The department shall revoke the permit or other approval if the holder of the permit or other approval fails to take these measures.
281.37(2m)(a)2. 2. A person who is restoring, enhancing, or creating a wetland to provide transferable credits as part of a wetlands mitigation bank shall grant a conservation easement under s. 700.40 to the department, to ensure that the wetland will not be destroyed or substantially degraded by any subsequent proprietor of or holder of interest in the property on which the wetland is located.
281.37(2m)(b) (b) Notwithstanding par. (a), the department shall modify or release a conservation easement granted under par. (a) if all of the following apply:
281.37(2m)(b)1. 1. The department determines that part or all of the restored, enhanced or created wetland ceases to be a wetland.
281.37(2m)(b)2. 2. The person who is required to grant the conservation easement did not contribute to the loss of the wetland specified in subd. 1.
281.37(2m)(b)3. 3. Any subsequent proprietor of or holder of interest in the property on which the wetland specified in subd. 1. is located did not contribute to the loss of the wetland.
281.37(3) (3)Rules. The department shall promulgate rules to establish a process for consideration of wetland compensatory mitigation under sub. (2). Upon promulgation, the rules shall apply to any application or other request for an initial determination for a permit or other authorization that is pending with the department on the date on which the rules take effect. The rules shall address all of the following:
281.37(3)(a) (a) Requirements for the avoidance and minimization of adverse impacts to the wetland that will be affected by the permitted activity.
281.37(3)(b) (b) The conditions under which credits in a wetlands mitigation bank may be used for wetland compensatory mitigation.
281.37(3)(c) (c) Enforcement of a requirement to implement a mitigation project.
281.37(3)(d) (d) Baseline studies of the wetland that will be affected by the permitted activity and of the mitigation project site.
281.37(3)(e) (e) Plan and project design requirements for a mitigation project, which shall consider the relation of the project design to the hydrology of the watershed in which a mitigation project is located.
281.37(3)(f) (f) The comparability of a wetland that will be restored, enhanced or created to the wetland that will be adversely affected by the permitted activity, including all of the following:
281.37(3)(f)1. 1. Consideration of the size, location, type and quality of the wetlands.
281.37(3)(f)2. 2. Consideration of the functional values performed by the wetlands.
281.37(3)(g) (g) The establishment of a process for determining replacement ratios.
281.37(3)(h) (h) Standards for measuring the short-term and long-term success of a mitigation project and requirements for the short-term and long-term monitoring of a mitigation project.
281.37(3)(i) (i) Remedial actions to be taken by the applicant if a mitigation project is not successful and actions to be taken by a wetlands mitigation bank if a mitigation project on which mitigation credits are based is not successful.
281.37(3)(j) (j) Establishment of an expedited decision-making process for activities adversely affecting wetlands that are less than one acre in size and that have negligible functional values.
281.37(3m) (3m)Expedited decision-making process.
281.37(3m)(a)(a) The expedited decision-making process established under the rules under sub. (3) (j) shall include a requirement that the department shall decide whether to issue a permit for, or otherwise approve, an activity within 60 working days after a complete application for the permit or approval has been received by the department if all of the following apply:
281.37(3m)(a)1. 1. The wetland that will be adversely affected is not located in a floodplain.
281.37(3m)(a)2. 2. The application does not involve the issuance of a permit or other approval under ch. 30.
281.37(3m)(am) (am) The expedited decision-making process established under the rules under sub. (3) (j) may limit the scope of alternatives to the proposed activities that must be considered in reviewing an application under that process.
281.37(3m)(b) (b) The department is exempt from the time limit under par. (a) if the department determines that weather conditions prevent the department from making a determination within 60 working days after the receipt of the complete application.
281.37(4) (4)Memorandum of agreement. The department shall initiate negotiations with the U.S. army corps of engineers to develop a memorandum of agreement establishing guidelines for mitigation projects and wetland mitigation banks. The guidelines shall address all of the topics described in sub. (3) (a) to (i).
281.37(5) (5)Report to legislature. No later than January 31, 2003, and no later than January 31 of each subsequent odd-numbered year, the department shall submit to the legislature under s. 13.172 (2) a report that provides an analysis of the impact of the implementation of this section on wetland resources and on the issuance of permits or other approvals under ss. 59.692, 61.351, 62.231, 87.30, 281.11 to 281.47 or 281.49 to 281.85 or ch. 30, 31, 283, 289, 291, 292, 293, 295, or 299.
281.37 History History: 1999 a. 147; 2001 a. 6 ss. 1 to 5; Stats. 2001 s. 281.37; 2001 a. 38.
281.37 Cross-reference Cross Reference: See also chs. NR 300 and 350, Wis. adm. code.
subch. IV of ch. 281 SUBCHAPTER IV
WATER AND SEWAGE FACILITIES; SEPTAGE DISPOSAL
281.41 281.41 Approval of plans.
