66.0401(1)(b)
(b) Does not significantly increase the cost of the system or significantly decrease its efficiency.
66.0401(1)(c)
(c) Allows for an alternative system of comparable cost and efficiency.
66.0401(2)
(2) Authority to require trimming of blocking vegetation. A county, city, village, or town may provide by ordinance for the trimming of vegetation that blocks solar energy, as defined in
s. 66.0403 (1) (k), from a collector surface, as defined under
s. 700.41 (2) (b), or that blocks wind from a wind energy system, as defined in
s. 66.0403 (1) (m). The ordinance may include, but is not limited to, a designation of responsibility for the costs of the trimming. The ordinance may not require the trimming of vegetation that was planted by the owner or occupant of the property on which the vegetation is located before the installation of the solar or wind energy system.
66.0401 History
History: 1981 c. 354;
1981 c. 391 s.
210;
1993 a. 414;
1999 a. 150 ss.
78,
79,
84; Stats. 1999 s. 66.0401;
2001 a. 30.
66.0401 Annotation
This section is a legislative restriction on the ability of municipalities to regulate solar and wind energy systems. The statute is not superceded by s. 66.0403 or municipal zoning or conditional use powers. A municipality's consideration of an application for a conditional use permit for a system under this section must be in light of the restrictions placed on local regulation by this section. State ex rel. Numrich v. City of Mequon Board of Zoning Appeals, 2001 WI App 88,
242 Wis. 2d 677,
626 N.W.2d 366,
00-1643.
66.0403
66.0403
Solar and wind access permits. 66.0403(1)(a)
(a) "Agency" means the governing body of a municipality which has provided for granting a permit or the agency which the governing body of a municipality creates or designates under
sub. (2). "Agency" includes an officer or employee of the municipality.
66.0403(1)(b)
(b) "Applicant" means an owner applying for a permit under this section.
66.0403(1)(c)
(c) "Application" means an application for a permit under this section.
66.0403(1)(d)
(d) "Collector surface" means any part of a solar collector that absorbs solar energy for use in the collector's energy transformation process. "Collector surface" does not include frames, supports and mounting hardware.
66.0403(1)(e)
(e) "Collector use period" means 9 a.m. to 3 p.m. standard time daily.
66.0403(1)(f)
(f) "Impermissible interference" means the blockage of wind from a wind energy system or solar energy from a collector surface or proposed collector surface for which a permit has been granted under this section during a collector use period if such blockage is by any structure or vegetation on property, an owner of which was notified under
sub. (3) (b). "Impermissible interference" does not include:
66.0403(1)(f)1.
1. Blockage by a narrow protrusion, including but not limited to a pole or wire, which does not substantially interfere with absorption of solar energy by a solar collector or does not substantially block wind from a wind energy system.
66.0403(1)(f)2.
2. Blockage by any structure constructed, under construction or for which a building permit has been applied for before the date the last notice is mailed or delivered under
sub. (3) (b).
66.0403(1)(f)3.
3. Blockage by any vegetation planted before the date the last notice is mailed or delivered under
sub. (3) (b) unless a municipality by ordinance under
sub. (2) defines impermissible interference to include such vegetation.
66.0403(1)(g)
(g) "Municipality" means any county with a zoning ordinance under
s. 59.69, any town with a zoning ordinance under
s. 60.61, any city with a zoning ordinance under
s. 62.23 (7), any 1st class city or any village with a zoning ordinance under
s. 61.35.
66.0403(1)(h)
(h) "Owner" means at least one owner, as defined under
s. 66.0217 (1) (d), of a property or the personal representative of at least one owner.
66.0403(1)(i)
(i) "Permit" means a solar access permit or a wind access permit issued under this section.
66.0403(1)(j)
(j) "Solar collector" means a device, structure or a part of a device or structure a substantial purpose of which is to transform solar energy into thermal, mechanical, chemical or electrical energy.
66.0403(1)(k)
(k) "Solar energy" means direct radiant energy received from the sun.
66.0403(1)(L)
(L) "Standard time" means the solar time of the ninetieth meridian west of Greenwich.
66.0403(1)(m)
(m) "Wind energy system" means equipment that converts and then stores or transfers energy from the wind into usable forms of energy.
