AB649-ASA1, s. 269 12Section 269. 196.493 (2) (b) 1. of the statutes is renumbered 196.493 (2) (am)
132. a. and amended to read:
AB649-ASA1,106,1514 196.493 (2) (am) 2. a. The existence of a reliable and adequate nuclear fuel
15supply;.
AB649-ASA1, s. 270 16Section 270. 196.493 (2) (b) 2. of the statutes is renumbered 196.493 (2) (am)
172. b. and amended to read:
AB649-ASA1,106,1918 196.493 (2) (am) 2. b. The costs for construction, operation, and
19decommissioning of nuclear power plants and for nuclear waste disposal ; and.
AB649-ASA1, s. 271 20Section 271. 196.493 (2) (b) 3. of the statutes is renumbered 196.493 (2) (am)
212. d.
AB649-ASA1, s. 272 22Section 272. 196.493 (2) (c) of the statutes is created to read:
AB649-ASA1,107,223 196.493 (2) (c) For certifications made on or after the date specified in the notice
24published under sub. (3) (b), the commission shall make the finding under par. (am)

12. based on economic advantages to ratepayers or members of electric cooperatives
2in this state.
AB649-ASA1, s. 273 3Section 273. 196.493 (3) of the statutes is created to read:
AB649-ASA1,107,54 196.493 (3) Register publication. (a) The commission shall determine all of
5the following:
AB649-ASA1,107,96 1. The effective dates of all rules promulgated by the commission, and all orders
7issued by the commission, that are necessary to initially implement the changes to
8s. 196.378 by 2009 Wisconsin Act .... (this act), and other related statutory changes
9made by that act.
AB649-ASA1,107,1310 2. The effective dates of all rules promulgated by the commission, and all orders
11issued by the commission, that are necessary to initially implement the changes to
12s. 196.374 by 2009 Wisconsin Act .... (this act), and other related statutory changes
13made by that act.
AB649-ASA1,107,1614 (b) The commission shall publish a notice in the Wisconsin Administrative
15Register specifying the first date on which all of the rules and orders described in par.
16(a) are in effect.
AB649-ASA1, s. 274 17Section 274. 196.493 (4) of the statutes is created to read:
AB649-ASA1,107,2518 196.493 (4) Decommissioning. The commission may by order specify the
19method for an owner or operator of a nuclear power plant to provide reasonable
20assurance that funds in an amount determined by the commission will be available
21to decommission the plant and to dispose of spent nuclear fuel from the plant, and
22require the owner or operator to provide such assurance. This subsection applies to
23a nuclear power plant for which the commission issues a certificate of public
24convenience and necessity under s. 196.491 (3) on or after the date specified in the
25notice published under sub. (3) (b).
AB649-ASA1, s. 275
1Section 275. 196.494 (1) (a) of the statutes is amended to read:
AB649-ASA1,108,42 196.494 (1) (a) "Electric utility" means a public utility, other than a municipal
3utility, as defined in s. 196.377 (2) (a) 3., that provides retail electric service to
4customers in this state.
AB649-ASA1, s. 276 5Section 276. 196.494 (1) (am) of the statutes is created to read:
AB649-ASA1,108,76 196.494 (1) (am) "Municipal utility" means a public utility that is a
7municipality or that is wholly owned or operated by a city, village, or town.
AB649-ASA1, s. 277 8Section 277. 196.52 (9) (g) of the statutes is amended to read:
AB649-ASA1,108,149 196.52 (9) (g) Nothing in this subsection prohibits a cooperative association
10organized under ch. 185, a municipal utility, as defined in s. 196.377 (2) (a) 3. 196.494
11(1) (am)
, or a municipal electric company, as defined in s. 66.0825 (3) (d), from
12acquiring an interest in an electric generating facility that is constructed pursuant
13to a leased generation contract or from acquiring an interest in land on which such
14an electric generating facility is located.
AB649-ASA1, s. 278 15Section 278. 196.65 (1) of the statutes is renumbered 196.65 (1r).
AB649-ASA1, s. 279 16Section 279. 196.65 (1g) of the statutes is created to read:
AB649-ASA1,108,1717 196.65 (1g) In this section, "public utility" includes all of the following:
AB649-ASA1,108,2118 (a) The owner or operator of a nuclear power plant, as defined in s. 196.491 (1)
19(j), for which the commission has issued a certificate of public convenience and
20necessity under s. 196.491 (3) on or after the date specified in the notice published
21under s. 196.493 (3) (b).