281.41(1)(1)
281.41(1)(a)(a) Except as provided under sub. (2), every owner within the time prescribed by the department, shall file with the department a certified copy of complete plans of a proposed system or plant or extension thereof, in scope and detail satisfactory to the department, and, if required, of existing systems or plants, and any other information concerning maintenance, operation and other details that the department requires, including the information specified under s. 281.35 (5) (a), if applicable. Material changes with a statement of the reasons shall be likewise submitted. Before plans are drawn, a statement concerning the improvement may be made to the department and the department may, if requested, outline generally what it will require. Upon receipt of the plans for approval, the department or its authorized representative shall notify the owner of the date of receipt.
281.41(1)(b) (b) Within 90 days from the time of receipt of complete plans or within the time specified in s. 281.35 (5) (c), if applicable, the department or its authorized representative shall examine and take action to approve, approve conditionally or reject the plans and shall state in writing any conditions of approval or reasons for rejection. Approval or disapproval of the plans and specifications may not be contingent upon eligibility of the proposed project for federal aid. The time period for review may be extended by agreement with the owner if the plans and specifications cannot be reviewed within the specified time limitation due to circumstances beyond the control of the department or in the case of extensive installation involving expenditures of $350,000 or more. The extension may not exceed 6 months. Failure of the department or its authorized representative to act before the expiration of the time period allowed for review shall constitute an approval of the plans, and upon demand a written certificate of approval shall be issued. Approval may be subject to modification by the department upon due notice.
281.41(1)(c) (c) Construction or material change shall be according to approved plans only. The department may disapprove plans that are not in conformance with any existing approved areawide waste treatment management plan prepared pursuant to the federal water pollution control act, P.L. 92-500, as amended, and shall disapprove plans that do not meet the grounds for approval specified under s. 281.35 (5) (d), if applicable. The department shall require each person whose plans are approved under this section to report that person's volume and rate of water withdrawal, as defined under s. 281.35 (1) (m), and that person's volume and rate of water loss, as defined under s. 281.35 (1) (L), if any, in the form and at the times specified by the department.
281.41(2) (2) The department may, by rule, exempt an owner of a specific type of system or plant from the requirements of sub. (1) or modify the requirements of sub. (1) for a specific type of system or plant.
281.41 History History: 1977 c. 418; 1985 a. 60; 1991 a. 39; 1995 a. 227 s. 405; Stats., 1995 s. 281.41; 1999 a. 85.
281.41 Cross-reference Cross Reference: See also chs. NR 108, 110, and 142, Wis. adm. code.
281.43 281.43 Joint sewerage systems.
281.43(1) (1) The department of natural resources may require the sewerage system, or sewage or refuse disposal plant of any governmental unit including any town, village or city, to be so planned and constructed that it may be connected with that of any other town, village or city, and may, after hearing, upon due notice to the governmental units order the proper connections to be made or a group of governmental units including cities, villages, town sanitary districts or town utility districts may construct and operate a joint sewerage system under this statute without being so required by order of the department of natural resources but following hearing and approval of the department.
281.43(1m) (1m) An order by the department for the connection of unincorporated territory to a city or village system or plant under this section shall not become effective for 30 days following issuance. Within 30 days following issuance of the order, the governing body of a city or village subject to an order under this section may commence an annexation proceeding under s. 66.0219 to annex the unincorporated territory subject to the order. If the result of the referendum under s. 66.0219 (4) is in favor of annexation, the territory shall be annexed to the city or village for all purposes, and sewerage service shall be extended to the territory subject to the order. If an application for an annexation referendum is denied under s. 66.0219 (2) or the referendum under s. 66.0219 (4) is against the annexation, the order shall be void. If an annexation proceeding is not commenced within the 30-day period, the order shall become effective.
281.43(2) (2)
281.43(2)(a)(a) When one governmental unit renders service to another under this section, reasonable compensation shall be paid. The officials in charge of the system, of the governmental unit furnishing the service shall determine the reasonable compensation and report to its clerk who shall, on or before August 1 of each year, certify a statement thereof to the clerk of the governmental unit receiving the service. The clerk of the governmental unit receiving the service shall extend the amount shown in the statement as a charge on the tax roll, in the following manner:
281.43(2)(a)1. 1. If the service rendered is available to substantially all improved real estate in the member governmental unit receiving the service, the charges shall be placed upon the tax roll of the member governmental unit as a general tax.
281.43(2)(a)2. 2. If the service rendered is for the benefit of public highways in, or real estate owned or operated by, the member governmental unit receiving the service, the charges for the service shall be placed upon the tax roll of the member governmental unit as a general tax.