66.0403(2)
(2) Permit procedure. The governing body of every municipality may provide for granting a permit. A permit may not affect any land except land which, at the time the permit is granted, is within the territorial limits of the municipality or is subject to an extraterritorial zoning ordinance adopted under
s. 62.23 (7a), except that a permit issued by a city or village may not affect extraterritorial land subject to a zoning ordinance adopted by a county or a town. The governing body may appoint itself as the agency to process applications or may create or designate another agency to grant permits. The governing body may provide by ordinance that a fee be charged to cover the costs of processing applications. The governing body may adopt an ordinance with any provision it deems necessary for granting a permit under this section, including but not limited to:
66.0403(2)(b)
(b) Defining an impermissible interference to include vegetation planted before the date the last notice is mailed or delivered under
sub. (3) (b), provided that the permit holder shall be responsible for the cost of trimming such vegetation.
66.0403(3)(a)(a) In a municipality which provides for granting a permit under this section, an owner who has installed or intends to install a solar collector or wind energy system may apply to an agency for a permit.
66.0403(3)(b)
(b) An agency shall determine if an application is satisfactorily completed and shall notify the applicant of its determination. If an applicant receives notice that an application has been satisfactorily completed, the applicant shall deliver by certified mail or by hand a notice to the owner of any property which the applicant proposes to be restricted by the permit under
sub. (7). The applicant shall submit to the agency a copy of a signed receipt for every notice delivered under this paragraph. The agency shall supply the notice form. The information on the form may include, without limitation because of enumeration:
66.0403(3)(b)1.
1. The name and address of the applicant, and the address of the land upon which the solar collector or wind energy system is or will be located.
66.0403(3)(b)3.
3. That the permit, if granted, may affect the rights of the notified owner to develop his or her property and to plant vegetation.
66.0403(3)(b)4.
4. The telephone number, address and office hours of the agency.
66.0403(3)(b)5.
5. That any person may request a hearing under
sub. (4) within 30 days after receipt of the notice, and the address and procedure for filing the request.
66.0403(4)
(4) Hearing. Within 30 days after receipt of the notice under
sub. (3) (b), any person who has received a notice may file a request for a hearing on the granting of a permit or the agency may determine that a hearing is necessary even if no such request is filed. If a request is filed or if the agency determines that a hearing is necessary, the agency shall conduct a hearing on the application within 90 days after the last notice is delivered. At least 30 days prior to the hearing date, the agency shall notify the applicant, all owners notified under
sub. (3) (b) and any other person filing a request of the time and place of the hearing.
66.0403(5)(a)(a) The agency shall grant a permit if the agency determines that:
66.0403(5)(a)1.
1. The granting of a permit will not unreasonably interfere with the orderly land use and development plans of the municipality;
66.0403(5)(a)2.
2. No person has demonstrated that she or he has present plans to build a structure that would create an impermissible interference by showing that she or he has applied for a building permit prior to receipt of a notice under
sub. (3) (b), has expended at least $500 on planning or designing such a structure or by submitting any other credible evidence that she or he has made substantial progress toward planning or constructing a structure that would create an impermissible interference; and
66.0403(5)(a)3.
3. The benefits to the applicant and the public will exceed any burdens.
66.0403(5)(b)
(b) An agency may grant a permit subject to any condition or exemption the agency deems necessary to minimize the possibility that the future development of nearby property will create an impermissible interference or to minimize any other burden on any person affected by granting the permit. Such conditions or exemptions may include but are not limited to restrictions on the location of the solar collector or wind energy system and requirements for the compensation of persons affected by the granting of the permit.
66.0403(6)
(6) Record of permit. If an agency grants a permit:
66.0403(6)(a)
(a) The agency shall specify the property restricted by the permit under
sub. (7) and shall prepare notice of the granting of the permit. The notice shall include the identification required under
s. 706.05 (2) (c) for the owner and the property upon which the solar collector or wind energy system is or will be located and for any owner and property restricted by the permit under
sub. (7), and shall indicate that the property may not be developed and vegetation may not be planted on the property so as to create an impermissible interference with the solar collector or wind energy system which is the subject of the permit unless the permit affecting the property is terminated under
sub. (9) or unless an agreement affecting the property is filed under
sub. (10).
