283.16(2)(a)(a) The department of administration, in consultation with the department of natural resources, shall determine whether attaining the water quality standard for phosphorus, adopted under
s. 281.15, through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible because it would cause substantial and widespread adverse social and economic impacts on a statewide basis. The department of administration may make separate determinations under this paragraph for statewide categories of point sources.
283.16(2)(b)
(b) The department of administration shall include all of the following in its determination under
par. (a), based on water quality based effluent limitations for phosphorus determined by the department of natural resources:
283.16(2)(b)1.
1. A calculation of the statewide cost of compliance with water quality based effluent limitations for phosphorus by point sources that cannot achieve compliance without major facility upgrades.
283.16(2)(b)2.
2. A calculation of the statewide per household cost for water pollution control by publicly owned treatment works that cannot achieve compliance with water quality based effluent limitations for phosphorus without major facility upgrades, including the projected costs of compliance with those water quality based effluent limitations, and a calculation of the percentage of median household income the per household cost represents.
283.16(2)(b)4.
4. A determination of whether the cost of compliance with water quality based effluent limitations for phosphorus by point sources that cannot achieve compliance without major facility upgrades would cause substantial adverse social and economic impacts on a statewide basis.
283.16(2)(b)5.
5. A determination of whether the cost of compliance with water quality based effluent limitations for phosphorus by point sources that cannot achieve compliance without major facility upgrades would cause widespread adverse social and economic impacts on a statewide basis.
283.16(2)(c)
(c) The department of administration shall make a preliminary determination under
par. (a) no later than the 240th day after April 25, 2014. The department of administration shall provide public notice, through an electronic notification system that it establishes or selects, of its preliminary determination and shall provide the opportunity for public comment on the preliminary determination for at least 30 days following the public notice.
283.16(2)(d)
(d) The department of administration shall consider any public comments in making its final determination under
par. (a) and shall make the final determination no later than the 30th day after the end of the public comment period.
283.16(2)(e)
(e) The department of administration shall send a notice that describes its final determination under
par. (a) to the legislative reference bureau for publication in the administrative register.
283.16(2)(em)
(em) If the department of administration determines under
par. (a) that attaining the water quality standard for phosphorus through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible, the department of natural resources shall seek approval under
40 CFR Part 131 from the federal environmental protection agency for the variance under this section.
283.16(2)(f)
(f) If the department of administration determines under
par. (a) that attaining the water quality standard for phosphorus through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible, the determination remains in effect until the department of administration finds under
sub. (3) (c) that the determination is no longer accurate.
283.16(2m)
(2m) Water quality standards review. Every 3 years as part of the review of water quality standards required by
33 USC 1313 (c) (1), if the variance under this section is in effect, the department shall determine whether formal review under
sub. (3) should be undertaken, considering any comments it receives on the variance under this section.
283.16(3)
(3) Review of findings and requirements of variance. 283.16(3)(a)(a) In 2024, if a determination under
sub. (2) (a) that attaining the water quality standard for phosphorus through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible is in effect, or upon a determination under
sub. (2m) that review under this subsection should be undertaken, the department of administration, in consultation with the department of natural resources, shall prepare a report, no later than September 1, to evaluate whether the determination under
sub. (2) (a) remains accurate. The department of administration shall consult with permittees that would be subject to water quality based effluent limitations for phosphorus and other interested parties in preparing the report.
283.16(3)(b)
(b) The department of natural resources shall provide all of the following to the department of administration for the report under
par. (a):
283.16(3)(b)1.
1. A determination of whether technology is reasonably available for point sources to comply with effluent limitations for phosphorus that are more stringent than those in
sub. (6) (a).
283.16(3)(b)2.
2. A determination of whether technology is reasonably available for any category of point sources to comply with effluent limitations for phosphorus that are more stringent than those in
sub. (6) (a).
283.16(3)(b)3.
3. A determination of whether any technology that is reasonably available for compliance with effluent limitations for phosphorus that are more stringent than those in
sub. (6) (a) is cost effective.
283.16(3)(c)
(c) Based on its report under
par. (a), the department of administration, in consultation with the department of natural resources, shall decide whether the determination that attaining the water quality standard for phosphorus through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible remains accurate.
283.16(3)(cm)
(cm) If the department of administration decides under
par. (c) that the determination remains accurate, the department of natural resources shall decide whether it is appropriate to apply more stringent effluent limitations than those in
sub. (6) (a) to all point sources or to any category of point sources, based on the availability and cost effectiveness of technology for compliance and, if so, specify those more stringent effluent limitations based on the report under
par. (a).