AB649-ASA1,108,2222 (b) A prime supplier, as defined in s. 196.374 (1) (ig).
AB649-ASA1, s. 280 23Section 280. 196.65 (2) of the statutes is amended to read:
AB649-ASA1,109,224 196.65 (2) A penalty of not less than $500 nor more than $5,000 shall be
25recovered from the public utility for each offense under sub. (1) (1r) if the officer,

1agent or employee of the public utility acted in obedience to the direction, instruction
2or request of the public utility or any general officer of the public utility.
AB649-ASA1, s. 281 3Section 281. 196.66 (1) of the statutes is renumbered 196.66 (1r).
AB649-ASA1, s. 282 4Section 282. 196.66 (1g) of the statutes is created to read:
AB649-ASA1,109,65 196.66 (1g) Definition. In this section, "public utility" includes all of the
6following:
AB649-ASA1,109,107 (a) The owner or operator of a nuclear power plant, as defined in s. 196.491 (1)
8(j), for which the commission has issued a certificate of public convenience and
9necessity under s. 196.491 (3) on or after the date specified in the notice published
10under s. 196.493 (3) (b).
AB649-ASA1,109,1111 (b) A prime supplier, as defined in s. 196.374 (1) (ig).
AB649-ASA1, s. 283 12Section 283. 196.66 (2) of the statutes is amended to read:
AB649-ASA1,109,1813 196.66 (2) Each day separate offense. Every day during which any public
14utility or any officer, agent, as defined in sub. (3) (a), or employee of a public utility
15fails to comply with any order or direction of the commission or to perform any duty
16enjoined by this chapter or ch. 197 shall constitute a separate and distinct violation
17under sub. (1) (1r). If the order is suspended, stayed or enjoined, this penalty shall
18not accrue.
AB649-ASA1, s. 284 19Section 284. 196.66 (4) (b) of the statutes is amended to read:
AB649-ASA1,109,2320 196.66 (4) (b) If a public utility fails to comply with any rule, order or direction
21of the commission after actual receipt by the public utility of written notice from the
22commission specifying the failure, the maximum forfeiture under sub. (1) (1r) shall
23be $15,000.
AB649-ASA1, s. 285 24Section 285. 196.795 (6m) (a) 4m. of the statutes is created to read:
AB649-ASA1,110,5
1196.795 (6m) (a) 4m. "Nonutility nuclear power plant" means a nonutility
2nuclear power plant, as defined in s. 196.491 (1) (i), that is located in the reliability
3council area and that is owned, operated, or controlled by an affiliated interest of a
4public utility. This subdivision takes effect on the date specified in the notice
5published under s. 196.493 (3) (b).
AB649-ASA1, s. 286 6Section 286. 196.795 (6m) (cm) of the statutes is created to read:
AB649-ASA1,110,127 196.795 (6m) (cm) Nonutility nuclear power plants. The assets of a nonutility
8nuclear power plant shall not be included in the sum of the assets of a public utility
9affiliate under par. (b) 1. a., b., or c. and shall not be included in a nonutility affiliate's
10total assets under par. (b) 2. a. if the requirements specified in s. 196.491 (3m) (a) 1.
11and 2. are satisfied. This paragraph takes effect on the date specified in the notice
12published under s. 196.493 (3) (b).
AB649-ASA1, s. 287 13Section 287. 196.795 (11) (b) of the statutes is amended to read:
AB649-ASA1,110,2414 196.795 (11) (b) This section shall be deemed to legalize and confirm the
15formation, prior to November 28, 1985, of any holding company, which is not itself
16a public utility, and shall be deemed to legalize and confirm the operations and
17issuances of securities of the holding company, except that nothing in this section
18shall be deemed to prevent the commission from imposing reasonable terms,
19limitations or conditions on any holding company which are consistent with the
20requirements of sub. (6m) (c) or to (d) or which are consistent with and necessary to
21satisfy the requirements of sub. (5) (b) to (o) and (q) to (s) or which relate to future
22investments by the holding company unless the holding company owns, operates,
23manages or controls a telecommunications utility and does not also own, operate,
24manage or control a public utility which is not a telecommunications utility.
AB649-ASA1, s. 288 25Section 288. 196.80 (1r) of the statutes is created to read:
AB649-ASA1,111,4
1196.80 (1r) (a) In this subsection, "nuclear power plant" means a nuclear power
2plant, as defined in s. 196.491 (1) (j), for which the commission has issued a certificate
3of public convenience and necessity under s. 196.491 (3) on or after the date specified
4in the notice published under s. 196.493 (3) (b).