66.0403(6)(b)
(b) The applicant shall record with the register of deeds of the county in which the property is located the notice under
par. (a) for each property specified under
par. (a) and for the property upon which the solar collector or wind energy system is or will be located.
66.0403(7)
(7) Remedies for impermissible interference. 66.0403(7)(a)(a) Any person who uses property which he or she owns or permits any other person to use the property in a way which creates an impermissible interference under a permit which has been granted or which is the subject of an application shall be liable to the permit holder or applicant for damages, except as provided under
par. (b), for any loss due to the impermissible interference, court costs and reasonable attorney fees unless:
66.0403(7)(a)1.
1. The building permit was applied for prior to receipt of a notice under
sub. (3) (b) or the agency determines not to grant a permit after a hearing under
sub. (4).
66.0403(7)(b)
(b) A permit holder is entitled to an injunction to require the trimming of any vegetation which creates or would create an impermissible interference as defined under
sub. (1) (f). If the court finds on behalf of the permit holder, the permit holder shall be entitled to a permanent injunction, damages, court costs and reasonable attorney fees.
66.0403(8)
(8) Appeals. Any person aggrieved by a determination by a municipality under this section may appeal the determination to the circuit court for a review.
66.0403(9)
(9) Termination of solar or wind access rights. 66.0403(9)(a)(a) Any right protected by a permit under this section shall terminate if the agency determines that the solar collector or wind energy system which is the subject of the permit is:
66.0403(9)(a)1.
1. Permanently removed or is not used for 2 consecutive years, excluding time spent on repairs or improvements.
66.0403(9)(a)2.
2. Not installed and functioning within 2 years after the date of issuance of the permit.
66.0403(9)(b)
(b) The agency shall give the permit holder written notice and an opportunity for a hearing on a proposed termination under
par. (a).
66.0403(9)(c)
(c) If the agency terminates a permit, the agency may charge the permit holder for the cost of recording and record a notice of termination with the register of deeds, who shall record the notice with the notice recorded under
sub. (6) (b) or indicate on any notice recorded under
sub. (6) (b) that the permit has been terminated.
66.0403(10)
(10) Waiver. A permit holder by written agreement may waive all or part of any right protected by a permit. A copy of such agreement shall be recorded with the register of deeds, who shall record such copy with the notice recorded under
sub. (6) (b).
66.0403(11)
(11) Preservation of rights. The transfer of title to any property shall not change the rights and duties under this section or under an ordinance adopted under
sub. (2).
66.0403(12)(a)(a) This section may not be construed to require that an owner obtain a permit prior to installing a solar collector or wind energy system.
66.0403(12)(b)
(b) This section may not be construed to mean that acquisition of a renewable energy resource easement under
s. 700.35 is in any way contingent upon the granting of a permit under this section.
66.0403 Annotation
The owner of an energy system does not need a permit under this section. Barring enforceable municipal restrictions, an owner may construct a system without prior municipal approval. This section benefits and protects the owner of the system by restricting the use of nearby property to prevent an interference with the system. State ex rel. Numrich v. City of Mequon Board of Zoning Appeals, 2001 WI App 88,
242 Wis. 2d 677,
626 N.W.2d 366,
00-1643.
66.0403 Annotation
Wisconsin recognizes the power of the sun: Prah v. Maretti and the solar access act. 1983 WLR 1263.
66.0405
66.0405
Removal of rubbish. Cities, villages and towns may remove ashes, garbage, and rubbish from such classes of places in the city, village or town as the board or council directs. The removal may be from all of the places or from those whose owners or occupants desire the service. Districts may be created and removal provided for certain districts only, and different regulations may be applied to each removal district or class of property. The cost of removal may be funded by special assessment against the property served, by general tax upon the property of the respective districts, or by general tax upon the property of the city, village or town. If a city, village or town contracts for ash, garbage or rubbish removal service, it may contract with one or more service providers.
66.0405 History
History: 1993 a. 246;
1999 a. 150 s.
119; Stats. 1999 s. 66.0405.