283.16(3)(d)
(d) The department of administration shall provide public notice of its preliminary decisions under
par. (c) no later than the 60th day after preparing the report under
par. (a) and shall provide the opportunity for public comment on the decisions for at least 30 days following the public notice.
283.16(3)(e)
(e) The department of administration shall consider any public comments in making its final decisions under
par. (c) and shall make the final decisions no later than the 30th day after the end of the public comment period.
283.16(3)(f)
(f) The department of administration shall send a notice that describes its final decisions under
par. (c) to the legislative reference bureau for publication in the administrative register.
283.16(3)(g)
(g) If the department of administration decides under
par. (c) that the determination described in that paragraph remains accurate, the department of natural resources shall seek aproval from the federal environmental protection agency under
40 CFR 131.21 for renewal of the variance under this section.
283.16(4)(a)(a) When a determination under
sub. (2) (a) that attaining the water quality standard for phosphorus through compliance with water quality based effluent limitations by point sources that cannot achieve compliance without major facility upgrades is not feasible and approval of the variance under this section by the federal environmental protection agency are in effect, a permittee is eligible for a variance to the water quality standard for phosphorus for an existing source if all of the following apply:
283.16(4)(a)2.
2. Subject to
par. (am) 1., the permittee certifies that the existing source cannot achieve compliance with the water quality based effluent limitation for phosphorus without a major facility upgrade.
283.16(4)(a)3.
3. The permittee agrees to comply with the requirements under
sub. (6).
283.16(4)(am)1.1. The department shall approve an application for a variance if the requirements in
pars. (a) and
(b) are complied with, unless the department determines that the certification under
par. (a) 2. is substantially inaccurate.
283.16(4)(am)2.
2. The department shall act on an application for a variance under this section no later than the 30th day after the day on which the department receives the application for the variance.
283.16(4)(am)3.
3. If the department does not act on the application for a variance by the deadline under
subd. 2., the application is approved.
283.16(4)(b)
(b) A permittee may apply for the variance under this section in any of the following ways:
283.16(4)(b)1.
1. By requesting the variance in the application for reissuance of the permit.
283.16(4)(b)2.
2. By requesting the variance within 60 days after the department reissues or modifies the permit to include a water quality based effluent limitation for phosphorus.
283.16(4)(b)3.
3. If the department issued a permit to the permittee before April 25, 2014, that includes a water quality based effluent limitation for phosphorus, by requesting a modification of the permit.
283.16(4)(b)4.
4. If the department issued a permit to the permittee before April 25, 2014, that includes a water quality based effluent limitation for phosphorus and that requires the permittee to submit to the department options for complying with the water quality based effluent limitation, by submitting a request for the variance as a compliance option.
283.16(4)(c)
(c) After an application for a variance is submitted to the department under
par. (b) 2.,
3., or
4., and until the last day for seeking review of the department's final decision on the application or a later date fixed by order of the reviewing court, the water quality based effluent limitation for phosphorus and any corresponding compliance schedule are not effective. All other provisions of the permit continue in effect except those for which a petition for review has been submitted under
s. 283.63.
283.16(4)(d)
(d) The variance under this section remains in effect for a point source until the permit is reissued, modified, or revoked and reissued.
283.16(4)(e)
(e) Notwithstanding
s. 227.42, there is no right to a hearing under this subsection.
283.16(4)(f)
(f) If the department approves a variance under this section and the department issues a modified water quality based effluent limitation under
s. 283.63 for phosphorus, the permittee shall comply with the least stringent of the 2 effluent limitations.
283.16(6)(a)(a) Except as provided in
par. (ae) or
(am) or
sub. (7), in the permit for a point source for which the department approves the variance under this section the department may include a requirement that the permittee optimize the performance of the point source in controlling phosphorus discharges and shall include the following interim limits:
283.16(6)(a)1.
1. In the first permit for which the department approves the variance, a requirement to achieve, by the end of the term of that permit, compliance with an effluent limitation for phosphorus equal to 0.8 milligrams per liter as a monthly average.
283.16(6)(a)2.
2. In the 2nd permit for which the department approves the variance, a requirement to achieve, by the end of the term of that permit, compliance with an effluent limitation for phosphorus equal to 0.6 milligrams per liter as a monthly average.
283.16(6)(a)3.
3. In the 3rd permit for which the department includes the variance, a requirement to achieve, by the end of the term of that permit, compliance with an effluent limitation for phosphorus equal to 0.5 milligrams per liter as a monthly average.
283.16(6)(a)4.
4. In the 4th permit for which the department includes the variance, a requirement to achieve, by the end of the term of that permit, compliance with the water quality based effluent limitation for phosphorus.