AB649-ASA1,111,85 (b) With the consent and approval of the commission but not otherwise an
6owner or operator of a nuclear power plant may sell, acquire, lease, or rent any
7nuclear power plant or property constituting an operating unit or system of a nuclear
8power plant.
AB649-ASA1, s. 289 9Section 289. 196.85 (1m) (a) of the statutes is amended to read:
AB649-ASA1,111,1710 196.85 (1m) (a) For the purpose of direct assessment under sub. (1) of expenses
11incurred by the commission in connection with its activities under s. 196.491, the
12term "public utility" includes electric utilities, as defined in s. 196.491 (1) (d).
13Subsection (1) (b) does not apply to assessments for the commission's activities under
14s. 196.491 related to the construction of wholesale merchant plants , as defined in s.
15196.491 (1) (w) or, beginning on the date specified in the notice published under s.
16196.493 (3) (b), related to the construction of nonutility nuclear power plants, as
17defined in s. 196.491 (1) (i)
.
AB649-ASA1, s. 290 18Section 290. 196.85 (1m) (e) of the statutes is created to read:
AB649-ASA1,111,2219 196.85 (1m) (e) For the purpose of direct assessment under sub. (1) of expenses
20incurred by the commission in connection with its activities under s. 196.374, the
21term "public utility" includes retail electric cooperatives, as defined in s. 196.374 (1)
22(L), and prime suppliers, as defined in s. 196.374 (1) (ig).
AB649-ASA1, s. 291 23Section 291. 285.60 (11) of the statutes is created to read:
AB649-ASA1,112,324 285.60 (11) Reducing greenhouse gas emissions. As part of its continual
25assessment under sub. (10) in 2010 and 2011, the department shall develop and

1implement measures to lessen permit obligations under this section and ss. 281.61
2to 281.65 for the construction, reconstruction, replacement, or modification of a
3stationary source if all of the following apply:
AB649-ASA1,112,54 (a) The owner or operator of the stationary source is not required to obtain a
5major source construction permit for the proposed project.
AB649-ASA1,112,76 (b) The construction, reconstruction, replacement, or modification would
7significantly reduce emissions of greenhouse gasses, as defined in s. 299.03 (1) (d).
AB649-ASA1,112,98 (c) The proposed project satisfies other requirements specified by the
9department by rule.
AB649-ASA1, s. 292 10Section 292. 292.75 (5) of the statutes is renumbered 292.75 (5) (a).
AB649-ASA1, s. 293 11Section 293. 292.75 (5) (a) 2m. of the statutes is created to read:
AB649-ASA1,112,1212 292.75 (5) (a) 2m. Whether the project is a qualifying project under sub. (5m).
AB649-ASA1, s. 294 13Section 294. 292.75 (5) (b) of the statutes is created to read:
AB649-ASA1,112,1614 292.75 (5) (b) The department may give greater weight to the criterion under
15par. (a) 2m. than to the other criteria under par. (a) in determining whether to award
16a grant.
AB649-ASA1, s. 295 17Section 295. 292.75 (5m) of the statutes is created to read:
AB649-ASA1,112,2118 292.75 (5m) Qualifying projects. A proposed project is a qualifying project for
19the purposes of subs. (5) (a) 2m. and (7) (b) if the project will result in a reduction of
20travel, energy use, or emissions of greenhouse gases, as defined in s. 299.03 (1) (d),
21or if one of the following applies:
AB649-ASA1,112,2522 (a) The eligible site or facility is located in an area that is designated for
23traditional neighborhood development, as defined in s. 66.1027 (1) (c), in a
24comprehensive plan adopted under s. 66.1001 and at least one of the following
25applies:
AB649-ASA1,112,26
11. The area is surrounded by or is adjacent to existing development.
AB649-ASA1,113,42 2. The area is within a sewer service territory in the sewer service area
3provisions of an areawide water quality management plan under s. 283.83 approved
4by the department.
AB649-ASA1,113,55 3. The area consists primarily of blighted properties.
AB649-ASA1,113,76 4. The area meets other criteria, specified by the department by rule, designed
7to ensure that the project reduces greenhouse gas emissions.
AB649-ASA1,113,108 (b) The city, village, town, or county in which the eligible site or facility is
9located has adopted the design standards under s. 101.027 (4) and the eligible site
10or facility is in an area that is subject to the design standards.
