227,584
Section 584
. 144.441 (title) and (1) (intro.) of the statutes are repealed.
227,585
Section 585
. 144.441 (1) (a), (b) and (c) of the statutes are renumbered 289.01 (3), (4) and (24), and 289.01 (3) and (4), as renumbered, are amended to read:
289.01 (3) “Approved facility" means a solid or hazardous waste disposal facility with an approved plan of operation under s. 144.44 (3) 289.30 or a solid waste disposal facility initially licensed within 3 years prior to May 21, 1978, whose owner successfully applies, within 2 years after May 21, 1978, for a determination by the department that the facility's design and plan of operation comply substantially with the requirements necessary for plan approval under s. 144.44 (3) 289.30.
(4) “Approved mining facility" means an approved facility which is part of a mining site, as defined under s. 144.81 (8) 293.01 (12), used for the disposal of waste resulting from mining, as defined under s. 144.81 (5) 293.01 (9), or prospecting, as defined under s.
144.81 (12) 293.01 (18).
227,586
Section 586
. 144.441 (1m) (title) of the statutes is repealed.
227,587
Section
587. 144.441 (1m) of the statutes is renumbered 289.05 (3) and amended to read:
289.05 (3) The department shall prescribe by rule minimum standards for closing, long-term care and termination of solid waste disposal facilities or hazardous waste facilities. The standards and any additional facility-specific requirements designated by the department shall be incorporated into the plan of operation prepared under s. 144.44 (3) 289.30. The long-term care provisions in an approved plan of operation may be modified under s. 144.44 (3) (d) 1. c. or 2. 289.30 (8) (a) 3. or (b).
227,588
Section 588
. 144.441 (2) of the statutes is renumbered 289.41 (1m), and 289.41 (1m) (b) 1. to 3. and (c), as renumbered, are amended to read:
289.41 (1m) (b) 1. Except as provided in subd. 2., the owner of an approved facility shall maintain proof of financial responsibility as provided in s. 144.443
this section during the operation of the approved facility and for 40 years after the closing of the approved facility unless the obligation is extended under par. (f).
2. The owner of an approved facility which ceased to accept solid waste and permanently terminated disposal operations before August 15, 1991, shall maintain proof of financial responsibility as provided in s. 144.443 this section for the period specified in the approved plan of operation.
3. Except as provided in subd. 4., the owner of a nonapproved facility that receives or has received household waste shall maintain proof of financial responsibility as provided in s. 144.443 this section during the operation of the nonapproved facility and for 40 years after the closing of the nonapproved facility unless the obligation is extended under par. (f).
(c) Long-term care responsibility for approved facilities. Notwithstanding s. 144.441 (2) (c) 1., 1989 stats., the owner's responsibility for the long-term care of an approved facility does not terminate, except that if another person acquires the rights of ownership and is issued under s. 144.444 289.46 (1) a new operating license for the approved facility, the owner's responsibility is transferred to that other person upon the issuance of the new operating license.
227,589
Section 589
. 144.441 (3) and (4) of the statutes are renumbered 289.62 (1) and (2), and 289.62 (1) (f), as renumbered, is amended to read:
289.62 (1) (f) Reduction of or exemption from tonnage fees. The total annual tonnage fees for all solid waste received by a nonapproved facility shall be reduced by the amount of the base fee under s. 144.442 (2) 289.67 (3) for that facility. If the base fee for a nonapproved facility under s. 144.442 (2) 289.67 (3) is greater than the annual tonnage fee imposed under par. (a) for that facility, the solid or hazardous waste received by the facility is exempt from the tonnage fee for that year. The department shall establish methods by rule for estimating the total annual tonnages for all solid and hazardous wastes received by a nonapproved facility. If an estimate reveals that total annual tonnage fees for a nonapproved facility for a certain year are unlikely to exceed the base fee under s. 144.442 (2) 289.67 (3) for that year, the department shall grant an exemption under this paragraph without requiring the calculation of the actual total tonnage fees.