283.16(6)(ae)
(ae) If a permittee who chose an option for complying with a water quality based effluent limitation for phosphorus other than the variance under this section applies for the variance under this section, the department shall count a permit that included the other compliance option as though the permit had included the variance, for the purposes of
par. (a), including determining the applicable interim limit.
283.16(6)(am)
(am) If a permittee certifies that the point source cannot achieve compliance with an interim limit in
par. (a) 1.,
2., or
3. without a major facility upgrade, the department shall include in the permit a requirement to achieve compliance with the most stringent achievable interim limit, except that the department may not include an interim limit that is higher than the limit established under
s. 283.11 (3) (am).
283.16(6)(b)
(b) In the permit for a point source for which the department approves the variance under this section, in addition to the requirements under
par. (a) or
(am) or
sub. (7), the department shall require the permittee to implement the permittee's choice of the following measures to reduce the amount of phosphorus entering the waters of the state:
283.16(6)(b)2.
2. Entering into a binding, written agreement with the department under which the permittee constructs a project or implements a plan that is designed to result in an annual reduction of phosphorus pollution from other sources in the basin in which the point source is located, in an amount equal to the difference between the annual amount of phosphorus discharged by the point source and the target value.
283.16(6)(b)3.
3. Entering into a binding written agreement, that is approved by the department, with another person under which the person constructs a project or implements a plan that is designed to result in an annual reduction of phosphorus pollution from other sources in the basin in which the point source is located, in an amount equal to the difference between the annual amount of phosphorus discharged by the point source and the target value.
283.16(7)
(7) More stringent effluent limitations. If the department determines under
sub. (3) (cm) that it is appropriate to apply more stringent effluent limitations than those in
sub. (6) (a) to all point sources or to a category of point sources, the department shall include the more stringent effluent limitations specified under
sub. (3) (cm) in permits reissued, modified, or revoked and reissued after that determination for all point sources or for the category of point sources to which the more stringent effluent limitations apply.
283.16(8)(a)1.1. A permittee that chooses to make payments for phosphorus reduction under
sub. (6) (b) 1. shall make the payments to each county that is participating in the program under this subsection and that has territory within the basin in which the point source is located in proportion to the amount of territory each county has within the basin. The permittee shall make a total payment by March 1 of each calendar year in the amount equal to the per pound amount under
subd. 2. times the number of pounds by which the amount of phosphorus discharged by the point source during the previous year exceeded the point source's target value or $640,000, whichever is less. If no county that has territory within the basin is participating in the program under this subsection, the department shall direct the permittee to make payments to participating counties selected by the department.
283.16(8)(a)2.
2. The per pound payment for this subsection is $50 beginning on April 25, 2014. Beginning in 2015, the department shall adjust the per pound payment each year by a percentage equal to the average annual percentage change in the U.S. consumer price index for all urban consumers, U.S. city average, as determined by the federal department of labor, for the 12 months ending on the preceding December 31. The adjusted amount takes effect for permits reissued on April 1. The per pound payment in effect when a permit is reissued applies for the term of the permit.
283.16(8)(b)1.1. A county shall use payments received under this subsection to provide cost sharing under
s. 281.16 (3) (e) or
(4) for projects to reduce the amount of phosphorus entering the waters of the state, for staff to implement projects to reduce the amount of phosphorus entering the waters of the state from nonpoint sources, or for modeling or monitoring to evaluate the amount of phosphorus in the waters of the state for planning purposes.
283.16(8)(b)2.
2. A county shall use at least 65 percent of the amounts received under this subsection to provide cost sharing under
s. 281.16 (3) (e) or
(4).
283.16(8)(b)2m.
2m. No later than March 1 of each year, a county shall develop a plan for using the payments received under this subsection in the previous year that is consistent with the county's land and water resource management plan under
s. 92.10. A county shall do all of the following in the plan under this subdivision:
283.16(8)(b)2m.a.
a. Identify projects that have, or watersheds in which there exists, the greatest potential to reduce the amount of phosphorus per acre entering the waters of the state, based on an assessment of the land and land use practices in the county.
283.16(8)(b)2m.b.
b. Describe the measures it will take to ensure that each project that it funds is completed and evaluated.
283.16(8)(b)3.
3. No later than May 1 of the 2nd year following a year in which a county receives payments under this subsection, the county shall submit an annual report to the department of natural resources, the department of administration, the department of agriculture, trade and consumer protection, and each permittee from which it received those payments. In the annual report, the county shall describe the projects for which it provided cost sharing, quantify, in pounds, the associated phosphorus reductions achieved using accepted modeling technology, and identify any staff funded with the payments.
283.16(8)(b)4.
