AB774,28 7Section 28. 30.025 (5) (title) of the statutes is repealed and recreated to read:
AB774,15,88 30.025 (5) (title) Exceptions.
AB774,29 9Section 29. 30.025 (5) of the statutes is renumbered 30.025 (5) (a).
AB774,30 10Section 30. 30.025 (5) (d) of the statutes is created to read:
AB774,15,1311 30.025 (5) (d) This section does not apply to an applicant proposing to
12undertake a utility project if a certificate is not required for the utility project unless
13the applicant elects to proceed in the manner provided under this section.
AB774,31 14Section 31. 30.12 (1mn) of the statutes is created to read:
AB774,15,1515 30.12 (1mn) Electric utility facilities. (a) In this subsection:
AB774,15,1716 1. "Construction" means installation, repair, replacement, removal, or
17maintenance.
AB774,15,2018 2. "Structure" includes a pole, support anchor, culvert, clear-span bridge, or
19construction mat used to protect a wetland or land below the ordinary high-water
20mark.
AB774,15,2321 (b) An electric public utility or a wholesale electric cooperative, as defined in
22s. 16.957 (1) (v), is exempt from the permit requirements under this section for any
23of the following:
AB774,16,3
11. The temporary use or placement within an existing utility corridor of
2equipment, a structure, or a vehicle on the bed of a navigable water for a purpose
3associated with the construction of a facility used to transmit or distribute electricity.
AB774,16,74 2. The deposit of material on the bed of a navigable water if the material is
5associated with the response to or cleanup of a release of drilling fluid associated with
6directional boring, if the deposit does not affect more than one-tenth of one acre of
7lake bed.
AB774,32 8Section 32. 30.20 (1g) (d) of the statutes is created to read:
AB774,16,129 30.20 (1g) (d) The removal of material that is associated with the response to
10or cleanup of a release of drilling fluid associated with directional boring is exempt
11from the permit and contracts requirements under this section, if the removal does
12not affect more than one-tenth of one acre of lake bed.
AB774,33 13Section 33. 59.692 (1n) of the statutes is created to read:
AB774,16,1614 59.692 (1n) (a) In this subsection, "electric cooperative" means a cooperative
15association that is organized under ch. 185 for the purpose of providing electricity at
16wholesale or retail to its members only.
AB774,16,2217 (b) This section and ordinances enacted under this section do not apply to a
18project for the construction or maintenance of electric, gas, telephone, water, or
19sewage collection, transmission, or distribution facilities conducted by a public
20utility, or to a project for the construction or maintenance of electric transmission or
21distribution facilities conducted by an electric cooperative, in a shoreland if one of the
22following applies:
AB774,16,2323 1. The department has issued all permits required for the project.
AB774,16,2524 2. No permits are required for the project and the person conducting the project
25employs best management practices related to storm water management.
AB774,34
1Section 34. 196.491 (3) (a) 3. a. of the statutes, as affected by 2013 Wisconsin
2Act 10
, is amended to read:
AB774,17,143 196.491 (3) (a) 3. a. At least 60 days before a person files an application under
4subd. 1., the person shall provide the department with an engineering plan if the
5facility is a large electric generating facility. The engineering plan shall show the
6location of the facility, a description of the facility, including the major components
7of the facility that have a significant air, water or solid waste pollution potential, and
8a brief description of the anticipated effects of the facility on air quality, water
9quality, wetlands, solid waste disposal capacity, and other natural resources. Within
1030 days after a person provides an engineering plan, the department shall provide
11the person with a listing of each department permit or approval, other than a permit
12as defined in s. 30.025 (1b) (b),
which, on the basis of the information contained in
13the engineering plan, appears to be required for the construction or operation of the
14facility.
AB774,35 15Section 35. 196.491 (3) (a) 3. b. of the statutes, as affected by 2013 Wisconsin
16Acts 1
and 10, is amended to read:
AB774,18,617 196.491 (3) (a) 3. b. Except as provided under subd. 3. c., within 20 days after
18the department provides a listing specified in subd. 3. a. to a person, the person shall
19apply for the permits and approvals identified in the listing. The department shall
20determine whether an application under this subd. 3. b. is complete and, no later
21than 30 days after the application is filed, notify the applicant about the
22determination. If the department determines that the application is incomplete, the
23notice shall state the reason for the determination. An applicant may supplement
24and refile an application that the department has determined to be incomplete.
25There is no limit on the number of times that an applicant may refile an application

1under this subd. 3. b. If the department fails to determine whether an application
2is complete within 30 days after the application is filed, the application shall be
3considered to be complete. Except as provided in s. 30.025 (4), the The department
4shall complete action on an application under this subd. 3. b. for any permit or
5approval that is required prior to construction of a facility within 120 days after the
6date on which the application is determined or considered to be complete.
AB774,36 7Section 36. 196.492 of the statutes is created to read:
AB774,18,9 8196.492 Siting of utility facilities. (1) In this section, "utility facility" has
9the meaning given in s. 30.025 (1b) (c).
AB774,18,12 10(2) Subject to sub. (3), the commission shall have exclusive jurisdiction over the
11approval of locations, sites, or routes for utility facilities that are subject to s. 196.49
12or 196.491 (3).
AB774,18,17 13(3) In an investigation or proceeding under s. 196.49 or 196.491 (3), the
14commission shall consider the information provided by the department of natural
15resources under s. 30.025 (2m) when determining the location, site, or route of a
16utility facility for which an application is submitted to the department of natural
17resources under s. 30.025.
AB774,37 18Section 37. Initial applicability.
AB774,18,2119 (1) This act first applies to utility projects for which an application under
20section 30.025 of the statutes, as affected by this act, is submitted to the department
21of natural resources on the effective date of this subsection.
AB774,18,2222 (End)