227,590
Section 590
. 144.441 (6) of the statutes is renumbered 289.68 and amended to read:
289.68 Payments from the waste management fund and related payments. (1)
Payments from the waste management fund. The department may expend moneys in the waste management fund only for the purposes specified under pars. (d) to (h) subs. (3) to (6) and 1991 Wisconsin Act 39, section 9142 (2w). The department may expend moneys appropriated under s. 20.370 (2) (dq) for the purposes specified under pars. (d) and (g) subs. (3) and (5) and 1991 Wisconsin Act 39, section 9142 (2w). The department may expend moneys appropriated under s. 20.370 (2) (dt) for the purposes specified under par. (f) sub. (4). The department may expend moneys appropriated under s. 20.370 (2) (dy) and (dz) for the purposes specified under par. (h) sub. (6).
(2) Payments from the investment and local impact fund. The department may expend moneys received from the investment and local impact fund only for the purposes specified under par. (d) sub. (3), only for approved mining facilities and only if moneys in the waste management fund are insufficient to make complete payments. The amount expended by the department under this paragraph subsection may not exceed the balance in the waste management fund at the beginning of that fiscal year or 50% of the balance in the investment and local impact fund at the beginning of that fiscal year, whichever amount is greater.
(3) Payments for long-term care after termination of proof of financial responsibility. The department may spend moneys appropriated under s. 20.370 (2) (dq) for the costs of long-term care of an approved facility for which the plan of operation was approved under s. 144.44 (3) (c) 289.30 (6) before August 9, 1989, that accrue after the requirement to provide proof of financial responsibility expires under sub. (2) s. 289.41 (1m) (b) or (f) as authorized under s. 144.443 289.41 (11) (b) 2.
(4) Payment of closure and long-term care costs; forfeited bonds and similar moneys. The department may utilize moneys appropriated under s. 20.370 (2) (dt) for the payment of costs associated with compliance with closure and long-term care requirements under s. 144.443 289.41 (11) (b) 1.
(5) Prevention of imminent hazard. The department may utilize moneys appropriated under s. 20.370 (2) (dq) for the payment of costs associated with imminent hazards as authorized under s. 144.443 289.41 (11) (c) and (cm).
(6) Payment of corrective action, forfeited bonds and recovered moneys. The department may utilize moneys appropriated under s. 20.370 (2) (dy) and (dz) for the payment of costs of corrective action under s. 144.443 289.41 (11) (bm).
227,591
Section 591
. 144.441 (6m) of the statutes is renumbered 289.68 (7).
227,592
Section 592
. 144.441 (7) of the statutes is renumbered 289.63, and 289.63 (1), (3) (intro.), (a), (b), (c) (intro.) and (d) and (4) to (9), as renumbered, are amended to read:
289.63 (1) Imposition of groundwater, solid waste capacity and well compensation fees on generators. Except as provided under par. (f) sub. (6), a generator of solid or hazardous waste shall pay separate groundwater, solid waste capacity and well compensation fees for each ton or equivalent volume of solid or hazardous waste which is disposed of at a licensed solid or hazardous waste disposal facility. If a person arranges for collection or disposal services on behalf of one or more generators, that person shall pay the groundwater, solid waste capacity and well compensation fees to the licensed solid or hazardous waste disposal facility or to any intermediate hauler used to transfer wastes from collection points to a licensed facility. An intermediate hauler who receives groundwater, solid waste capacity and well compensation fees under this paragraph subsection shall pay the fees to the licensed solid or hazardous waste disposal facility. Tonnage or equivalent volume shall be calculated in the same manner as the calculation made for tonnage fees under sub. (3) s. 289.62 (1).
(3) Amount of groundwater, solid waste capacity and well compensation fees. (intro.) The fees imposed under this subsection section are as follows:
(a) Except as provided in par. (d) sub. (4), the groundwater fee imposed under par. (a) sub. (1) is 10 cents per ton for solid waste or hazardous waste.
(b) The well compensation fee imposed under par. (a) sub. (1) for solid waste or hazardous waste, excluding prospecting or mining waste, is one cent per ton.