4. The department shall evaluate reports submitted under
subd. 3. If the department determines that a county is not using the payments to effectively reduce the amount of phosphorus entering the waters of the state from nonpoint sources, the department may require permittees who made the payments to eliminate or reduce future payments to the county.
283.16(8)(b)5.
5. A county shall notify the department by January 1 of each year if it chooses not to participate in the program under this subsection.
283.16(8m)(a)(a) A person who constructs a project or implements a plan under an agreement under
sub. (6) (b) 2. or
3. that involves activities for which performance standards and prohibitions have been prescribed under
s. 281.16 (2) or
(3) shall comply with those performance standards and prohibitions and any associated technical standards.
283.16(8m)(b)
(b) A person who constructs a project or implements a plan under an agreement under
sub. (6) (b) 2. or
3. shall annually submit a report to the department that quantifies, in pounds, the phosphorus reductions achieved through the project or plan, using accepted modeling technology. The department shall review reports submitted under this paragraph. If the department determines, based on the results of the modeling, that a project or plan is not effectively reducing the amount of phosphorus entering the waters of the state, the department shall terminate or modify the agreement.
283.16 History
History: 2013 a. 378.
283.17
283.17
Thermal effluent limitations. 283.17(1)
(1) Any thermal effluent limitation proposed by the department may be modified by it in accordance with
s. 283.63, if the owner or operator of the point source which is the subject of the proposed limitation demonstrates to the satisfaction of the department that the proposed limitation is more stringent than necessary to assure the protection and propagation of a balanced indigenous population of shellfish, fish and wildlife in and on the body of water into which the discharge is made.
283.17(2)
(2) Any point source of a discharge having a thermal component, the modification of which is commenced after October 18, 1972, and which, as modified, meets the most stringent effluent limitation established under
s. 283.13 or
sub. (1) and this subsection, where the limitation assures protection and propagation of a balanced indigenous population of shellfish, fish and wildlife in and on the water into which the discharge is made, shall not be subject to any more stringent effluent limitation with respect to the thermal component during either the 10-year period beginning on the date of completion of the modification or the period of depreciation or amortization of the facility for the purpose of section
167 or
169 of the internal revenue code, whichever ends first.
283.17 History
History: 1987 a. 27 ss.
1846mg,
1846ms; Stats. 1987 s. 147.055;
1991 a. 39;
1995 a. 227 s.
862; Stats. 1995 s. 283.17.
283.19
283.19
Standards of performance. 283.19(1)
(1) The department shall, by rule, promulgate standards of performance, for each class or category of sources referred to under
s. 283.13 (1) that is required to be covered by permits issued under
s. 283.31, which shall reflect the greatest degree of effluent reduction achievable through the application of the best available demonstrated control technology, processes, operating methods, or other alternatives. Where practicable, a standard of performance permitting no discharge of pollutants shall be adopted.
283.19(2)(a)(a) Standards of performance adopted under this section shall apply to all new sources within each class or category of sources for which a standard of performance has been adopted under this section.
283.19(2)(b)
(b) The term "new source" means any source, the construction of which commenced after the adoption of the standard of performance applicable to the category of sources of which it is a member.
283.19(3)
(3) The department shall revise such standards to reflect changes in control technology, processes, operating methods or other alternatives. When establishing or revising standards of performance under this section, the department shall consider the cost of achieving such effluent reductions and the nonwater quality environmental impact and energy requirements of such reductions.
283.19(4)
(4) The department may distinguish among classes, types and sizes within categories of sources for the purpose of establishing or revising standards of performance under this section.
283.19(5)
(5) After the effective date of any standard of performance promulgated by the department under this section, no owner or operator of any new source may operate such source in violation of any standard of performance applicable to such a source.
283.19 History
History: 1973 c. 74;
1993 a. 16.;
1995 a. 227 s.
863; Stats. 1995 s. 283.19
283.19 Cross-reference
Cross-reference: See also NR 200-, Wis. adm. code.
283.21
283.21
Toxic and pretreatment effluent standards. 283.21(1)(1)
Toxic effluent limitations and standards. 283.21(1)(a)(a)
List. The department shall promulgate by rule a list of toxic pollutants or combinations of pollutants subject to this chapter which consists of those toxic pollutants referred to in table 1 of committee print number 95-30 of the committee on public works and transportation of the U.S. house of representatives. After promulgation of this list, the department may revise by rule the list periodically and may add to or remove from the list any pollutant. In revising this list the department shall consider the toxicity of the pollutant, its persistence, degradability, the usual or potential presence in any waters of any organisms affected by the discharge of the toxic pollutant or combination of pollutants, the importance of the affected organism and the nature and extent of the effect of the toxic pollutant on these organisms. A determination by the department under this subsection is subject to declaratory judgment proceedings under
s. 227.40.