281.43(2)(a)3. 3. If the service rendered does not come under the provisions of subd. 1. or 2., the charges for the service shall be placed upon the tax roll of the member governmental unit as a special tax upon each parcel of real estate benefited; and when collected it shall be paid to the treasurer of the member governmental unit rendering the service. Where the charges are to be extended on the tax roll under the provisions of this subdivision, the clerk of the member governmental unit furnishing the service shall itemize the statement showing separately the amount charged to each parcel of real estate benefited.
281.43(2)(b) (b) If, due to delay in determination, a charge described in par. (a) cannot be extended on the tax roll of any particular year, it shall be extended as soon as possible.
281.43(3) (3) If the governing body of any governmental unit deems the charge unreasonable, it may by resolution within 20 days after the filing of the report with its clerk:
281.43(3)(a) (a) Submit to arbitration by 3 reputable and experienced engineers, one chosen by each governmental unit, and the 3rd by the other 2. If the engineers are unable to agree, the vote of 2 shall be the decision. They may affirm or modify the report, and shall submit their decision in writing to each governmental unit within 30 days of their appointment unless the time be extended by agreement of the governmental units. The decision shall be binding. Election to so arbitrate shall be a waiver of right to proceed by action. Two-thirds of the expense of arbitration shall be paid by the governmental unit requesting it, and the balance by the other.
281.43(3)(b) (b) Institute a proceeding for judicial review under ch. 227.
281.43(4) (4)
281.43(4)(a)(a) Any 2 or more governmental units, including cities, villages, town sanitary districts or town utility districts not wishing to proceed under sub. (2) may jointly construct, operate and maintain a joint sewerage system, inclusive of the necessary intercepting sewers and sewerage treatment works. Such joint action by 2 governmental units shall be carried out by a sewerage commission consisting of one member appointed by each of the governing bodies of such governmental units and a 3rd member to be selected by the 2 members so appointed, or in lieu thereof said sewerage commission may consist of 2 members appointed by the governing body of each governmental unit and a 5th member to be selected by the 4 members so appointed or where more than 2 governmental units act to form the commission, the representation on the commission shall be in accordance with a resolution approved by the member governmental units.
281.43(4)(b)1.1. Where such sewerage commission shall consist of 3 members, the members chosen by the 2 members first appointed shall serve for 2 years, while the members appointed by the governing bodies of the 2 governmental units shall serve for terms of 4 and 6 years, respectively, the length of term of each to be determined by lot. All subsequent appointments, except for unexpired terms, shall be for 6 years. All such members shall serve until their successors shall have been appointed and shall have qualified.
281.43(4)(b)2. 2. Where such sewerage commission shall consist of 5 members, the member chosen by the 4 members first appointed shall serve for one year, while the members appointed by the governing bodies of the 2 governmental units shall serve for terms of 2, 3, 4 and 5 years respectively, the length of terms of each to be determined by lot. All subsequent appointments, except for unexpired terms, shall be for 6 years. All such members shall serve until their successors shall have been appointed and shall have qualified.
281.43(4)(b)3. 3. Where such sewerage commission representation shall be formed by approval of a resolution, the resolution shall state the method of appointing commissioners and the term of office of each commissioner.
281.43(4)(c) (c) The sewerage commissioners shall project, plan, construct and maintain in the district comprising the member governmental units intercepting and other main sewers for the collection and transmission of house, industrial and other sewage to a site or sites for disposal selected by them, such sewers to be sufficient, in the judgment of the sewerage commissioners, to care for such sewage of the territory included in such district. The sewerage commissioners shall project, plan, construct and operate sewage disposal works at a site or sites selected by them which may be located within or outside of the territory included in the district. The sewerage commissioners may also project, plan, construct and maintain intercepting and other main sewers for the collection and disposal of storm water which shall be separate from the sanitary sewerage system. The sewerage commissioners may also project, plan, construct and operate solid waste disposal works at a site or sites selected by them which may be located within or outside of the territory included in the district or by contract with counties or municipalities which have solid waste disposal facilities. The sewerage commissioners may employ and fix compensation for engineers, assistants, clerks, employees and laborers, or do such other things as may be necessary for the due and proper execution of their duties. Such sewage disposal works may be used by the sewerage commissioners and by such governmental units for the disposal of garbage, refuse and rubbish.
281.43(4)(d) (d) Such sewerage commission shall constitute a body corporate by the name of "(Insert name of governmental units or area) Sewerage Commission," by which in all proceedings it shall thereafter be known. It may purchase, take and hold real and personal property for its use and convey and dispose of the same. This grant of power shall be retroactive to September 13, 1935 for commissions formed prior to January 1, 1972. Except as provided in this subsection the sewerage commissioners shall have the power and proceed as a common council and board of public works in cities in carrying out the provisions of par. (c). All borrowing under s. 24.61 (3) (a) 5. and all bond issues and appropriations made by said sewerage commission shall be subject to the approval of the governing bodies of the respective governmental units.