(c) (intro.) In this subdivision paragraph, “solid waste disposal and incineration capacity" means the sum of the total capacity remaining at the beginning of a calendar year in all existing municipal waste landfills and the total solid waste incineration capacity of all existing incinerators during the expected life of the incinerators. The solid waste capacity fee imposed under par. (a)
sub. (1) for solid waste disposed of after January 1, 1995, excluding hazardous waste and excluding solid waste generated in this state, shall be determined by the department at the beginning of each calendar year based on a comparison of the solid waste disposal and incineration capacity in this state and in the state in which the solid waste is generated. Except as provided in subd. 4. par. (d), the solid waste capacity fee is as follows:
(d) If the solid waste capacity fee for solid waste generated in any state remains at the same level or increases in 2 consecutive calendar years, the fee under subd. 3. par. (c) is doubled. The fee shall remain doubled until solid waste generated in that state qualifies for a lower fee under subd. 3. par. (c).
(4) Amount of groundwater fee; prospecting or mining waste. The groundwater fee imposed under
par. (a) sub. (1) is one cent per ton for prospecting or mining waste, including tailing solids, sludge or waste rock.
(5) In addition to other fees. The groundwater, solid waste capacity and well compensation fees collected and paid under par. (b) sub. (2) are in addition to the tonnage fee imposed under sub. (3) s. 289.62 (1), the environmental repair base fee imposed under s. 144.442 (2) 289.67 (3) and the environmental repair surcharge imposed under s. 144.442 (3) 289.67 (4).
(6) Exemption from groundwater, solid waste capacity and well compensation fees; certain materials used in operation of the facility. Solid waste materials approved by the department for lining, daily cover or capping or for constructing berms, dikes or roads within a solid waste disposal facility are not subject to the groundwater, solid waste capacity and well compensation fees imposed under par. (a) sub. (1), except that foundry sands or shredder fluff approved for use under s. 144.44 (3) (bh) or (4e) 289.30 (5) or 289.31 (9) are subject to groundwater and well compensation fees.
(7) Reporting period. The reporting period under this subsection section is the same as the reporting period under sub. (3) s. 289.62 (1). The owner or operator of any licensed solid or hazardous waste disposal facility shall pay groundwater, solid waste capacity and well compensation fees required to be collected under par. (b) sub. (2) at the same time as any tonnage fees under sub. (3) s. 289.62 (1) are paid.
(8) Use of groundwater, solid waste capacity and well compensation fees. The groundwater fees collected under par. (b) sub. (2) shall be credited to the environmental fund for groundwater management. The well compensation and solid waste capacity fees collected under par. (b) sub. (2) shall be credited to the environmental fund for environmental repair.
(9) Failure to pay groundwater, solid waste capacity and well compensation fees. (a) If a person required under par. (a) sub. (1) to pay groundwater, solid waste capacity and well compensation fees to a licensed solid or hazardous waste disposal facility fails to pay the fees, the owner or operator of the licensed solid or hazardous waste disposal facility shall submit to the department with the payment required under par. (b)
sub. (2) an affidavit stating facts sufficient to show the person's failure to comply with par. (a) sub. (1).
(b) If the person named in the affidavit under subd. 1. par. (a) is a generator or a person who arranges for collection or disposal services on behalf of one or more generators and the person holds a license for the collection and transportation of solid or hazardous waste, the department shall immediately notify the person that the license will be suspended 30 days after the date the notice is mailed unless the person submits to the department an affidavit stating facts sufficient to show that it has paid the fees as required under par. (a) sub. (1).
(c) If the person named in the affidavit under subd. 1. par. (a) is an intermediate hauler that holds a license for the collection and transportation of solid or hazardous waste, the department shall immediately notify the person that the license will be suspended 30 days after the date the notice is mailed unless the person submits to the department an affidavit stating facts sufficient to show that either of the following has occurred:
1. The person named in the affidavit under subd. 1. par. (a) received the required fees from a generator, from a person who arranges for collection or disposal services on behalf of one or more generators or from an earlier intermediate hauler, and paid the fees to the licensed solid or hazardous waste disposal facility or to a subsequent intermediate hauler.
2. A generator, a person who arranges for collection or disposal services on behalf of one or more generators or an earlier intermediate hauler failed to pay the required fees to the person named in the affidavit under subd. 1. par. (a).
(d) If the department does not receive an affidavit under subd. 2. or 3. par. (b) or (c) within 30 days after the date the notice is mailed, the department shall suspend the license issued to the person for the collection and transportation of solid or hazardous waste. Notwithstanding s. 227.42, the department is not required to provide the licensee with a hearing before the suspension.