66.0407(1)(a)
(a) "Destroy" means the complete killing of weeds or the killing of weed plants above the surface of the ground by the use of chemicals, cutting, tillage, cropping system, pasturing livestock, or any or all of these in effective combination, at a time and in a manner as will effectually prevent the weed plants from maturing to the bloom or flower stage.
66.0407(1)(b)
(b) "Noxious weed" means Canada thistle, leafy spurge and field bindweed (creeping Jenny) and any other weed the governing body of any municipality or the county board of any county by ordinance or resolution declares to be noxious within its respective boundaries.
66.0407(3)
(3) A person owning, occupying or controlling land shall destroy all noxious weeds on the land. The person having immediate charge of any public lands shall destroy all noxious weeds on the lands. The highway patrolman on all federal, state or county trunk highways shall destroy all noxious weeds on that portion of the highway which that highway patrolman patrols. The town board is responsible for the destruction of all noxious weeds on the town highways.
66.0407(4)
(4) The chairperson of each town, the president of each village and the mayor or manager of each city may annually on or before May 15 publish a class 2 notice, under
ch. 985, that every person is required by law to destroy all noxious weeds, as defined in this section, on lands in the municipality which the person owns, occupies or controls. A town, village or city which has designated as its official newspaper or which uses for its official notices the same newspaper as any other town, village or city may publish the notice under this subsection in combination with the other town, village or city.
66.0407(5)
(5) This section does not apply to Canada thistle or annual noxious weeds that are located on land that the department of natural resources owns, occupies or controls and that is maintained in whole or in part as habitat for wild birds by the department of natural resources.
66.0407 History
History: 1975 c. 394 s.
12;
1975 c. 421; Stats. 1975 s. 66.96;
1983 a. 112,
189;
1989 a. 56 s.
258;
1991 a. 39,
316;
1997 a. 287;
1999 a. 150 ss.
617 to
619; Stats. 1999 s. 66.0407.
66.0409
66.0409
Local regulation of firearms. 66.0409(1)(b)
(b) "Political subdivision" means a city, village, town or county.
66.0409(1)(c)
(c) "Sport shooting range" means an area designed and operated for the practice of weapons used in hunting, skeet shooting and similar sport shooting.
66.0409(2)
(2) Except as provided in
subs. (3) and
(4), no political subdivision may enact an ordinance or adopt a resolution that regulates the sale, purchase, purchase delay, transfer, ownership, use, keeping, possession, bearing, transportation, licensing, permitting, registration or taxation of any firearm or part of a firearm, including ammunition and reloader components, unless the ordinance or resolution is the same as or similar to, and no more stringent than, a state statute.
66.0409(3)(a)(a) Nothing in this section prohibits a county from imposing a sales tax or use tax under
subch. V of ch. 77 on any firearm or part of a firearm, including ammunition and reloader components, sold in the county.
66.0409(3)(b)
(b) Nothing in this section prohibits a city, village or town that is authorized to exercise village powers under
s. 60.22 (3) from enacting an ordinance or adopting a resolution that restricts the discharge of a firearm.
66.0409(4)(a)(a) Nothing in this section prohibits a political subdivision from continuing to enforce an ordinance or resolution that is in effect on November 18, 1995, and that regulates the sale, purchase, transfer, ownership, use, keeping, possession, bearing, transportation, licensing, permitting, registration or taxation of any firearm or part of a firearm, including ammunition and reloader components, if the ordinance or resolution is the same as or similar to, and no more stringent than, a state statute.
66.0409(4)(am)
(am) Nothing in this section prohibits a political subdivision from continuing to enforce until November 30, 1998, an ordinance or resolution that is in effect on November 18, 1995, and that requires a waiting period of not more than 7 days for the purchase of a handgun.
66.0409(4)(b)
(b) If a political subdivision has in effect on November 17, 1995, an ordinance or resolution that regulates the sale, purchase, transfer, ownership, use, keeping, possession, bearing, transportation, licensing, permitting, registration or taxation of any firearm or part of a firearm, including ammunition and reloader components, and the ordinance or resolution is not the same as or similar to a state statute, the ordinance or resolution shall have no legal effect and the political subdivision may not enforce the ordinance or resolution on or after November 18, 1995.