281.43(4)(e) (e) Each such governmental unit shall pay for its proportionate share of such sewerage system, including additions thereto, and also its proportionate share of all operation and maintenance costs as may be determined by the sewerage commission. Each governmental unit may borrow money and issue revenue or general obligation bonds therefor, for the acquisition, construction, erection, enlargement and extension of a joint sewage disposal plant or refuse or rubbish or solid waste disposal plant or system or any combination of plants provided under this section, and to purchase a site or sites for the same. Each governmental unit may, if it so desires, proceed under s. 66.0821 in financing its portion of the cost of the construction, operation and maintenance of the joint sewage disposal plant or plants provided for in this section, or system.
281.43(4)(f) (f) Any such governmental unit being aggrieved by the determination of the sewerage commission on matters within its jurisdiction may appeal to the circuit court as provided in sub. (3) (b).
281.43 History History: 1971 c. 89, 276; 1977 c. 187; 1979 c. 176; 1985 a. 49; 1995 a. 225; 1995 a. 227 s. 408; Stats. 1995 s. 281.43; 1997 a. 35; 1999 a. 150 s. 672.
281.43 Annotation Sub. (1m), which voids a DNR sewerage connection order if the electors in the affected town area reject annexation to the city ordered to extend sewerage service, represents a valid legislative balancing and accommodation of 2 statewide concerns: urban development and pollution control. City of Beloit v. Kallas, 76 Wis. 2d 61, 250 N.W.2d 342.
281.43 Annotation A joint sewerage commission may enact and enforce regulations required of it under Clean Water Act of 1977, but it cannot make appropriations or issue bonds without approval of the governing bodies that established it. 68 atty. Gen. 83.
281.45 281.45 House connections. To assure preservation of public health, comfort and safety, any city, village or town or town sanitary district having a system of waterworks or sewerage, or both, may by ordinance require buildings used for human habitation and located adjacent to a sewer or water main, or in a block through which one or both of these systems extend, to be connected with either or both in the manner prescribed. If any person fails to comply for more than 10 days after notice in writing the municipality may impose a penalty or may cause connection to be made, and the expense thereof shall be assessed as a special tax against the property. Except in 1st class cities, the owner may, within 30 days after the completion of the work, file a written option with the municipal clerk stating that he or she cannot pay the amount in one sum and asking that it be levied in not to exceed 5 equal annual installments, and the amount shall be so collected with interest at a rate not to exceed 15% per year from the completion of the work, the unpaid balance to be a special tax lien.
281.45 History History: 1979 c. 110 s. 60 (13); 1979 c. 221; 1983 a. 150; 1995 a. 227 s. 407; Stats. 1995 s. 281.45.
281.47 281.47 Sewage drains; sewage discharge into certain lakes.
281.47(1)(1)
281.47(1)(a)(a) When any city, village, town or owner has constructed or constructs a sewage system complying with s. 281.41, the outflow or effluent from such system may be discharged into any stream or drain constructed pursuant to law, but no such outflow of untreated sewage or effluent from a primary or secondary treatment plant from a city, village, town, town sanitary district or metropolitan sewage district in a county having a population of 240,000 or more, according to the latest U.S. bureau of census figures available including any special census of municipalities within the county, any part of which is located within a drainage basin which drains into a lake of more than 2 square miles and less than 16 square miles in area, shall be discharged directly into, or through any stream, or through any drain, into such a lake located within 18 miles of the system or plant of such city, village, town, town sanitary district or metropolitan sewage district. All necessary construction of plant, system or drains for full compliance with this subsection in the discharge of untreated sewage or sewage effluent from all existing primary or secondary plants shall be completed by September 1, 1970, and the plans for any new system or plant shall include provisions for compliance with this subsection. The department may at any time order and require any owner of an existing plant to prepare and file with it, within a prescribed time, preliminary or final plans or both, for proposed construction to comply with this subsection.
281.47(1)(b) (b) Any municipality, which, on April 30, 1972, has an operating sewerage collection and treatment system and has an application for attachment to a metropolitan sewerage district pending in the county court, in such a county, any part of which is located within such a drainage basin and which is located within 10 miles of a metropolitan sewerage district on September 1, 1967, shall be added to the metropolitan sewerage district upon application of the governing body of the municipality as provided in s. 66.205 (1), 1969 stats., if such petitioning municipality pays its fair share of the cost of attachment as determined by mutual agreement or a court of competent jurisdiction.