(e) When a person whose license is suspended under subd. 4. par. (d) provides the department with proof that the person has paid the owner or operator of the licensed solid or hazardous waste facility the amount of the unpaid fees, the department shall immediately reinstate the suspended license.
227,593
Section 593
. 144.441 (7m) of the statutes is renumbered 289.64, and 289.64 (1) and (3) to (7), as renumbered, are amended to read:
289.64 (1) Imposition of solid waste facility siting board fee on generators. Except as provided under par. (d) sub. (4), a generator of solid waste or hazardous waste shall pay a solid waste facility siting board fee for each ton or equivalent volume of solid waste or hazardous waste that is disposed of at a licensed solid waste or hazardous waste disposal facility. If a person arranges for collection or disposal services on behalf of one or more generators, that person shall pay the solid waste facility siting board fee to the licensed solid waste or hazardous waste disposal facility or to any intermediate hauler used to transfer wastes from collection points to a licensed facility. An intermediate hauler who receives the solid waste facility siting board fee under this paragraph
subsection shall pay the fee to the licensed solid waste or hazardous waste disposal facility. Tonnage or equivalent volume shall be calculated in the same manner as the calculation made for tonnage fees under sub. (3)
s. 289.62 (1).
(3) Amount of solid waste facility siting board fee. The fee imposed under this subsection section is 1.7 cents per ton for solid waste or hazardous waste.
(4) Exemption from solid waste facility siting board fee; certain materials used in operation of the facility. Solid waste materials approved by the department for lining, daily cover or capping or for constructing berms, dikes or roads within a solid waste disposal facility are not subject to the solid waste facility siting board fee imposed under par. (a) sub. (1), except that materials approved for use under s. 144.44 (3) (bh) or (4e)
289.30 (5) or 289.31 (9) are subject to the fee.
(5) Reporting period. The reporting period under this subsection section is the same as the reporting period under sub. (3) s. 289.62 (1). The owner or operator of any licensed solid waste or hazardous waste disposal facility shall pay the solid waste facility siting board fee required to be collected under par. (b) sub. (2) at the same time as any tonnage fees under sub. (3) s. 289.62 (1) are paid.
(6) Use of solid waste facility siting board fees. The fees collected under par. (b) sub. (2) shall be credited to the appropriation under s. 20.370 (2) (eg) for transfer to the appropriation under s. 20.505 (4) (k).
(7) Failure to pay solid waste facility siting board fee. (a) If a person required under par. (a) sub. (1) to pay the solid waste facility siting board fee to a licensed solid waste or hazardous waste disposal facility fails to pay the fee, the owner or operator of the licensed solid waste or hazardous waste disposal facility shall submit to the department with the payment required under par. (b) sub. (2) an affidavit stating facts sufficient to show the person's failure to comply with par. (a)
sub. (1).
(b) If the person named in the affidavit under subd. 1. par. (a) is a generator or a person who arranges for collection or disposal services on behalf of one or more generators and the person holds a license for the collection and transportation of solid waste or hazardous waste, the department shall immediately notify the person that the license will be suspended 30 days after the date the notice is mailed unless the person submits to the department an affidavit stating facts sufficient to show that it has paid the fee as required under par. (a) sub. (1).
(c) If the person named in the affidavit under subd. 1. par. (a) is an intermediate hauler that holds a license for the collection and transportation of solid waste or hazardous waste, the department shall immediately notify the person that the license will be suspended 30 days after the date the notice is mailed unless the person submits to the department an affidavit stating facts sufficient to show that either of the following has occurred:
1. The person named in the affidavit under subd. 1. par. (a) received the required fee from a generator, from a person who arranges for collection or disposal services on behalf of one or more generators or from an earlier intermediate hauler, and paid the fee to the licensed solid waste or hazardous waste disposal facility or to a subsequent intermediate hauler.
2. A generator, a person who arranges for collection or disposal services on behalf of one or more generators or an earlier intermediate hauler failed to pay the required fee to the person named in the affidavit under subd. 1. par. (a).
(d) If the department does not receive an affidavit under subd. 2. or 3. par. (b) or (c) within 30 days after the date the notice is mailed, the department shall suspend the license issued to the person for the collection and transportation of solid waste or hazardous waste. Notwithstanding s. 227.42, the department is not required to provide the licensee with a hearing before the suspension.