AB649-ASA1,113,1111 (c) All of the following apply:
AB649-ASA1,113,1612 1. The eligible site or facility is located in an area that is subject to either a
13charter under s. 299.83 (7e) issued to an association of entities that includes the city,
14village, town, or county in which the area is located or a participation contract under
15s. 299.83 (6) entered into by the city, village, town, or county in which the area is
16located.
AB649-ASA1,113,2217 2. The department determines, in consultation with the department of
18commerce, the department of administration, the public service commission, and the
19office of energy independence, that implementation of the charter or the
20participation contract is likely to result in significant reductions in emissions of
21greenhouse gases, as defined in s. 299.03 (1) (d), or in energy use by public or private
22entities within the city, village, town, or county.
AB649-ASA1,114,523 (d) The eligible site or facility is located in a city, village, town, or county that
24participates in tier I under s. 299.83 (3), the area in which the eligible site or facility
25is located is affected by the participation in tier I, and the department of natural

1resources determines, in consultation with the department of commerce, the
2department of administration, the public service commission, and the office of energy
3independence, that the participation in tier I is likely to result in significant
4reductions in emissions of greenhouse gases, as defined in s. 299.03 (1) (d), or in
5energy use by public or private entities within the city, village, town, or county.
AB649-ASA1, s. 296 6Section 296. 292.75 (7) of the statutes is renumbered 292.75 (7) (a) and
7amended to read:
AB649-ASA1,114,118 292.75 (7) (a) The Except as provided under par. (b), the department may not
9distribute a grant unless the applicant contributes matching funds equal to 20% 20
10percent
of the grant. Matching funds may be in the form of cash or in-kind
11contribution or both.
AB649-ASA1, s. 297 12Section 297. 292.75 (7) (b) of the statutes is created to read:
AB649-ASA1,114,1513 292.75 (7) (b) The department may promulgate a rule that specifies a minimum
14contribution of matching funds by an applicant that is less than 20 percent of a grant
15for a project if the project is a qualifying project under sub. (5m).
AB649-ASA1, s. 298 16Section 298. 299.03 of the statutes is created to read:
AB649-ASA1,114,17 17299.03 Greenhouse gas emission goals. (1) Definitions. In this section:
AB649-ASA1,114,2318 (a) "Annual net greenhouse gas emissions" means the amount of greenhouse
19gasses, measured as tons of carbon dioxide equivalent, emitted to the atmosphere by
20all sources and activities in this state in a year minus the amount of greenhouse
21gasses, measured as tons of carbon dioxide equivalent, removed from the atmosphere
22by all sources and activities , including by carbon sequestration, in this state in the
23year.
AB649-ASA1,115,224 (b) "Carbon dioxide equivalent" means the amount of carbon dioxide that has
25the equivalent radiative effect as a specified amount of a greenhouse gas, calculated

1by multiplying the specified amount of the greenhouse gas by its global warming
2potential.
AB649-ASA1,115,43 (bm) "Carbon sequestration" means the long-term storage of carbon in water
4bodies, soil, vegetation, or geologic formations.
AB649-ASA1,115,65 (c) "Global warming potential" means the relative radiative effect of a
6greenhouse gas compared to the radiative effect of carbon dioxide.
AB649-ASA1,115,97 (d) "Greenhouse gas" means carbon dioxide, methane, nitrous oxide, sulphur
8hexafluoride, nitrogen trifluoride, a hydrofluorocarbon, a perfluorocarbon, or any
9other gas identified by the department under sub. (4).
AB649-ASA1,115,1110 (dm) "Radiative effect" means the capability of a gas in the atmosphere to
11absorb infrared radiation that is emitted from the earth's surface.
AB649-ASA1,115,1312 (e) "Renewable energy generation" means the generation of energy using a
13renewable resource, as defined in s. 196.374 (1) (j).
AB649-ASA1,115,1414 (f) "Zero net energy building" means one of the following:
AB649-ASA1,115,1615 1. A building that annually, based on a 3-year average, uses no more energy
16than is provided by on-site renewable energy generation.
AB649-ASA1,115,2017 2. One of 2 or more buildings that have an integrated system of energy supply
18and use and that together annually, based on a 3-year average, use no more energy
19than is provided by renewable energy generation that is part of the integrated
20system.
AB649-ASA1,115,23 21(2) Greenhouse gas emission reduction goals. (a) It is the goal of this state
22that annual net greenhouse gas emissions in 2014 are no greater than annual net
23greenhouse gas emissions in 2005.
AB649-ASA1,115,2524 (b) It is the goal of this state that annual net greenhouse gas emissions in 2022
25are at least 22 percent less than annual net greenhouse gas emissions in 2005.