(e) When a person whose license is suspended under subd. 4. par. (d) provides the department with proof that the person has paid the owner or operator of the licensed solid waste or hazardous waste facility the amount of the unpaid fee, the department shall immediately reinstate the suspended license.
227,594
Section 594
. 144.4412 of the statutes is renumbered 289.65, and 289.65 (2) and (5) (c), as renumbered, are amended to read:
289.65 (2) Collection. The owner or operator of an incinerator with an operating permit or license that is approved under s. 144.391 285.60 or 144.44 (4) 289.31 shall pay to the department the amount of the solid waste capacity fee required to be collected according to the amount of solid waste burned during the previous calendar year.
(5) (c) Solid waste generated in another state if the solid waste is converted into fuel or burned at a municipal solid waste treatment facility with an operating permit or license that is approved under s. 144.391 285.60 or 144.44 (4) 289.31 prior to May 11,
1990, and the solid waste is delivered to the municipal solid waste treatment facility pursuant to a contract in effect 2 years after May 11, 1990.
227,595
Section 595
. 144.4414 of the statutes is renumbered 289.66 and amended to read:
289.66 Solid waste capacity fees; department determinations. Beginning on January 1, 1991, and annually thereafter, the department shall determine the solid waste disposal and incineration capacity, as defined in s. 144.4412 289.65 (1) (b), of this state and each adjacent state. The department shall inform the owner or operator of each solid waste disposal facility and each incinerator in this state of the amount of the solid waste capacity fee under ss. 144.441 (7) 289.63 and 144.4412 289.65 for solid waste generated in each adjacent state, commencing on January 1, 1995, based on that solid waste disposal and incineration capacity determination.
227,596
Section 596
. 144.442 (title) of the statutes is renumbered 292.31 (title).
227,597
Section 597
. 144.442 (1) (intro.) and (a) to (c) of the statutes are repealed.
227,598
Section 598
. 144.442 (1) (cm) of the statutes is repealed.
227,599
Section 599
. 144.442 (1) (d) of the statutes is renumbered 292.01 (18) and amended to read:
292.01 (18) “Site or facility" means, except in sub. (9m) ss. 292.35 and 292.61, an approved facility, an approved mining facility, a nonapproved facility or a waste site.
227,600
Section 600
. 144.442 (1) (e) of the statutes is renumbered 292.01 (21).
227,601
Section 601
. 144.442 (1m) of the statutes is renumbered 289.67 (1), and 289.67 (1) (a), (cp), (e), (f) and (g), as renumbered, are amended to read:
289.67 (1) (a) Imposition of fee. Except as provided under par. (f), a generator of solid or hazardous waste shall pay an environmental repair fee for each ton or equivalent volume of solid or hazardous waste which is disposed of at a licensed solid or hazardous waste disposal facility. If a person arranges for collection or disposal services on behalf of one or more generators, that person shall pay the environmental repair fee to the licensed solid or hazardous waste disposal facility or to any intermediate hauler used to transfer wastes from collection points to a licensed facility. An intermediate hauler who receives environmental repair fees under this paragraph shall pay the fees to the licensed solid or hazardous waste disposal facility. Tonnage or equivalent volume shall be calculated in the same manner as the calculation made for tonnage fees under s. 144.441 (3) 289.62 (1).
(cp) Amount of environmental repair fee. Notwithstanding par. (cm) and except as provided under par. (d), the environmental repair fee imposed under par. (a) is 30 cents per ton for solid or hazardous waste, other than high-volume industrial waste, as defined in s. 144.44 (7) (a) 1., disposed of on or after January 1, 1988, but before July 1, 1989, and 50 cents per ton disposed of on or after July 1, 1989.
(e) In addition to other fees. The environmental repair fee collected and paid under par. (b) is in addition to the base fee imposed under sub. (2), the surcharge imposed under sub. (3), the tonnage fee imposed under s. 144.441 (3) 289.62 (1) and the groundwater, solid waste capacity and well compensation fees imposed under s. 144.441 (7) 289.63.
(f) Exemption from environmental repair fee; certain materials used in operation of the facility. Solid waste materials approved by the department for lining, daily cover or capping or for constructing berms, dikes or roads within a solid waste disposal facility are not subject to the environmental repair fee imposed under par. (a), except that foundry sands or shredder fluff approved for use under s. 144.44 (3) (bh) or (4e) 289.30 (5) or 289.31 (9) are subject to the environmental repair fee.
(g) Reporting period. The reporting period under this subsection is the same as the reporting period under s. 144.441 (3) 289.62 (1). The owner or operator of any licensed solid or hazardous waste disposal facility shall pay environmental repair fees required to be collected under par. (b) at the same time as any tonnage fees under s. 144.441 (3) 289.62 (1).
227,602
Section 602
. 144.442 (1s) of the statutes is renumbered 289.67 (2), and 289.67 (2) (a), (c) 3. and (d), as renumbered, are amended to read:
289.67 (2) (a) A generator of hazardous waste who is required to report annually on hazardous waste activities according to rules promulgated under s. 144.62 (8) 291.05 (6) (b) shall pay an annual environmental repair fee.
(c) 3. Hazardous wastes which are removed from a site or facility to repair environmental pollution. In this subdivision, “site or facility" has the meaning given in s. 292.01 (18).
(d) The department shall assess fees under par. (a) on the basis of the generator's report that is submitted according to the rules promulgated under s. 144.62 (8) 291.05 (6) (b).
227,603
Section 603
. 144.442 (2) of the statutes is renumbered 289.67 (3), and 289.67 (3) (d), as renumbered, is amended to read:
289.67 (3) (d) Reduction of base fee; monitoring. This paragraph applies to a nonapproved facility which is subject to the $1,000 base fee under par. (b) 2. and which is required by the department to conduct monitoring under s. 144.44 (4) (f) 289.31 (7). The base fee under par. (b) 2. shall be reduced by the cost of monitoring for the calendar year to which the base fee applies, or $900, whichever is less.
227,604
Section 604
. 144.442 (3) of the statutes is renumbered 289.67 (4), and 289.67 (4) (a) and (b), as renumbered, are amended to read:
289.67 (4) (a) Imposition of environmental repair surcharge. If the owner or operator of a nonapproved facility is required to pay a tonnage fee under s. 144.441 (3) 289.62 (1), the owner or operator shall pay to the department an environmental repair surcharge for each calendar year.
(b) Amount of environmental repair surcharge. 1. With respect to solid or hazardous waste disposed of at a nonapproved facility for which the owner or operator enters into an agreement with the department to close the facility on or before July 1, 1999, the owner or operator shall pay to the department an environmental repair surcharge equal to 25% of the tonnage fees imposed under s. 144.441 (3) 289.62 (1). The 25% surcharge first applies for the calendar year in which the owner or operator enters into a closure agreement. If the owner or operator fails to comply with the closure agreement, the department shall collect the additional tonnage fees which would have been paid by the owner or operator under subd. 2. in the absence of the closure agreement.
2. With respect to solid or hazardous waste disposed of at a nonapproved facility for which the owner or operator has not entered into an agreement with the department to close the facility on or before July 1, 1999, the owner or operator shall pay to the department an environmental repair surcharge equal to 50% of the tonnage fees imposed under s. 144.441 (3) 289.62 (1).
227,605
Section 605
. 144.442 (4) of the statutes is renumbered 292.31 (1), and 292.31 (1) (d) 3., as renumbered, is amended to read:
292.31 (1) (d) 3. The identity of subsidiary or parent corporations, as defined in sub. (9) 292.31 (8) (a) 3., of persons who generated, transported, treated or stored waste which was disposed of at the site or facility.
227,606
Section 606
. 144.442 (5) of the statutes is renumbered 292.31 (2), and 292.31 (2) (a) to (c) and (f), as renumbered, are amended to read:
292.31 (2) (a) Methods for preparing the inventory and conducting the analysis under sub. (4) (1).
(b) Methods for remedial action under sub. (6)
(3).
(c) Methods and criteria for determining the appropriate extent of remedial action under sub. (6)
(3).
(f) Means of making the most effective use of the grant program under sub. (9m) s. 292.61 so as to encourage the greatest number of political subdivisions to undertake remedial action on property that they own.
227,607
Section 607
. 144.442 (6) of the statutes is renumbered 292.31 (3), and 292.31 (3) (b) 7., (d) and (f), as renumbered, are amended to read: